Permit Reciver Question

You might also like

Download as pdf
Download as pdf
You are on page 1of 10
WORK PERMIT PROGRAM dua Saideat PPL EPO OO OE OP PEP OEE OPEN [Read carefully the following questions. Reviow all the multiple-choice answers and circle the correct answer. There is ONLY ONE correct choice.] 1. Before most work in any Sadaf facility can be started the workmen must obtain advance approval in the form off A. Asafety clearance pass. B. — Accitical path maintenance analysis. C. Awairehouse materials order. Re — Awork permit. 2. Before issuing a work permit, the authorized issuer and the acceptor must: Contact the plant superintendent for permission, Shut down all operations in the operation zone. Order a gas test. Make a joint inspection of the work area. \poe> 3. Excavation shall be considered as a confined space if it is deeper than: 1 Meter 1.2 Meters 1.5 Meters 2 Meters 4, Hazardous work permits may be issued: By any authorized issuer from the area where the work is to be done. Only by authorized maintenance supervisors. Only by authorized operations supervisors. None of these answers. pose 5. According to SADAF policy, safety is the responsibility of: A, Management. B. Authorized operations Supervisors. C. The Safety Department. 2. Each employee. BERR EE PR IE AE PN PI, +1 v>Saudi Petroehemical Company. (Sadat) Page t of 10 sat een Tesi 36100 ; WORK PERMIT PROGRAM. Aa Seidler SP GI APR TB ie 6. When vessel entry is required, the vessel must be pumped out and isolated. To get a good (Passing) gas test, it usually must also be: A. — Ventilated. B. — Blanketed. C. Purged with nitrogen. D. Purged with steam, 7. The authorized issuer is responsible to: A. Issue the work permit at the control room even if the equipment is located at the field, Issue the work permit in any location, Visit the job site with the acceptor and issue the permit at the job site. Ask his supervisor where to issue the work permit, 8. If portable electric tools or lighting are used in confined spaces, the following requirements must be met: A. All electrical tools and lighting must have a properly connected electrical ground. B. ‘The voltage must be limited to 120 volts maximum. C. _Alltools and lights must be protected by Ground Fault Interrupter (GF). D. —_Allof the answers are correct. 9. Utilities & Distribution department are responsible to issue permits for, A Ail electrical work Jess than 4.16 KV in all substations, B. _Alllelectrical work less than 24 volts, G. Alltransformer yards on the plants. D. None of the answers are correct, 10. Pneumatic tools used in confined spaces may only be driven by: A. Nitrogen. 3B Ait. | C. Water, D. Any compressed gas. LL Entry into a cleaned and ventilated process vessel is an example of: A Hazardous work, Be Safe work, PEE I NR API IN I EO ai So, Saudi Petrochemical Company (Sadaf) on Page 2 of 10 ‘Test #36180 WORK PERMIT PROGRAM ia salelat PNP OLLIE 12, The tag which accompanies a lock installed to prevent energizing an electrical unit A. Notes the lock number B. Notes the name of the person installing the lock and his employee number, c. Notes the date and time it was installed. D._— Allofthe answers are correct. 13, All toxic gases found in this plant: 4. _Arelighter than air and can be avoided by staying close to the ground. B, Can be readily detected by smell 4. Are not easily detected by the senses and require test equipment to determine if a hazard exists. D. Can be readily detected by sight. 14, Before any work is done, the work area and equipment should be: A. Left alone because everything is okay. B. Operated at capacity to maintain as much production as possible. C. Properly prepared for the work to be done. D. Closed off for at least two hours. 15. Operation of internal combustion engines in a process area is an example of: Hot work. Safe work. 16, For any hot work job, the minimum fire protection shall consist of: A Two (2) 30 Ib, Carbon Dioxide (COz) extinguishers. B. ‘One (1) 30 Ib. Dry chemical and One (1) Carbon Dioxide (CO2) extinguisher. C. One water hose. D.. Two (2) 30 Ib. Dry chemical extinguishers, PE A PTE RT Bi PE TP \ Saudi Petrochomical Company (Sadaf)os- sa ro Page ofan #5» are axe Tost 36180 tae?

You might also like