OFFICE OF THE CHIEF ENGINEER eNH) P.W.D. R,A.JASTHAN .

JAIPUR
No. F-7(458)/SE-PPP-NH/EPCID_ ~~J_O Date: IljOY/YD/a

Project Director cum Superintending Engineer


PWD, NH Circle Jodhpur

Sub: - Widening and strengthening of NH-65 to four lanes with paved shoulders from
existing Km 267+500 to 296+070 (Netra village to Mandore section) in the State
of Rajasthan on EPe mode basis - Extension of Time reg.
Ref.:- Your letter No. SEINH/Jul2018-191l741 dt. 27.08.2018
Sir,

Please refer above letter under reference submitted therewith the proposal for
Extension of Time upto 09.09.2018 of Contractor Mis Gannon Dunkcrely & Co. Ltd.
but 09.09.2018 has already lapsed and work has not been completed till date. In this
regard, the proposal is returned herewith with the direction to submit the revised
Extension of Time as per work completed programme.
Encl.:- Ala.

(
No. F.7 (458)1 BOT/PPP-NH/D- 'S)--o
Copy to following for information & necessary action at the earliest _
I. EE PWD Nfl Dn. Jodhpur
2. AE Mis SA Infrastructure Pvi. Ltd. Jodhpur
3. Mis Gannon Dunkercly & Co. Ltd.

D:\Desktop\NetworkData(191.168.].104)\Vishal\SwamiJl Letter.docx