Scope
Welcome to our irst Hong Kong tion cost. The variety of building to enjoy this issue of PERI Scope,
edition of PERI Scope, showcasing projects ranges from building works and thereby familiarise yourself
six interesting projects, aswell as our on SCL train staitions, to the Hong with some of the exciting projects
work with the Construction Industry Kong Breast Cancer Foundation PERI are involved in, in Hong Kong.
Council and of our products which are Center, Ngau Chi Wan.
ideal for the Hong Kong construction As a family owned and operated
market, DUO, ALPHAKIT, and VST PERI has a number of products that company, PERI continues to be
Heavy Duty Shoring Towers. are tailor made for the Hong Kong 100% focused on the development
market. Our ALPHAKIT is a light of formwork and scaffolding systems
weight, high strength shoring system. that will create beneits for all of our
Our recent Civil Engineering projects It provides an allowable leg load customers. We irmly believe that the
stretch across the Hong Kong SAR. of 300 kN, and is completely man lourishing of Hong Kong as a pros-
The M+ Museum in the West handle-able, requiring no crane for perous and dynamic city lies, among
Kowloon Cultural District is the new assembly. It is ideal for heavy duty others, in the strength of its institutions
museum for visual culture in Hong civil works. In residential developments, and businesses, for that reason it is
Kong, focusing on 20th and 21st the Hong Kong construction industry our ambition to join efforts with public
century art, design and architecture, is facing tough challenges in the years organisation’s and private construction
and provides a fascinating challenge to come; a shortage of skilled workers, company’s to continue propelling
to construct. The West Kowloon Rail and a high demand for residential the development of our city.
Terminus, which will house the only buildings. PERI DUO is the solution.
station within the HKSAR section of A simple formwork system to build As ever, we thank you for your coni-
the Express Rail Line to the mainland, safely, quickly and economically. dence in PERI and look forward to
has an iconic roof structure, and will working together on your next project.
cut commute time to Guangzhou to Our hydraulic climbing systems, for
just 48 minutes. Further south, the cores, safety screens and formwork,
Shatin to Central Line Cross Harbour combine excellently with DUO form- Signature
Tunnel, contract SCL1121, was work to offer the optimal solution
accelerated thanks to PERI Formwork for residential and commercial high-
Systems TRIO and DUO. In the North rise projects.
of Hong Kong, at the Liantang Bound-
ary Control Point, PERI DUO is being Whilst PERI is well known for its
utilised to construct 11 buildings. formwork and scaffolding systems
This ultra light, labour saving formwork around the world, we are less well Rory O‘Gara
enables the construction cycle to be known here in Hong Kong, our Managing Director
accelerated and reduces the construc- newest market. I hope you ind time PERI (Hong Kong) Limited
2
Wall and Slab: one system.
Universal. Lightweight. Simple.
3
Overview of XRL Contract
810A Birdcage Scaffold
4
5
The West Kowloon Terminus Station nine long-haul and six shuttle plat- of façade, glass and cladding for this
North is the largest civil contract forms, customs and immigration feature roof. PERI Hong Kong provided
awarded for the Hong Kong Section of facilities, departure lounges, duty the client with onsite engineering
the Guangzhou-Shenzhen-Hong Kong free and other retail outlets on four support, project management and
Express Rail Link. Located in the heart levels. A key element of the project over 100 2D and 3D design drawings.
of Kowloon, the terminus will serve is the dramatic roof structure above The access scaffold has a number
as Hong Kong's international gateway the station entrance made up of of unique and bespoke features
to China. over 7,000 tonnes of steel trusses including access ways for construction
and elaborate support columns. vehicles, hoist wells, stair towers,
Leighton-Gammon Joint Venture are clear span openings for ongoing
constructing a 380,000 square metre PERI UP Access Scaffold has been concrete works below, working areas
underground terminus, which includes utilized for the complicated installation around mega columns, protection
Initial PERI UP installed to 60 m high. Multiple working levels throughout. Fully boarded safe working areas.
6
2,000 tons of PERI UP on the
Express Rail Link Project
Express Rail Link Contract 810A, Hong Kong
7
PERI provided Typhoon Proof storage. PERI UP LGS
(Lattice Girder System) with 40 m clear span
Express Rail Link Contract 810A storage area, Hong Kong
Contractor
Leighton-Gammon JV
Field Service
PERI (Hong Kong)
Limited
Adrian Ferguson,
Sub Agent:
“We are delighted to work
alongside PERI with providing
our project and client with
technical solutions backed up
by enormous project experience
and ability. This system has
given our project a solution of
adaptable temporary storage
at a fraction of the cost of ware-
house rental”
External view of the temporary storage area . PERI are providing covered storage at two locations.
In addition to supplying access scaffold LGS (Lattice Girder System) structure travel on rails, allowing customers
on the Express Rail Link project, PERI is designed to accommodate large to easily slide the cover to the area
provided a total of 8,000 m2 of covered spans, high loads, and Hong Kong where works are on going. Due
storage to Leighton-Gammon JV. climate conditions. to the limited and costly supply
Four warehouses were provided with of covered storage in Hong Kong,
the use of PERI UP Flex Weather The roof is assembled in single LGS can be used as an alternative
Protection Roof LGS. This provided movable girder segments. By doing solution. With its high adaptability
LGJV with much needed dry storage so, it allows the easy opening of the and fast erection, complete weather
space for their façade and glass works. roof, e.g. for the delivery of materials. protection can be realized, with
The crane lifts the complete segment different inclinations and geometries
Temporary and protective rooing quickly and safely into position after to suit any requirement.
facilities can be quickly and easily pre-assembly on the ground.
realized. The system can be used PERI are looking forward to provid-
for jobsites during the typhoon It also provides a high level of safety ing weather protection solutions
season, allowing works to continue both during assembly as well as use. to further projects in Hong Kong so
without any delays, or as dry As an option, the roof can be designed you can build through the monsoon
storage facilities as in this case. as a movable version, whereby it can season.
8
PERI UP Easy,
the new Facade Scaffold from PERI
A real alternative to Bamboo in Hong Kong
PERI UP Easy Facade Scaffolding Consistently following the metric grid Technical details
stands for simple and fast assembly. design, the system also includes a ■■ Standard coniguration with a
PERI UP Easy is lightweight among 1 m wide frame which can, as an 670 mm system width / 660 mm
the range of steel facade scaffolds alternative, be used with 25 cm steel decking width
on the market. In addition, it provides decks from the PERI UP Flex Modular ■■ For use as working scaffold in accor-
safety in the system, as the guardrail Scaffolding system. dance with DIN EN 12811-1:2004-03
for the next level is installed from ■■ Can be used as safety
the scaffolding level below using the Lightweight and roof edge safety scaffold
Easy Frame without any additional Fast working operations due to the low ■■ One-piece combi-decking with
components. Through the rosette weight of the individual components integrated protection against
nodes on the frame, the system can High level of safety lifting, can be loaded up to max
also be combined with the PERI UP At all times operatives are protected 2.00 kN/m² with FOS 3
Flex Modular Scaffolding. from falling due to advance guardrail ■■ One-piece steel decking with inte-
construction grated protection against lifting, can
The PERI UP Easy has a system Fast assembly be loaded up to 3.00 kN/m² with FOS 3
width of 670 mm. It can be used Assembly with virtually no couplings ■■ Gap-free decking surfaces
with either a one-piece board or with and a minimum of tools without separate gap coverings
two steel decks each 330 mm wide. Special application versatility ■■ Internal bracket decking, removable
The integrated protection against Can be combined with PERI UP Flex for use on external walls with a
lifting is featured in both decking system components thermal insulation system
versions. This is not only quick and ■■ Fast opening and closing of scaffold
safe but also allows the opening and bays, e.g. for the transport of
closing of individual scaffold bays, materials
e.g. for transporting materials.
9
Timely construction with Contractor
Hsin Chong
Field Service
VST Heavy-Duty Shoring Towers PERI (Hong Kong)
Limited
Located in the centre of M+ Museum to be erected support. To do this an Most importantly, PERI
the West Kowloon Cultural without any interference ingenious arrangement of cares about our needs.
District, M+ is Hong Kong‘s to the existing structures. steel trusses and shoring We received enormous
new museum for visual The mega trusses will towers was planned. PERI support from all depart-
culture. The museum occu- transfer the loads from the provided a total of 60 VST ments especially the
pies an area of approxi- inished museum onto piles towers, with heights varying engineering team, who
mately 60,000 square built at each side of the cut from 6.50 m to 15.50 m provided us with compe-
metres, and is comprised and cover tunnel structure. and an average leg load of tent and professional
of a 14 storey tower, a 600 kN. For these towers technical advice
3 storey Podium and a The construction method several non-standard throughout.”
2 storey Basement. for these mega trusses is conigurations had to be
noteworthy. The dirt cover designed, notably, double
For the challenging con- of the tunnel is removed to legged towers, situations
struction of this building, allow a maximum loading where two legs had 15 m
on top of the MTR airport of 30k N/m2 on the top slab and 2 had 6.50 m and scheme, meaning clients
express line, one of the of the tunnel, as indicated towers with very small advise one day prior which
most important transporta- by the original designer of dimensions in plan view. tower would be erected
tion networks in Hong Kong, the tunnel. Our client, Hsin In addition, PERI performed and preassembly work
5 concrete-steel composite Chong, designed an intricate preassembly work at the would be arranged. Optimal
mega trusses are under temporary works scheme stockyard, provided site services were provided to
construction. The trusses in order to spread all the assistance with an on-site the client, hence reducing
span above the rail tunnel in construction loads and supervisor, and followed labor costs and time con-
West Kowloon, enabling the obtain suficient area of a “just-in-time” delivery suming tasks.
10
Fast assembly. High load-bearing.
VARIOKIT Heavy Duty Shoring Tower VST
Fast assembly
with bolted connections and pre-assembled tower segments up to 10 m.
Cost-effective solution
as all system components are available in the PERI stockyards.
11
Bespoke solutions for every project
Civil Engineering group and Tunnel Expert team
VST Heavy-Duty Shoring Towers and VRB Heavy-Duty Truss Girders were used in the construction of this challenging Bridge project.
12
RCS Climbing Protection Screen
Flexible. Adaptable. Crane-free. Maximum protection.
The RCS Climbing Protection Screen together with Guardrails provide gap-free protection for work carried
out on the building shell loors. The screen completely encloses the top loors of the building shell which
are under construction. The enclosure protects site personnel against falling and strong winds at great
heights, thereby enhancing construction eficiency. Landing platforms can be integrated in the RCS protection
panel solution, allowing fast and simple transport of materials. The screen at the same time is served as
widely visible advertising space.
13
Cross Harbour Tunnel accelerated Contractor
Penta-Ocean-China
State JV
with PERI System Formwork Field Service
PERI (Hong Kong)
Limited
Shatin to Central Link Contract 1121 , Cross Harbour Section
SCL 1121 will extend East Rail Line PERI TRIO was supplied for a 5 month onsite formwork instructor for the irst
from Hung Hom. The Cross Harbour period to enable Penta-Ocean-China two months of construction to assist site
Section includes the construction of State JV to accelerate the completion personnel and familiarize the operatives
the 4th harbour railway tunnel in Hong of the tunnel segments. The TRIO with the system. The embedded safety,
Kong, and it connects Hung Hom and panels were supplied with propping, ixed tie positon and integrated platform
Causeway Bay Typhoon Shelter. This access walkways, certiied crane lifting access signiicantly reduced safety risks
1.7 km cross-harbour tunnel beneath device, formwork ties and handrails. It on site, thereby minimizing the super-
Victoria Harbour will be built by using was a simple case of lifting the panels vision requirements. TRIO proved once
immersed tube tunnel construction from the delivery vehicle directly into again that can perform in many markets,
method, comprising tunnel units position so that rebar could be placed and we look forward to utilizing this pro-
pre-cast at the casting yard in Shek O. and concrete poured. PERI provided an duct on many more projects in Hong Kong.
As a global leader in the manufacturing of shoring systems, PERI provides clients with enormous lexibility
by offering a wide range of props that can suit virtually any geometry as well as different loads.
14
PERI demonstrated high competence
in building construction
Hong Kong Breast Cancer Foundation Center, Hong Kong
15
PERI DUO contributing to
cross-border transport development
Liantang / Heung Yuen Wai Boundary Control Point, Hong Kong
Contractor
Leighton Contractors
(Asia) Ltd.
Subcontractor
United Engineering
Safe Work Ltd.
Field Service
PERI (Hong Kong)
Limited
Jack Maharjan,
Project Manager:
“DUO provides us with great
lexibility compared to traditional
formwork. Its extremely light weight
enables faster manual erection and
striking. With DUO, construction
time and labour cost are reduced,
and the safety standard together
with the quality of concrete surface
formed is enhanced. We are more
than happy to recommend PERI
DUO Formwork to others.”
As the seventh land crossing between structures. The total construction no longer a constraint in the construc-
China and Hong Kong, Liantang/Heung loor area of all buildings in the project tion speed, rather the availability of
Yuen Wai Boundary Control Point is about 157,400 square metres. substantial work fronts.
(BCP) will connect with the Shenzhen Seeing the advantages of DUO,
Eastern Corridor and provide an access subcontractor United Engineering The X-Ray Vehicle Inspection Inbound
to eastern Guangdong, facilitating have embraced the system and are wall, was one of many structures
future regional cooperation and enjoying the labour and cost saving completed with DUO. The 12 m high
development. beneits. United Engineering need wall was poured in 2 lifts of 6 m.
to deliver 150,000 m2 of formed The unique features of DUO allowed
Leighton Asia is the sole contractor concrete, and DUO is helping them the form to be assembled by hand on
for the construction of a passenger achieve their targets. the irst pour, before being struck in
terminal building and nine other main gangs and lifted easily to the next pour.
ancillary buildings including ire and Over 1000 m2 of DUO Formwork Panel
police bases, vehicle examination is currently being cycled to achieve Columns, T-Junction walls, pile caps,
buildings and a number of bridge impressive results. The formwork is monolithic pours and standard build-
ings are among the many structures
that United Engineering have utilised
the system on, and the results have
been the same in each case; a good
concrete inish, fast assembly, a high
level of safety and reduced labour
requirement. DUO offers a real
alternative to traditional formwork
methods in Hong Kong.
16
Engaging with customers
DUO workshop and seminar with HKCIC
Group picture of 28 formwork carpenters who attended a DUO seminar at our stockyard. Sales Engineer Jeff Leung is presented
a certiicate by CIC representative.
PERI embraced the opportunity to PERI as the leading manufacturer eficient, versatile and economic. One
connect with the one and only statuto- of formwork and scaffolding systems, of our main interests is to continue work-
ry body in the Hong Kong construction basic concept regarding the use ing with the CIC and our clients in joint
industry, the Construction Industry of PERI DUO and a practical session efforts to ensure the safety of workers.
Council (CIC). On 4 July 2016, PERI’s where participants could experience DUO Formwork incorporates scaffolding
irst HK customer training was held one of the most powerful features components that can be combined with
at the Council’s training centre in of the product – the extremely low other PERI scaffolding to ensure greater
Kowloon Bay. weight. safety. We irmly believe that the lou-
rishing of Hong Kong as a prosperous
Following the success of the irst Being aware of the challenges and dynamic city lies, among others, in
workshop, PERI organized another that Hong Kong faces, a shortage the strength of its institutions, for that
DUO Formwork and Plywood seminar of workers and the need to meet a reason it is on our best interest to join
for CIC formwork instructors at our high demand for new residential efforts with the Construction Industry
stockyard on 29 December 2016. properties in a short time, DUO aims Council and other public and private
The seminar was comprised of the to be the best ally of the Construction organizations to continue propelling the
following sessions: introduction of Industry in Hong Kong because it is development of our city.
ALPHAKIT
New 300 kN crane independent shoring for medium to heavy bridge construction
Fast assembly
due to high load-bearing fasteners with only 2 itting
pins per connection
17
PERI participating in building Contractor
Leighton – LNS JV
Field Service
a sustainable environment PERI (Hong Kong) Limited
Circular Shaft Form constructed with VARIO GT 24 Girder Wall Formwork and the RCS Rail Climbing System.
To restore Hong Kong‘s Harbour to a shaft to Leighton – LNS JV. VARIO both productivity and eficiency were
more natural and healthier condition, panels were pre-assembled on the achieved. Various shaft shapes were
the Government implemented the ground to reduce the requirements to constructed, including elliptical and
Harbour Area Treatment Scheme work at height. Due to the 125 mm circular, all of which were climbed
(HATS), which is one of the most hole arrangement of the climbing rails, using PERI hydraulic climbing systems.
important environmental protection the platforms can be climbed in any PERI provided on site support through-
programmes ever undertaken in Hong increment of 125 mm, therefore the out the project, offered advice during
Kong. The HATS Stage 2A involved the climbing height could be optimally assembly, installation, climbing and
construction of a sewage conveyance adapted to suit the respective storey dismantling. PERI look forward to
system on the Southern part of Hong height. A fast, reliable and trouble-free working closely with both contractors
Kong Island. PERI provided a solution operation was ensured during the again in the future, and on many more
of combining VARIO GT 24 Girder Wall hydraulic climbing of the shaft lining climbing projects in Hong Kong.
Formwork with the RCS Rail Climbing formwork. With PERI’s comprehensive
System for the construction of the engineering solution, the JV ensured
18
NEW – ACS Core 400 Climbing System
Single Stroke Self-Climbing Formwork
The new PERI ACS Core 400 Climbing System makes forming concrete
cores on high-rise buildings faster, safer and more eficient than ever before.
The new heavy duty hydraulics lift the entire platform, placing boom,
formwork and suspended external platforms to the next level in only 20 minutes.
Reduced assembly times result in labor savings and increased safety.
19
Korea
Seoul
Japan
Tokyo
Hong Kong
Stockyard
Regional Distribution Center
All delivery times < 14 days
Thailand Philippines
Bangkok Manila
Vietnam
Ho Chi Minh Philippines
Cebu
Malaysia
Kuala Lumpur
Singapore
Indonesia
Batam
Our storage facility in Tin Shui Wai, New Territories, spans over 5,000 square
The PERI Stockyards across the APAC region enable us to handle projects of all
sizes and specifications. We permanently store the comprehensive PERI product
portfolio in big quantities. As a result, we are always able to deliver according to
the requirements of your project. Furthermore, an efficient Supply Chain
Management guarantees fast handling of your order.
The photos used in this brochure feature certain situations PERI (Hong Kong) Limited
at particular moments on various construction sites. Formwork Shoring Engineering
Additional images, e.g. regarding safety and anchor details, 19D, Tower B, Billion Centre
cannot always be considered as conclusive or final.
1 Wang Kwong Road
These are subject to the risk assessment carried out
by the contractor.
Kowloon Bay
Tel. +852 3102 7900
© PERI GmbH Fax +852 3188 9258
info @perihk.com
www.perihk.com