Professional Documents
Culture Documents
GG VCZZZXCX 230320 VCCCYFYX SVC VCCC System Will Be Shut Down BTN 0330-0400utc Due Maint at Vccc. Will Inform When Back To NML Ops
GG VCZZZXCX 230320 VCCCYFYX SVC VCCC System Will Be Shut Down BTN 0330-0400utc Due Maint at Vccc. Will Inform When Back To NML Ops
GG VCZZZXCX 230320 VCCCYFYX SVC VCCC System Will Be Shut Down BTN 0330-0400utc Due Maint at Vccc. Will Inform When Back To NML Ops
1. I) consider that you are working at Ratmalan MSC. Duty Engineer informed that there will be
planned outage from 0330UTC – 0400 UTC due maintenance at Ratmalana. Now the time is
0320 UTC.
GG VCZZZXCX
230320 VCCCYFYX
SVC VCCC SYSTEM WILL BE SHUT DOWN BTN 0330-0400UTC DUE MAINT
AT VCCC.
WILL INFORM WHEN BACK TO NML OPS.
ii) At 0350 UTC Duty Engineer informed that the maintenance is over.
GG VCZZZXCX
230350 VCCCYFYX
SVC VCCC SYSTEM BACK TO NML.
RPT ALL MSGS DURING 0330-0350 UTC
2. Consider that VCCC/VABB/VCCC Circuit unserviceable and you received the following
message,
FF VCCCYFYX
230730 VTBBYFYX
SVC QSP VA VO VI
3. At 0508 UTC you observed on VABB CCT indicates “idle”. Write down the actions you are
going to take.
4. At 0610UTC duty engineer informed that VABB CCT now back to NML. Write down the
actions you are going to take.
4. At 1030UTC on VRMM CCT indicates “idle”. Write down the actions you are going to take.