Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ENGINE REMOVAL AND INSTALLATION <TILT CAB>

<FG>

Removal sequence
1 Roll stopper
2 Transmission
3 Engine

Installation sequence
Follow the removal sequence in reverse.

CAUTION
• Be careful not to let the engine hit the cab or the rear body when hoisting the engine.
• Only use hoisting equipment appropriate for the engine weight (approximately 500 kg).

Tightening torque (Unit: N·m {kgf·m})


Mark Parts to be tightened Tightening torque Remarks
Bolt (front mounting installation) 50 to 65 {5.1 to 6.6} –
Bolt (roll stopper bracket installation)
45 to 65 {4.5 to 6.5} –
Bolt (rear mounting installation)
Bolt (transmission installation) 47 {4.8} M10 × 1.25
Bolt (transmission installation) 82 {8.4} M12 × 1.75

11-14

You might also like