Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

RADIATUS MADU (RDM)-001

STUCKPIPE DECISION TREE ACTION PLAN


STUCK PIPE @ 2099.58 M PLAN EXECUTION

DO WORK ON PIPE
1. Jar Down with maximum trip load, applied Torque
2. Stop or reduce circulation when cocking the jar and when jarring down (due to pump open force
effects). Note : Pump Pressure will increase the hydraulic jar up-blow, and decrease the down blow.
3. Continue jarring (Down and Up) until string is free. Jarring for 10 hours may be necessary.
Do this till 24 hours since stuck happened

YES CAN IT NO
FREE ?
1. Run primacord 10 lilitan @2070 m, Unsuccessful
Do : Do : 2. Run primacord 13 lilitan @2046 m, rangkaian terlepas belum
1. Increase the circulation to maximum 1. Run Free point indicator tool sesuai kedalaman rencana di 2046 m
3. Run colliding tool di 2046 m, string tidak berhasil putus
rate, rotating and working the string.. (FPIT)
4. Run colliding tool di 2027 m, string tidak berhasil putus
2. Pump low viscosity mud with high 2. Prepare and do mechanical / 5. Mechanical back-off hingga 13 kali, apply pressure 3000 psi
GPM wireline back off (Primacord sambil WOP string berhasil bebas (152.5 jam), panjang fish
3. Mud Conditioning to MW SG 1.80 can do back off till 6½’ Float 72 m (TOF @ 2027 m)
4. Ream the hole section thoroughly Sub – 8.58 m above bit) 6. RIH 8½” PDC Bit sampai 1947 m, naikkan SG dari 1.50 ke
5. Circulate the hole clean as required. 1.70, reaming sampai 2025 m, string kembali terjepit, WOP
6. Continue open hole logging bebaskan jepitan cabut satu stands rangkaian kembali terjepit
di 2011 m, sedang WOP.

YES CAN IT NO
FREE
ABOVE
MOTOR?
Plan Do & Act:
Do: Do Fishing Job : 1. Run FPIT
1. Run BHA Rotary tag 1. First Run, BHA Rotary 2. Do String shoot Back off or Mechanical
TOF, Mud tag TOF, Mud Back off, target minimal @ X/O depth
Conditioning to MW Conditioning to MW SG
SG 1.80 1.80 1952 m
2. Cement Plug Job. 2. Run Washpipe BHA, 3. Do Trip for logging
3. Continue Job wash the Fish 4. Do Open hole logging
Openhole Logging 3. Run Fishing BHA w/
reconnect or Overshot 5. Do Cement Plug to plug the fish
c/w fishing jar 6. Trip & Run Liner 7”

You might also like