Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Level 3 Media Cambridge Technical

LOCATION RECCE
LOCATION
Field behind black bear park
LOCATION ADDRESS
Warrington, Latchford,

TYPE OF BUILDING/STRUCTURE/LANDSCAPE
exterior, park

WHY IS THIS LOCATION SUITABLE FOR YOUR PROJECT?


It is suitbale as it fits the theme of country music for my front cover

ACCESS

TRANSPORT LINKS TO LOCATION: PHYSICAL ACCESS TO SITE:


Walking Using the pathways to the park.

GENERAL INFORMATION
People who might be affected by recording in this location:
Members of the public walking by.

Precautions/measures taken to minimise the impact of your recording:


When people walk by, stop recording and also try to make minimal noise in order for us to not disturb people who are on
a peaceful walk through the park.

No available power sources but we will make sure the batteries are fully charged
Power sources available
to not bring the risk of the camera dying.
Catering There isn't catering available apart from at the college.
Toilets The nearest available toilets are also located at college.
We each have the contact number of each individual involved with the production
Telephones
of this video
Daylight times (if recording outside) morning and afternoon
Locals/Authorities to be contacted no form of authority will need to be will question us as we will be filming in a
public area.

Measurements of space used on location: (Use paces if necessary)


We are using approximately 10 paces as the area we are using is a park bench and the surrounding area.

Describe any restrictions/hazards in the immediate vicinity:


The trees have branches which are a potential hazard and also the ground get pretty slippy in the wintertime.

Where will the crew work on this location?


The crew will be working across from the bench as the busker on the bench is the focus for the vast majority of the shots in
the video.

Where will the cast work on this location?


The cast will be working on and around the bench.
Level 3 Media Cambridge Technical
TOP 3 RISKS IDENTIFIED ON LOCATION
(N.B. this does not replace the Risk Assessment form which must be carried out for any practical project)

Ice due to the winter cold as well as the many puddles commonly found around the area

Tripping over the equipment

The many sticks and branches hidden away in the park

You might also like