Professional Documents
Culture Documents
City of Los Angeles Peer Review Process
City of Los Angeles Peer Review Process
Presented
to:
Advances
in
Structural
Design
for
Seismic
Regions
Los
Angeles
Tall
Building
Structural
Design
Council
Colin
Kumabe,
S.E.,
M.S.,
M.B.A.
Chief
of
Building
Plan
Check
City
of
Los
Angeles,
Department
of
Building
and
Safety
Purpose
Describe
the
process
used
by
the
City
of
Los
Angeles,
Department
of
Building
and
Safety,
LADBS,
for
the
approval
of
the
buildings
analyzed
and
designed
using
the
Performance
Based
Design
methodology.
1
6/19/13
Process
Overview
1. Developer
acknowledge
benefits
achieved
with
performance
based
design
2. Request
LADBS
to
initiate
process
3. LADBS
selects
Peer
Review
Panel
4. Discuss
and
approve
Design
Criteria
and
Ground
Motions
5. Approve
final
analysis
and
construction
plans
2
6/19/13
3
6/19/13
Section
16.2.5
of
ASCE
7-‐05
and
ASCE
7-‐10
require
panel
members
to
be
of
appropriate
disciplines
and
others
experienced
in
seismic
analysis
methods
and
the
theory….
One
academic
researcher
One
structural
engineer
One
geotechnical
engineer
Approved
by
the
Peer
Review
Panel
based
on
site
geology
and
structure
type
Design
Criteria
Proposed
by
the
Design
Team
(good
to
start
with
the
LATBSDC
methodology)
Approved
by
the
Peer
Review
Panel
4
6/19/13
5
6/19/13
Thank
you
Questions?
6
6/19/13
7