EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
The exchanger shall be completely drained and thoroughly dried. Low 32-SAMSS-007,
A2
point drains or nozzles showed no signs of moisture or free water. Para. 7.3.17
G.I.-2.710-6,
A3 Desicants used are confirmed to be removed.
Sec. 5.11-b & e
The internals of the header boxes are cleaned of all slag, scale, dirt, grit, 32-SAMSS-011,
C1
weld spatter, paint, oil, etc. Para. 9.1.19
The tube sheets are cleaned of all slag, scale, dirt, grit, weld spatter, oil, 32-SAMSS-011,
C2
etc. Para. 9.1.19
The internal surfaces of the header boxes and tube sheets are
32-SAMSS-011,
C3 completely drained and thoroughly dried. All low point drains and nozzles
Para. 9.3.10
showed no signs of moisture or free water.
Page 1 of 2
SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004)
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Internal Cleanliness Inspection of Heat Exchangers SAIC-E-2009 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Lube-oil and seal-oil exchangers are cleaned and meet the cleanliness
SAEP-1028,
C4 requirements per cleaning procedure approved by SAPMTand the
Sec. 4
Facility Operating Dept.
Desicants used during shipment and storage are confirmed to be G.I.-2.710-6,
C5
removed. Sec. 5.11-b & e
REMARKS:
NOTES:
a. This Checklist shall be used in conjunction with the Final Closure Authorization Form, SATR-D-2003.
REFERENCE DOCUMENTS:
1. 32-SAMSS-007 -- Manufacture of Shell and Tube Heat Exchangers, 31 May 2003
2. 32-SAMSS-011 -- Manufacture of Air-Cooled Heat Exchangers, 31 May 2003
3. 32-SAMSS-028 -- Manufacture of Double Pipe Heat Exchangers, 30 July 2003
*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED
Page 2 of 2