Professional Documents
Culture Documents
Sample DTR
Sample DTR
I CERTIFY on my honor that the above stamement are true are and correct and the services were
rendered and more applied to the public service within the DPWH, Romblon Field Engineering Office,Philippines,
on June 17, 2019.
I HEREBY CERTIFY on my honor that the record of hours of work was made daily at the time of
arrival at the time of departure from Office or beginning and ending of work.
Prepared by: Checked by:
KS
t Engineer in supervision of
and, Magdiwang Bridge
ane) and Approaches along
acement of Punong Bridge,
ferential Road ( Phase -2,
- 6, Phase -7, Phase -8, and
)
t Engineer in supervision of
and, Magdiwang Bridge
ane) and Approaches along
acement of Punong Bridge,
ferential Road ( Phase -2,
- 6, Phase -7, Phase -8, and
)
ervices were
g Office,Philippines,
. BRONCE
neer/ Engineer II
keeper)
G. SERRANO
uction Division
No. Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MONTHLY PERFORMANCE
Region IV-B, MIMAROPA OUTPUTS REPORT
EDSA, Diliman, Quezon City
NAME OF EMPLOYEE OFFICE (SECTION/DIVISION/SERVICE)
KRISTINE MONIQUE M. ROSAS CONSTRUCTION DIVISION
PERFORMANCE OUTPUTS
WEEK 1 WEEK 2
Assist Project Engineer and Resident Engineer in supervision of Assist Project Engineer and Resident Engineer in supervision
Regional Projects in Sibuyan Island, Magdiwang Bridge of Regional Projects in Sibuyan Island, Magdiwang Bridge
( Construction of 1(one) Additional Lane) and Approaches ( Construction of 1(one) Additional Lane) and Approaches
along Sibuyan Circumferential Road, Replacement of Punong along Sibuyan Circumferential Road, Replacement of Punon
Bridge, and Concreting of Sibuyan Circumferential Road Bridge, and Concreting of Sibuyan Circumferential Road
( Phase -2, Phase - 3, Phase -4, Phase -5, Phase - 6, Phase -7, ( Phase -2, Phase - 3, Phase -4, Phase -5, Phase - 6, Phase
Phase -8, and Phase -9) -7, Phase -8, and Phase -9)
WEEK 3 WEEK 4
WEEK 2
nd Resident Engineer in supervision
ibuyan Island, Magdiwang Bridge
Additional Lane) and Approaches
ential Road, Replacement of Punong
of Sibuyan Circumferential Road
hase -4, Phase -5, Phase - 6, Phase
-9)
WEEK 4
WEEK 4 TOTAL
DATE
DATE
IQUE M. ROSAS
neer I