Flowchart Canal
Flowchart Canal
Flowchart Canal
Stake Out/Uitzet
Clearing / Grubbing
Bushes and shrubs
Embankment Excavation
Dewatering
Excavation for
Structure
Dewatering
Excavation for
Structure
Dewatering
Excavation for
Structure
Demolition of
Cofferdam
Finish
Excavation and
Embankment has
complete
Cofferdam
complete after the formwork
has finished attach
the reinforced bar
Dewatering
Foundation
complete Demollition of
cofferdam 1st
step
Install Block
Lining
1st Step
Block Lining
has attached Finished
Cofferdam
complete after the formwork
has finished attach
the reinforced bar
Dewatering
Foundation
complete Demollition of
cofferdam 2nd
step
Install Block
Lining
2nd Step
Block Lining
has attached Finished
Lining 2nd step
has complete
Cofferdam
complete after the formwork
has finished attach
the reinforced bar
Dewatering
Install Block
Lining
Block Lining
has attached
Demollition of
cofferdam 3rd
step
3rd Step
Finished