Start

Stake Out/Uitzet

Clearing / Grubbing
Bushes and shrubs

Stripping Top Soil

Embankment Excavation

Coffering 1st Step

Dewatering

Excavation for
Structure

Install Lining 1st Step


(Side Lining)
Complete
Coffering 2nd Step
(Other Side)

Dewatering

Excavation for
Structure

Install Lining 2nd Step


(Other Side Lining)
Complete
Coffering 3rd Step
(Bottom Side)

Dewatering

Excavation for
Structure

Install Lining 3rd Step


(Bottom Side Lining)

Demolition of
Cofferdam

Finish
Excavation and
Embankment has
complete

Coffering 1st Step Reinforcement Bars

Cofferdam
complete after the formwork
has finished attach
the reinforced bar
Dewatering

Form Work / Congcrete Mold for


insite congcrete

Casting insite Casting Instie


Congcrete congcrete
(foundation) (Top Lining)

Foundation
complete Demollition of
cofferdam 1st
step
Install Block
Lining
1st Step
Block Lining
has attached Finished

Lining 1st step has


complete

Coffering 2nd Step Reinforcement Bars

Cofferdam
complete after the formwork
has finished attach
the reinforced bar
Dewatering

Form Work / Congcrete Mold for


insite congcrete

Casting insite Casting Insite


Congcrete congcrete
(foundation) (Top Lining)

Foundation
complete Demollition of
cofferdam 2nd
step
Install Block
Lining
2nd Step
Block Lining
has attached Finished
Lining 2nd step
has complete

Coffering 3rd Step Reinforcement Bars

Cofferdam
complete after the formwork
has finished attach
the reinforced bar
Dewatering

Install relief vape for


under drain

Form Work / Congcrete


Mold for insite congcrete

Install Block
Lining

Block Lining
has attached

Demollition of
cofferdam 3rd
step

3rd Step
Finished