Quotation: SR No Description UOM Rate (In Inr)

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

QUOTATION

RATE(IN
SR NO DESCRIPTION UOM
INR)
1 Erection of Structure 12 KG
2 Fabrication of structure 24 KG
3 Rectification of prefabricated structure 35 KG
4 Grating/chequered plate fabrication 25 KG
5 Grating/chequered plate erection 15 KG
6 Equipment erection 10 KG
7 Equipment alignment 7 KG
8 Railings pipe fabrication 175 RMT
9 Railings pipe erection 100 RMT
10 Fitting of instruments SUIT AT SITE
11 Painting of structure (single coat) 4 KG
12 Fabrication of SS pipeline 190 INCH DIA
13 Fabrication of MS pipeline 160 INCH DIA
Pipe Fittings SS 285 INCH DIA
Pipe Fittings MS 240 INCH DIA
14 Erection of SS pipeline 70 INCH DIA
15 Erection of MS pipeline 60 INCH DIA
16 Valve and gaskets erection 150 INCH DIA
17 Tack welding by SS filler wire 160 INCH DIA
18 Loading and unloading 700 TON
19 Cable tray erection upto 300 mm 150 RMT
20 Cable tray erection above 300mm 175 RMT

TERMS & CONDITION


1 Rate will be increase in accordance with increase in pipe size.
2 Taxes will be applicale as per Government rules on above rates.
3 Hydra and crane will have to provide by client if needed.
4 All hardware materials will be scope under the client.
5 Water and electricity have to provide by client.

You might also like