PR Caste Riser

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Column1 PROJECT SITES

1 VWSSI - FCI - CALULUT

2 VWSSI - FCI - CASTILLEJOS

3 VWSSI - FCI - DAPDAP

4 VWSSI - FCI - HANJIN

5 VWSSI - FCI - KEPPEL

17 VWSSI - FCI - LIMAY

6 VWSSI - FCI - MANGANVACA

7 VWSSI - FCI - MEXICO

8 VWSSI - FCI - MINING

9 VWSSI - FCI - PORAC I

10 VWSSI - FCI - PORAC II

11 VWSSI - FCI - TABUN

16 VWSSI - MAIN TECH

12 VWSSI - MALINOVILLE

13 VWSSI - MANSFIELD RESIDENCES

14 VWSSI - SAN FABIAN

15 VWSSI - STA. BARBARA

16 VWSSI - THE HAUSLANDS


VILLAGES WATER SUPPLY SYSTEM, INC.
Blk. 8, Lot 14, Phase IV, Mansfield Residence, Angeles City

Project: FCI Castillejos Date: Nov. 26, 2018

PURCHASE REQUEST

TOTAL
ITEM NAME QUANTITY UNIT COST COST
4" x 6m B.I. Pipe Schedule 60 6 PCS 0.00
4" Franscoupling 13 PCS
4" x 5" Threaded B.I. Reducer 1 PCS
4" x 3" Threaded B.I. Reducer 1 PCS
3.5 mm sq. THHN copper wire 1 Box
3.5 mm sq. THHN copper wire 1 Box
3.5 mm sq. THHN copper wire 1 Box
Electrode 3 Pcs
Primer Epoxy with Catalyst 4 Liters
xxxxxNothing Followsxxxxx 0.00
TOTAL: 0.00

Replacement of Sunction Pipe in FCI Castillejos

Prepared by: Recommending Approval:

Engr. Johnlerie Esguerra Engr. Roberto V. Suarez


Cadet Engineer Vice-President for Technical Opr.

Certified included in the budget/CapEx Approved by:

Mr. Rommel Ocampo Engr. Edwin R. Reyes


Acting Admin/Finance Officer Chief Executive Officer

You might also like