Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

PLANT PROJECT 2015

MEI JUNI JULI AGUSTUS SE


NO MESIN ITEM PROJECT
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
1 Ged. J;K;L;I Clean hall
Ged. K Pasang tandon air & install Pipa
Geomembran Unload, 6 Container
Assembling & Install
15
REV : 01
SEPTEMBER OKTOBER NOVEMBER DESEMBER
KETERANGAN
37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
18 21 Done
16 In progress
15 Done , by Contraktor
29 In progress by Contraktor
Start-Up ModifikasiFacility Maintenance Pindah Repair
PL

JANUARI PEBRUARI MARET


AREA MESIN PROJECT
1 2 3 4 5 6 7 8 9 10 11 12
K Geom-support Pasang tandon air & install Pipa 22
Assembling & Install mesin 22
Pengecoran & Pasang plendes 1 14
Ganti bearing UCF 321 u/ Roda 7
Buat Lipatan SA 17
Pasang Printing
Ganti bearing Roda Roches 2 set
Pasang pangkon katrol di winder
Winder
Buat kereta u/roll
Buat kontruksi katrol
PLANT PROJECT - 2016

ET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER


13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

24 2
25 11 26 29
19
17
20 31 8 13 22 1
3
13 30
13 30
STATUS

Done
Done
Done
Done
In progres
Done
Done
In progres
Done
In Progres by sub con
In progres by sub con