DRAWING LIST
MENGETAHUI
NO DRAWING TITLE NO DRAWING SKALA REMARK
PT. DAYA MITRA TELEKOMUNIKASI
1 DRAWING LIST CME-42-00 NTS
2 SITE MAP CME-42-01 NTS
3 PROPOSED ANTENNA PLACEMENT CME-42-02 1:100
4 SITE LAYOUT CME-42-03 1:100 PROYEK
5 TAMPAK DEPAN & TAMPAK SAMPING CME-42-04 1:100
6 POTONGAN LAYOUT LOCATION CME-42-05 1:100 PEMBANGUNAN BTS
7 DENAH PONDASI TOWER CME-42-06 1:100 KONTRAKTOR
8 DETAIL PONDASI TOWER CME-42-07 1:100 PT.IMPRIMA
9 DETAIL TEMPLATE CME-42-08 1:100
10 LAYOUT GROUNDING CME-42-09 1:100
11 LAYOUT KONTUR CME-42-10 1:100
12 DETAIL ACCSES ROAD CME-42-11 1:100 DIDESAIN DIPERIKSA DISETUJUI
PT. TRICOMINDO CIPTA MANDIRI PT. DAYA MITRA TELEKOMUNIKASI
Hari Winarso
JUDUL GAMBAR
CME SST 42 M
NAMA GAMBAR
DRAWING LIST
SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER
CME-42- 00 A3
N
PT. DAYAMITRA
TELEKOMUNIKASI
W E
CATATAN/KETERANGAN
S
MENGETAHUI
PT. DAYA MITRA TELEKOMUNIKASI
PROYEK
PEMBANGUNAN BTS
5m

KONTRAKTOR
PT.IMPRIMA
20m
DIDESAIN DIPERIKSA DISETUJUI
13m PT. TRICOMINDO CIPTA MANDIRI PT. DAYA MITRA TELEKOMUNIKASI
Hari Winarso
JUDUL GAMBAR
CME SST 42 M
NAMA GAMBAR
SITE MAP
SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER
CME-42- 01 A3
N
W E
PT. DAYAMITRA
TELEKOMUNIKASI
S CATATAN/KETERANGAN
MENGETAHUI
KEY PLAN PT. DAYA MITRA TELEKOMUNIKASI
SKALA : NTS
PROYEK
PEMBANGUNAN BTS
D A D A KONTRAKTOR
42000

PT.IMPRIMA
C B C B
PROPOSED ANTENNA RF PROPOSED ANTENNA MICROWAVE
DIDESAIN DIPERIKSA DISETUJUI
PT. TRICOMINDO CIPTA MANDIRI PT. DAYA MITRA TELEKOMUNIKASI
Hari Winarso
JUDUL GAMBAR
CME SST 42 M
NAMA GAMBAR
DATA ANTENNA TOWER SST 42 M PROPOSEED ANTENNA PLACEMENT
Elevasi KAKI
NO ANTENNA DIMENSI AZYMUTH
(Meter) TOWER SCALE REVISI
1 3 Sectoral -m -m - -
NO. TANGGAL PARAF
2 1 MW -m -m - -
1
2
ANTENNA PROPOSED 3
SKALA 1:300
NO REGISTER
CME-42- 02 A3
N
3000
W E
PT. DAYAMITRA
B S
TELEKOMUNIKASI
CATATAN/KETERANGAN
5M

13000
RABAT
RABAT

1112 3376 4237 1000


KOLOM PRAKTIS 15/20 100 1424 2400 2400 2400 3000
TUL 4Ø 12 & Ø8-150
PAGAR TYPE E
1200

PINTU MASUK (PINTU GESER) KOLOM PRAKTIS 15/ 15


TUL 4Ø 12 & Ø8-150
KWH
2400

2400
2677

3000
METER GRAVEL
ELEV + 0.20
MENGETAHUI
900

2400

2400
PT. DAYA MITRA TELEKOMUNIKASI
RECT. EMERSON ACA
Pole ACPDB
PAGAR TYPE E

PAGAR TYPE E

3000

10000
3500

3500

A
2400

2400
Pole RRU

PROYEK

3000
500 2100 1262
GRAVEL
ELEV + 0.20
PEMBANGUNAN BTS
2848

2650

2650
KOLOM PRAKTIS 15/ 15 KOLOM PRAKTIS 15/ 15
TUL 4Ø 12 & Ø8-150 TUL 4Ø 12 & Ø8-150
20000

20000
KONTRAKTOR
PAGAR TYPE E

3000
75 2250 2400 2400 2400 2400
PT.IMPRIMA
2075

4237 3376 4237


12000
3000

3000
DIDESAIN DIPERIKSA DISETUJUI
PT. TRICOMINDO CIPTA MANDIRI PT. DAYA MITRA TELEKOMUNIKASI

10000

10000
3000

3000
Hari Winarso
JUDUL GAMBAR
CME SST 42 M

1850

1850
3000 3000 3000 3000 850 NAMA GAMBAR
13000
SITE LAYOUT
SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER
CME-42- 03 A3
TOWER - 42 M NL PT. DAYAMITRA
TELEKOMUNIKASI
CATATAN/KETERANGAN
MENGETAHUI
PT. DAYA MITRA TELEKOMUNIKASI
1000 12000
PROYEK
PEMBANGUNAN BTS
KONTRAKTOR
PT.IMPRIMA
TOWER - 42 M NL
DIDESAIN DIPERIKSA DISETUJUI
PT. TRICOMINDO CIPTA MANDIRI PT. DAYA MITRA TELEKOMUNIKASI
Hari Winarso
JUDUL GAMBAR
CME SST 42 M
NAMA GAMBAR
10000 10000
TAMPAK DEPAN & TAMPAK SAMPING
SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER
CME-42- 04 A3
TOWER - 42 M NL PT. DAYAMITRA
TELEKOMUNIKASI
CATATAN/KETERANGAN
MENGETAHUI
PT. DAYA MITRA TELEKOMUNIKASI
PROYEK
PEMBANGUNAN BTS
KONTRAKTOR
PT.IMPRIMA
TOWER - 42 M NL
DIDESAIN DIPERIKSA DISETUJUI
PT. TRICOMINDO CIPTA MANDIRI PT. DAYA MITRA TELEKOMUNIKASI
Hari Winarso
JUDUL GAMBAR
CME SST 42 M
NAMA GAMBAR
POTONGAN LAYOUT LOCATION
SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER
CME-42- 05 A3
PT. DAYAMITRA
TELEKOMUNIKASI
CATATAN/KETERANGAN
MENGETAHUI
PT. DAYA MITRA TELEKOMUNIKASI
PROYEK
PEMBANGUNAN BTS
KONTRAKTOR
PT.IMPRIMA
DIDESAIN DIPERIKSA DISETUJUI
PT. TRICOMINDO CIPTA MANDIRI PT. DAYA MITRA TELEKOMUNIKASI
Hari Winarso
JUDUL GAMBAR
CME SST 42 M
NAMA GAMBAR
DENAH PONDASI TOWER
SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER
CME-42- 06 A3
PT. DAYAMITRA
TELEKOMUNIKASI
CATATAN/KETERANGAN
MENGETAHUI
PT. DAYA MITRA TELEKOMUNIKASI
PROYEK
PEMBANGUNAN BTS
KONTRAKTOR
PT.IMPRIMA
DIDESAIN DIPERIKSA DISETUJUI
PT. TRICOMINDO CIPTA MANDIRI PT. DAYA MITRA TELEKOMUNIKASI
Hari Winarso
JUDUL GAMBAR
CME SST 42 M
NAMA GAMBAR
DETAIL PONDASI TOWER
SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER
CME-42- 07 A3
PT. DAYAMITRA
TELEKOMUNIKASI
CATATAN/KETERANGAN
TM-1
MENGETAHUI
-2 TM PT. DAYA MITRA TELEKOMUNIKASI
TM -2
PROYEK
PEMBANGUNAN BTS
DETAIL "1"
TM-1

TM-1
KONTRAKTOR
PT.IMPRIMA
DIDESAIN DIPERIKSA DISETUJUI
PT. TRICOMINDO CIPTA MANDIRI PT. DAYA MITRA TELEKOMUNIKASI
TM
-2 -2
TM
TM-1 Hari Winarso
JUDUL GAMBAR
"1" CME SST 42 M
NAMA GAMBAR
DETAIL ANGKUR
DETAIL TEMPLATE
DETAIL TEMPLATE
SST - 42M NEW LIGHT
SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER
CME-42- 08 A3
PT. DAYAMITRA
TELEKOMUNIKASI
CATATAN/KETERANGAN
RABAT

RABAT

CABLE BCC 50mm² FROMKMH TO PERIMETER RING


MENGETAHUI
Alumunium 50mm² FROM BIMETALIC CLAMP TO LOWER BUSBAR
CABLE BC 50mm² PERIMETER RING GROUNDING PT. DAYA MITRA TELEKOMUNIKASI
CABLE BCC 50mm² TO TOWER LEG
COPPER BONDED ROD 3 5/8",-3M
CABLE BC 50mm² FROM RING PERIMETER TO FENCE CABLE BC 50mm² FROM RING PERIMETER TO FENCE
COPPER BONDED ROD 3 5/8",-3M
KWH COPPER PLATE t = 3mm
CABLE BCC 50mm² TO TOWER LEG BIMETALIC CLAMP
PROYEK
METER
CABLE BCC 50mm² FROM EGB TO RING PARAMETER CABLE BC 50mm² FROM COPPER PLATE
CABLE BCC 50mm² FROM EGB TO PANEL ACPDB EGB PEMBANGUNAN BTS
CABLE BC 50mm² PERIMETER RING GROUNDING
Pole ACPDB

CABLE BCC 50mm² FROM EGB TO BTS OUTDOOR KONTRAKTOR


PT.IMPRIMA
Alumunium 50mm² CONNECTED WITH CLAMP

RECT. EMERSON ACA


Pole RRU
CABLE BC 50mm² PERIMETER RING GROUNDING
DIDESAIN DIPERIKSA DISETUJUI
PT. TRICOMINDO CIPTA MANDIRI PT. DAYA MITRA TELEKOMUNIKASI
CABLE BCC 50mm² TO TOWER LEG CABLE BCC 50mm² TO TOWER LEG
GRAVEL
ELEV +0.20
COPPER BONDED ROD 3 5/8",-3M COPPER BONDED ROD 3 5/8",-3M
CABLE BC 50mm² FROM RING PERIMETER TO FENCE
Hari Winarso
CABLE BC 50mm² FROM RING PERIMETER TO FENCE
JUDUL GAMBAR
CABLE BC 50mm² PERIMETER RING GROUNDING
CME SST 42 M
NAMA GAMBAR
DETAIL GROUNDING
SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER
CME-42- 09 A3
PT. DAYAMITRA
TELEKOMUNIKASI
CATATAN/KETERANGAN
MENGETAHUI
PT. DAYA MITRA TELEKOMUNIKASI
5M

PROYEK
PEMBANGUNAN BTS
KONTRAKTOR
PT.IMPRIMA
DIDESAIN DIPERIKSA DISETUJUI
20 M

PT. TRICOMINDO CIPTA MANDIRI PT. DAYA MITRA TELEKOMUNIKASI


Hari Winarso
JUDUL GAMBAR
CME SST 42 M
NAMA GAMBAR
DETAIL KONTUR
13 M
SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER
CME-42- 10 A3
PT. DAYAMITRA
TELEKOMUNIKASI
CATATAN/KETERANGAN
COR RABAT URUGAN PASIR / SIRTU
t=10cm DIPADATKAN , t = 5cm MENGETAHUI
PT. DAYA MITRA TELEKOMUNIKASI
1000 1000 1000
PROYEK
PEMBANGUNAN BTS
KONTRAKTOR
PT.IMPRIMA
DIDESAIN DIPERIKSA DISETUJUI
PT. TRICOMINDO CIPTA MANDIRI PT. DAYA MITRA TELEKOMUNIKASI
DETAIL ACCESS ROAD Hari Winarso
SKALA 1 : 25 JUDUL GAMBAR
CME SST 42 M
NAMA GAMBAR
DETAIL ACCSES ROAD
SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER
CME-42- 11 A3