>>>PROGRAM PENANGANAN SBSN DENGAN MEKANISME KONTRAK TAHUN JAMAK (MYC)

TARGET (KM) Perkiraan Biaya (Rp. Ribu)


Usulan Penangan
No. Nama Paket Keterangan Penanganan Desain
2019 2020 Total 2019 2020 Total

II PROVINSI SULAWESI SELATAN 26.900 53.300 80.200 149,800,000 321,225,000 471,025,000

A. Satker PJN Wilayah I 11.200 23.000 34.200 50,000,000 104,000,000 154,000,000


Rehabilitasi Jalan Bts. Kota Watampone - Pompanua - Ulugalung
1
(Tampangeng), Impa Impa - Tarumpakkae

I Bts. Kota Watampone - Pompanua Rehab Pelebaran

7.200 16.000 23.200 18,000,000 48,000,000 66,000,000

II Bts. Kab. Wajo/Bts. Kab. Bone - Ulugalung (Tampangeng) Rehab

III Impa - Impa Tarumpakkae Preventive


Rehabiltasi dan Pelebaran Ruas Jalan Anabanua - Tarumpakkae - Bts.
2
Kab. Luwu

I Anabanua - Tarumpakkae Pelebaran Pelebaran

4.000 7.000 11.000 32,000,000 56,000,000 88,000,000

II Tarumpakkae - Bts. Kab. Luwu Pelebaran

B. Satker PJN Wilayah II 7.700 18.800 26.500 53,000,000 133,225,000 186,225,000

3 Rehabilitasi dan Pelebaran Jalan Pare Pare - Bangkae

Bts. Pare pare - Bangkae 2.500 10.500 13.000 20,000,000 79,225,000 99,225,000 Pelebaran Pelebaran

Rehabilitasi dan Pelebaran Menuju Standar Ruas Jalan Tarengge – Bts


4
Kota Malili
Tarengge - Bts. Kota Malili Pelebaran Pelebaran
5.200 8.300 13.500 33,000,000 54,000,000 87,000,000
TARGET (KM) Perkiraan Biaya (Rp. Ribu)
Usulan Penangan
No. Nama Paket Keterangan Penanganan Desain
2019 2020 Total 2019 2020 Total
5.200 8.300 13.500 33,000,000 54,000,000 87,000,000
pelebaran Pelebaran

C. Satker PJN Wilayah III 8.000 11.500 19.500 46,800,000 84,000,000 130,800,000
Rekonstruksi dan Rehabilitasi Minor Jalan Bts. Kota Maros - Bts. Kota
5
Makassar

Rekonstruksi sepanjang 2 Km (4 Lajur), dan Penanganan Rekonstruksi Rekonstruksi


Bts. Kota Maros. Bts. Kota Makassar 2.000 6.000 8.000 17,300,000 35,000,000 52,300,000
off Pavement Pekerjaan Uditch 8,00 Km

6 Rehabilitasi Pelebaran Jalan Bts. Kab. Gowa - Bts. Kota Takalar


Pelebaran tambah lajur kendaraan roda 2 (lalu lintas pelebaran pelebaran
Bts. Kab. Gowa - Bts. Kota Takalar 6.000 5.500 11.500 29,500,000 49,000,000 78,500,000
komuter mamminasata)
Lokasi usulan Lokasi Desain Lokasi Efektif 2019
Penanganan Lapisan Perkerasan stok desain Konsultan
KM Awal KM Akhir Total KM Awal KM Akhir Total KM Awal KM Akhir Total

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm , LPA :
214+300 224+800 10.50 182+110 184+580 2.47 204+000 205+000 1.00 PT WIRA 2016
15 cm , LPB : 20 cm , TIMB.PIL : 30 cm

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm , LPA :
187+600 192+925 5.33 PT WIRA 2016
15 cm , LPB : 20 cm , TIMB.PIL : 30 cm

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm , LPA :
201+000 202+000 1.00 PT WIRA 2016
15 cm , LPB : 20 cm , TIMB.PIL : 30 cm

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm , LPA :
203+000 205+000 2.00 PT WIRA 2016
15 cm , LPB : 20 cm , TIMB.PIL : 30 cm

230+200 235+700 5.50 Tdk Ada Desain

214+450 221+650 7.20 Tdk Ada Desain

Rekonstruksi/Rehab
220+320 220+875 0.56 219+420 222+420 3.00 210+700 220+320 9.62 AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm PT GENTA2016
Mayor
AC WC ASB : 5 cm , AC BC ASB : 8 cm , AC BASE
230+090 232+000 1.91 223+400 225+500 2.10 184+400 184+700 0.30 Rehab Minor PT. DACREA 2018
ASB : 8 cm , LPA : 30 cm
AC WC ASB : 5 cm , AC BC ASB : 8 cm , AC BASE
228+300 232+120 3.82 PT. DACREA 2018
ASB : 8 cm , LPA : 30 cm
AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm A : 15
257+000 260+800 3.80 257+000 267+000 10.00 236+420 237+600 1.18 Rekonstruksi PT. Wira 2015
cm, B : 25, Timpil : 30 cm

270+000 272+400 2.40 272+200 276+100 3.90 240+900 241+810 0.91 Rehab Mayor PT. DACREA 2018

279+000 280+800 1.80 281+850 283+900 2.05 273+917 274+000 0.08 Rehab Minor PT. DACREA 2018

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm ,AGG
164+670 177+900 13.23 164+670 177+900 13.23 172+670 173+970 1.30 Rehab Minor PT WIRA 2016
KLS A : 20 cm , AGG KLS B : 30 cm , TIMB.PIL : 30 cm

176+170 176+670 Rehab Minor


176+970 177+370 Rehab Minor

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 10.5 cm ,
- 526+592 536+592 10.00 526+575 529+475 2.90 Pelebaran PT MARATAMA 2016
LPA : 30 cm
Lokasi usulan Lokasi Desain Lokasi Efektif 2019
Penanganan Lapisan Perkerasan stok desain Konsultan
KM Awal KM Akhir Total KM Awal KM Akhir Total KM Awal KM Akhir Total

AC WC : 5 cm , AC BC : 8 cm , LPA KLS A: 15 cm , LPA


- 536+791 546+791 10.00 579+250 580+550 1.30 Rehab Minor PT BINTANG 2015
KLS B : 15 cm

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm, A : 15
22+090 27+090 5.00 PT WIRA 2015
cm

33+080 38+980 5.90 70+890 71+290 Rehab Mayor PT. Yodya 2016
>>>PROGRAM PENANGANAN SBSN DENGAN MEKANISME KONTRAK TAHUN TUNGGAL (SYC)
TARGET (KM) Perkiraan Biaya (Rp. Ribu) Lokasi usulan
Usulan Penangan
No. Nama Paket Keterangan Penanganan Desain
2019 2020 Total 2019 2020 Total KM Awal KM Akhir Total

II PROVINSI SULAWESI SELATAN 33.420 0.000 33.420 163,400,000 - 163,400,000


A. Satker PJN Wilayah I 14.920 0.000 14.920 55,900,000 - 55,900,000
1 Pelebaran Jalan A.Yani (Pare Pare) -

Jalan A. Yani Pare pare 2.920 2.920 21,900,000 21,900,000 Pelebaran -

Rekonstruksi dan Rehabilitasi Minor Ruas Jalan Bajo - Arasoe - -


2
Bts. Kota Watampone

Rekon/Minor 242+310 249+100 6.79


Bajo - Arasoe

12.000 12.000 34,000,000 34,000,000


Mayor/
Rekon/Minor 275+150 282+900 7.75
pelebaran
Arasoe - Bts. Kota Watampone

B. Satker PJN Wilayah II 11.000 11.000 70,000,000 - 70,000,000

Rehabilitasi dan Pelebaran Menuju Standar Ruas Jalan Enrekang -


3
Makale

Enrekang - Bts. Kota Makale 5.000 5.000 32,000,000 32,000,000 pelebaran pelebaran

4 Penanganan Menuju Standar Ruas Jalan Masamba – Wotu

Ruas Jalan Masamba – Wotu 6.000 6.000 38,000,000 38,000,000 pelebaran pelebaran

C. Satker PJN Wilayah III 7.500 7.500 37,500,000 - 37,500,000

5 Rehabiitasi Minor Jalan Bts. Kab. Barru - Bts. Kab. Pangkep

Bts. Kab. Barru - Bts. Kab. Pangkep 7.500 7.500 37,500,000 - 37,500,000 Overlay 4 Lajur -
Lokasi Desain Lokasi Efektif 2019
Penanganan Lapisan Perkerasan stok desain Konsultan
KM Awal KM Akhir Total KM Awal KM Akhir Total

248+800 249+200 0.40 259+025 262+000 2.98 Rekonstruksi PT. DACREA 2018

233+300 234+100 0.80 Rehab Mayor

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm , AGG
283+000 288+000 5.00 272+750 273+850 1.10 Rehab Mayor PT Wira 2015
KLS B : 30 cm , TIMB. PIL: 35 cm

289+250 293+550 4.30 PT BINTANG 2015

258+500 276+000 17.50 247+670 249+070 1.40 Rekonstruksi PT. Wira 2016

268+470 269+170 0.70 Rekonstruksi

403+000 404+100 1.10 Rehabilitasi Minor PT. Yodya 2017

406+500 407+550 1.05 Rehabilitasi Mayor

410+000 411+980 1.98 Rehabilitasi Mayor


SBSN 2019
TARGET (KM) Lokasi
Usulan Penangan
No. Nama Paket Penanganan Desain
2019 2020 Total KM Awal

II PROVINSI SULAWESI SELATAN 107.437 64.287 171.724


A. Satker PJN Wilayah I 42.500 22.665 65.165
Rekonstruksi dan Rehabilitasi Jalan Bts. Kota Benteng - Tongke Tongke -
1
Apatana, Tongke Tongke - Pelabuhan Patumbukan
Tongke Tongke - Apatana SYC 10.590 10.590 Rekonstruksi Rehab minor 40+880

Tongke Tongke - Pelabuhan Patumbukang SYC Rekonstruksi Rehab minor 38+790


40+800
2 Pelebaran Jalan A.Yani (Pare Pare) -
Jalan A. Yani Pare pare SYC 2.920 2.920 Pelebaran -
Rekonstruksi dan Rehabilitasi Minor Ruas Jalan Bajo - Arasoe - Bts. Kota -
3
Watampone

Bajo - Arasoe SYC Rekon/Minor 242+310

17.990 17.990
275+150
Mayor/
Arasoe - Bts. Kota Watampone SYC Rekon/Minor pelebaran
288+950

Preservasi Rekonstruksi Jalan Bts. Kota Watampone - Pompanua -


4
Ulugalung (Tampangeng), Impa Impa - Tarumpakkae

I Bts. Kota Watampone - Pompanua MYC 7.200 16.000 23.200 Rehab Minor Pelebaran
TARGET (KM) Lokasi
Usulan Penangan
No. Nama Paket Penanganan Desain
2019 2020 Total KM Awal

II Bts. Kab. Wajo/Bts. Kab. Bone - Ulugalung (Tampangeng) Rekonstruksi

III Impa - Impa Tarumpakkae Preventive


5 Pelebaran Ruas Jalan Anabanua - Tarumpakkae - Bts. Kab. Luwu
I Anabanua - Tarumpakkae MYC 3.800 6.665 10.465 220+320

Pelebaran Pelebaran 230+090

II Tarumpakkae - Bts. Kab. Luwu 257+000

Pelebaran 270+000

279+000
B. Satker PJN Wilayah II 23.362 16.197 39.559
6 Pelebaran Jalan Pare Pare - Bangkae

Pare pare - Bangkae MYC 5.333 7.897 13.230 Pelebaran Pelebaran 164+670

7 Pelebaran Menuju Standar Ruas Jalan Tarengge – Bts Kota Malili I

Tarengge - Bts. Kota Malili I SYC 6.039 6.039 Pelebaran Pelebaran

8 Pelebaran Menuju Standar Ruas Jalan Tarengge – Bts Kota Malili II

Tarengge - Bts. Kota Malili II MYC 5.090 8.300 13.390 pelebaran Pelebaran

9 Penanganan Menuju Standar Ruas Jalan Masamba – Wotu


TARGET (KM) Lokasi
Usulan Penangan
No. Nama Paket Penanganan Desain
2019 2020 Total KM Awal

Ruas Jalan Masamba – Wotu SYC 6.900 6.900 pelebaran pelebaran


TARGET (KM) Lokasi
Usulan Penangan
No. Nama Paket Penanganan Desain
2019 2020 Total KM Awal

C. Satker PJN Wilayah III 41.575 25.425 67.000


Rekonstruksi dan Rehabilitasi Minor Jalan Bts. Kota Maros - Bts. Kota
10
Makassar
Bts. Kota Maros. Bts. Kota Makassar MYC 2.000 6.020 8.020 Rekonstruksi Rekonstruksi

11 Rekonstruksi/Pelebaran Jalan Ruas Bts. Kota Maros - Bts. Kab. Bone


pelebaran /
Bts. Kota Maros - Bts. Kab. Bone MYC 1.580 5.100 6.680 pelebaran
rekon
Pelebaran Menuju Standar Jalan Bts. Kota Sungguminasa - Bts. Kab
12
Takalar

Bts. Kota Sungguminasa - Bts. Kab Takalar SYC 6.225 0.000 6.225 pelebaran -

13 Pelebaran Menuju Standar Jalan Bts. Kab. Gowa - Bts. Kota Takalar

Bts. Kab. Gowa - Bts. Kota Takalar MYC 5.900 5.405 11.305 pelebaran pelebaran
Pelebaran Menuju Standar Jalan Bts. Kota Takalar - Bts. Kab.
14
Takalar/Jeneponto

Bts. Kota Takalar - Bts. Kab. Takalar/Jeneponto SYC 11.295 11.295 pelebaran pelebaran

Rehabiitasi Minor Jalan Bts. Kab. Barru - Bts. Kota Pangkajene, Bangkae -
15
Bts. Kab. Pangkep
Bts. Kab. Barru - Bts. Kota Pangkajene, Bangkae - Bts. Kab. Pangkep SYC 7.500 0.000 7.500 rehab minor -

16 Pelebaran Menuju Standar Jalan Ujung Lamuru - Koppe

Ujung Lamuru - Koppe MYC 4.000 8.900 12.900 pelebaran pelebaran


TARGET (KM) Lokasi
Usulan Penangan
No. Nama Paket Penanganan Desain
2019 2020 Total KM Awal

17 Pelebaran Menuju Standar Jalan MT. Haryono

MT. Haryono (Watampone) SYC 3.075 0.000 3.075 pelebaran pelebaran

TOTAL BALAI #REF! #REF! #REF!


Lokasi usulan Lokasi Desain Lokasi Efektif 2019
Lapisan Perkerasan stok desain Konsultan
KM Akhir Total KM Awal KM Akhir Total KM Awal KM Akhir Total

43+600 2.72 38+690 50+230 11.54 43+600 50+200 6.6 PT AURAMA KARYA

39+700 0.91 39+650 40+725 1.075 AC WC : 4 cm , AC BC : 6 cm , LPA : 40 cm PT. MARATAMA CIPTA


MANDIRI
42+860 AC WC : 4 cm , AC BC : 6 cm , LPA : 25 cm

249+100 6.79 248+800 249+200 0.40 259+025 262+000 2.98 PT. DACREA

233+300 234+100 0.80

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm , AGG PT BINTANG INTI


282+900 7.75 283+000 288+000 5.00 272+750 273+850 1.10 KLS B : 30 cm , TIMB. PIL: 35 cm REKATAMA

AC WC : 4 cm , AC BC : 8 cm , LPA : 15 cm , LPB : 15 PT BINTANG INTI


292+400 3.45 289+000 290+500 1.50 CM REKATAMA

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm , LPA :
0.00 182+110 184+580 2.47 204+000 205+000 1.00 PT WIRA WIDYATAMA
15 cm , LPB : 20 cm , TIMB.PIL : 30 cm

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm , LPA :
0.00 187+600 192+925 5.33 PT WIRA WIDYATAMA
15 cm , LPB : 20 cm , TIMB.PIL : 30 cm

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm , LPA :
0.00 201+000 202+000 1.00 PT WIRA WIDYATAMA
15 cm , LPB : 20 cm , TIMB.PIL : 30 cm
Lokasi usulan Lokasi Desain Lokasi Efektif 2019
Lapisan Perkerasan stok desain Konsultan
KM Akhir Total KM Awal KM Akhir Total KM Awal KM Akhir Total

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm , LPA :
0.00 203+000 205+000 2.00 PT WIRA WIDYATAMA
15 cm , LPB : 20 cm , TIMB.PIL : 30 cm

Tdk Ada Desain

Tdk Ada Desain

PT GENTA PRIMA
220+875 0.56 219+420 222+420 3.00 210+700 220+320 9.62 AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm PERTIWI
AC WC ASB : 5 cm , AC BC ASB : 8 cm , AC BASE
232+000 1.91 223+400 225+500 2.10 184+400 184+700 0.30 PT. DACREA
ASB : 8 cm , LPA : 30 cm
AC WC ASB : 5 cm , AC BC ASB : 8 cm , AC BASE
228+300 232+120 3.82 PT. DACREA
ASB : 8 cm , LPA : 30 cm

260+800 3.80 236+420 237+600 1.18

272+400 2.40 240+900 241+810 0.91

280+800 1.80 273+917 274+000 0.08

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm ,AGG
177+900 13.23 164+670 177+900 13.23 164+650 216+770 52.12 PT WIRA WIDYATAMA
KLS A : 20 cm , AGG KLS B : 30 cm , TIMB.PIL : 30 cm

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 10.5 cm , PT MARATAMA CIPTA


- 526+592 536+592 10.00 LPA : 30 cm MANDIRI

AC WC : 5 cm , AC BC : 8 cm , LPA KLS A: 15 cm , LPA PT BINTANG INTI


- 536+800 546+800 10.00 KLS B : 15 cm REKATAMA
Lokasi usulan Lokasi Desain Lokasi Efektif 2019
Lapisan Perkerasan stok desain Konsultan
KM Akhir Total KM Awal KM Akhir Total KM Awal KM Akhir Total
Lokasi usulan Lokasi Desain Lokasi Efektif 2019
Lapisan Perkerasan stok desain Konsultan
KM Akhir Total KM Awal KM Akhir Total KM Awal KM Akhir Total

22+090 27+090 5.00 AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm PT WIRA WIDYATAMA

Yodya Karya

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 21 cm ,AGG
PT MARATAMA CIPTA
52+000 76+000 24.00 KLS A : 30 cm , TIMB.PIL : 50 cm , LIMESTONE : 50 MANDIRI
cm , GEOMEMBRAN : T : 1.5 mm

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm , AGG
120+600 134+000 13.40 PT VIRAMA KARYA
KLS A : 20 cm , AGG KLS B : 25 cm , TIMB.PIL : 30 cm
Lokasi usulan Lokasi Desain Lokasi Efektif 2019
Lapisan Perkerasan stok desain Konsultan
KM Akhir Total KM Awal KM Akhir Total KM Awal KM Akhir Total

AC WC : 4 cm , AC BC : 6 cm , AC BASE : 8 cm ,AGG
170+400 173+650 3.25 PT VIRAMA KARYA
KLS A : 20 cm , AGG KLS B : 25 cm , TIMB.PIL : 30 cm

You might also like