Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

June 20,2019

Attention: Eng’r Darwin D. Pacheco


Operation Supervisor – San Miguel Branch
Hiyas Water Resources, Inc

Subject: Steel Grilles for Office Door and Windows (Scout Ranger Ville)

Dear: Sir
As per your requirements, we are pleased to submit the following quotation
Item no. Item Description QTY UNIT Unit Cost Total
Amount
1 Window A 1 LOT Ρ16,200 Ρ16,200
2 Window B 1 LOT Ρ10,500 Ρ10,500
3 Window C 1 LOT Ρ5,900 Ρ5,900
4 Doors 1 LOT Ρ9,500 Ρ9,500
5 ACU Back Frame and Support 1 LOT Ρ8,500 Ρ8,500
Grand Total Ρ38,000

Specs: See Drawing for Details

Terms of Payment: 50% Downpayment , 40% upon Completion and 10% Retention
Working duration: 14 Calendar Days

Thank you for the Opportunity to quote on your requirement

Very Truly yours, Check shall be Issued to: Mr. Ronaldo F. Gutierrez

Mr. Ronaldo F. Gutierrez

Single Proprietor Receive by:

You might also like