GALIAN TANAH

A L (m) Q
As
(m2) 1 2 3 4 5 6 7 8 9 10 Tot. (m3)

A 0.16 4 4.0 0.64


B 0.16 4 4.0 0.64

1 0.16 1.5 1.5 0.24


2 0.16 1.5 1.5 0.24
3 0.16 1.5 1.5 0.24

TOTAL 2.00

URUGAN KEMBALI
A L (m) Q
As
(m2) 1 2 3 4 5 6 7 8 9 10 Tot. (m3)

A 0.017 2 2.0 0.03


B 0.017 2 2.0 0.03

1 0.017 2 2.0 0.03


2 0.017 2 2.0 0.03
3 0.017 2 2.0 0.03

TOTAL 0.17

URUGAN TANAH DI BAWAH LANTAI


Uraian L (m) B (m) t (m) L eff (m) B eff (m) Q (m3)

KIRI 1.5 2 0.25 1.35 1.85 0.62


KANAN 1.5 2 0.25 1.35 1.85 0.62

TOTAL 1.25
URUGAN PASIR DI BAWAH LANTAI
Uraian L (m) B (m) t (m) L eff (m) B eff (m) Q (m3)

KIRI 1.5 2 0.05 1.35 1.85 0.12


KANAN 1.5 2 0.05 1.35 1.85 0.12

TOTAL 0.25

PONDASI
A L (m) Q
As
(m2) 1 2 3 4 5 6 7 8 9 10 Tot. (m3)

A 0.13 4 4.0 0.52


B 0.13 4 4.0 0.52

1 0.13 1.5 1.5 0.20


2 0.13 1.5 1.5 0.20
3 0.13 1.5 1.5 0.20

TOTAL 1.63
LANTAI BETON 1:3:6
Uraian L (m) B (m) t (m) L eff (m) B eff (m) Q (m3)

KIRI 1.5 2 0.1 1.35 1.85 0.25


KANAN 1.5 2 0.1 1.35 1.85 0.25

TOTAL 0.50
PAS. BATA 1:6
H L (m) Q
AS
(m) 1 2 3 4 5 6 7 8 9 10 Tot. (m2)

A 1.6 4 4.0 6.40


B 1.1 4 4.0 4.40

1 2.10
2 2.10
3 2.10

TOTAL 17.10

LUBANG DINDING MUKA


AS L1 TOT
1.60 (m2)
A
B 1 1.60

1
2
3

TOTAL -1.60

VOLUME NETTO PAS. BATA 1:6


a. Pas. Bata 1:6 Bruto 17.10
b. Pas. Bata 1:2 0.00
c. Lubang pintu, jendela & ventilasi -1.60
d. TOTAL 15.50

KOLOM PRAKTIS 15/15


Beton
KP B (m) H (m) L (m) n (buah) Q (m3)
KP 0.15 0.15 1.6 3 0.11
0.15 0.15 1.1 3 0.07

TOTAL 0.18
Pembesian (kg) 39.908 ( lihat daftar tulangan pada gambar rencana)

Kolom 15/15, L = 1,60 m 1.6


Dia. Besi berat/m' Sisi L tot N tulang N Kolom Berat Total
a b c
Tulangan Pokok 10 0.62 2 0.05 2.1 4 3 15.624
Sengkang 8 0.393 0.1 0.1 0.05 0.5 12 3 7.074
22.698

Kolom 15/15, L = 1,1 m 1.1


Dia. Besi berat/m' Sisi L tot N tulang N Kolom Berat Total
a b c
Tulangan Pokok 10 0.62 1.5 0.05 1.6 4 3 11.904
Sengkang 8 0.393 0.1 0.1 0.05 0.5 9 3 5.306
17.210 39.908
Bekisting
KP B (m) L (m) n (buah) Q (m2)
KP 0.3 1.6 3 1.44
KP 0.3 1.1 3 0.99

TOTAL 2.43

RING BALK ELEVASI 1,60

Beton
A L (m)
AS
(m2) 1 2 3 4 5 6 7 8 9 10 Tot.

A 0.0225 4 4.0

TOTAL

Pembesian (kg) 47.01 ( lihat daftar tulangan pada gambar rencana)

RB 15/15, L = 4,0 m 4
Dia. Besi berat/m' Sisi L tot N tulang N Balok Berat Total
a b c
Tulangan Pokok 12 0.62 4 0.05 4.1 4 1 10.17
Sengkang 8 0.393 0.1 0.1 0.05 0.5 28 1 5.50
15.67

Bekisting Elevasi 1,60


H L (m)
AS
(m) 1 2 3 4 5 6 7 8 9 10 Tot.

A 0.3 4 4.0
B
C
C'
D

1
2
3
4
5

TOTAL

RING BALK 15/15 ELEVASI 1,10

Beton
A L (m)
AS
(m2) 1 2 3 4 5 6 7 8 9 10 Tot.

A
B 0.0225 4 4.0
C
D

1
2
3
4
5

TOTAL

RB 15/15, L = 4 m 4
Dia. Besi berat/m' Sisi L tot N tulang N Balok Berat Total
a b c
Tulangan Pokok 12 0.62 4 0.05 4.1 4 2 20.34
Sengkang 8 0.393 0.1 0.1 0.05 0.5 28 2 11.00
31.34

Bekisting Elevasi 1,10 m


H L (m)
AS (m) 1 2 3 4 5 6 7 8 9 10 Tot.

A
B 0.3 4 4.0
C
D
1
2
3
4
5

TOTAL

Kesimpulan
Cor Ringblak 0.18 m3
Pembesian 47.01 kg
Bekisting 2.40 m2

SLOOF 15/15

Beton
A L (m)
AS
(m2) 1 2 3 4 5 6 7 8 9 10 Tot.

A 0.0225 4 4.0
B 0.0225 4 4.0

1 0.0225 1.5 1.5


2 0.0225 1.5 1.5
3 0.0225 1.5 1.5

TOTAL

Pembesian (kg) 53.23 ( lihat daftar tulangan pada gambar rencana)

Sloof 15/15, L = 4 m 4
Dia. Besi berat/m' Sisi L tot N tulang N Balok Berat Total
a b c
Tulangan Pokok 12 0.62 4 0.05 4.1 4 2 20.34
Sengkang 8 0.393 0.1 0.15 0.05 0.6 28 2 13.20
33.5408

Sloof 15/15, L = 1,5 m 1.5


Dia. Besi berat/m' Sisi L tot N tulang N Balok Berat Total
a b c
Tulangan Pokok 12 0.62 1.5 0.05 1.6 4 3 11.90
Sengkang 8 0.393 0.1 0.15 0.05 0.6 11 3 7.78
19.6854

Bekisting Sloof 15/15


H L (m)
AS
(m) 1 2 3 4 5 6 7 8 9 10 Tot.

A 0.3 4 4.0
B 0.3 4 4.0

1 0.3 1.5 1.5


2 0.3 1.5 1.5
3 0.3 1.5 1.5

TOTAL

CAT TEMBOK = PEK. PLESTERAN


DINDING
Uraian L (m) B (m) L eff (m) B eff (m) H (m) Q (m)
DALAM BANGUNAN
BELAKANG 2 1.85 1.50 2.78
KIRI 1.81
KANAN 1.81
MUKA 2 1.85 1.00 1.85

8.25
16.49
LUAR BANGUNAN
BELAKANG 4.15 1.90 7.89
KIRI 2.85
KANAN 2.85
MUKA 4.15 1.00 4.15
17.74

TOTAL = 34.23
LUBANG MUKA = -1.60

PEKERJAAN CAT TEMBOK 32.63


PIJAKAN
BETON 0.26 m3
BEKESTING 0.30 m2
Q
(m3)

0.09

0.09

0.18

Q
(m2)

1.20

1.20

2.40

Q
(m3)

0.09

0.09

Q
(m2)

1.20
1.20

Q
(m3)

0.09
0.09

0.03
0.03
0.03

0.28

Q
(m2)

1.20
1.20

0.45
0.45
0.45

3.75