A L (m) Q
As
(m2) 1 2 3 4 5 6 7 8 9 10 Tot. (m3)
TOTAL 2.00
URUGAN KEMBALI
A L (m) Q
As
(m2) 1 2 3 4 5 6 7 8 9 10 Tot. (m3)
TOTAL 0.17
TOTAL 1.25
URUGAN PASIR DI BAWAH LANTAI
Uraian L (m) B (m) t (m) L eff (m) B eff (m) Q (m3)
TOTAL 0.25
PONDASI
A L (m) Q
As
(m2) 1 2 3 4 5 6 7 8 9 10 Tot. (m3)
TOTAL 1.63
LANTAI BETON 1:3:6
Uraian L (m) B (m) t (m) L eff (m) B eff (m) Q (m3)
TOTAL 0.50
PAS. BATA 1:6
H L (m) Q
AS
(m) 1 2 3 4 5 6 7 8 9 10 Tot. (m2)
1 2.10
2 2.10
3 2.10
TOTAL 17.10
1
2
3
TOTAL -1.60
TOTAL 0.18
Pembesian (kg) 39.908 ( lihat daftar tulangan pada gambar rencana)
TOTAL 2.43
Beton
A L (m)
AS
(m2) 1 2 3 4 5 6 7 8 9 10 Tot.
A 0.0225 4 4.0
TOTAL
RB 15/15, L = 4,0 m 4
Dia. Besi berat/m' Sisi L tot N tulang N Balok Berat Total
a b c
Tulangan Pokok 12 0.62 4 0.05 4.1 4 1 10.17
Sengkang 8 0.393 0.1 0.1 0.05 0.5 28 1 5.50
15.67
A 0.3 4 4.0
B
C
C'
D
1
2
3
4
5
TOTAL
Beton
A L (m)
AS
(m2) 1 2 3 4 5 6 7 8 9 10 Tot.
A
B 0.0225 4 4.0
C
D
1
2
3
4
5
TOTAL
RB 15/15, L = 4 m 4
Dia. Besi berat/m' Sisi L tot N tulang N Balok Berat Total
a b c
Tulangan Pokok 12 0.62 4 0.05 4.1 4 2 20.34
Sengkang 8 0.393 0.1 0.1 0.05 0.5 28 2 11.00
31.34
A
B 0.3 4 4.0
C
D
1
2
3
4
5
TOTAL
Kesimpulan
Cor Ringblak 0.18 m3
Pembesian 47.01 kg
Bekisting 2.40 m2
SLOOF 15/15
Beton
A L (m)
AS
(m2) 1 2 3 4 5 6 7 8 9 10 Tot.
A 0.0225 4 4.0
B 0.0225 4 4.0
TOTAL
Sloof 15/15, L = 4 m 4
Dia. Besi berat/m' Sisi L tot N tulang N Balok Berat Total
a b c
Tulangan Pokok 12 0.62 4 0.05 4.1 4 2 20.34
Sengkang 8 0.393 0.1 0.15 0.05 0.6 28 2 13.20
33.5408
A 0.3 4 4.0
B 0.3 4 4.0
TOTAL
8.25
16.49
LUAR BANGUNAN
BELAKANG 4.15 1.90 7.89
KIRI 2.85
KANAN 2.85
MUKA 4.15 1.00 4.15
17.74
TOTAL = 34.23
LUBANG MUKA = -1.60
0.09
0.09
0.18
Q
(m2)
1.20
1.20
2.40
Q
(m3)
0.09
0.09
Q
(m2)
1.20
1.20
Q
(m3)
0.09
0.09
0.03
0.03
0.03
0.28
Q
(m2)
1.20
1.20
0.45
0.45
0.45
3.75