Hitungan Timbangan

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 55

NAME B/N

Hendra
Saldy .P
Syamsul
Mashud
Jemris
Sudirman
Firman
Depin
Ali Asri
Rijal
Jeanny

TOTAL GAJI
Summary Gaji

2,064,438
2,784,994
2,470,666
389,477
2,989,591
1,545,124
1,521,358
1,388,885
3,008,516
288,008
2,000,000
20,451,057
Salary For The Month Of November 2016
PT. BALANTANG JAYA MALILI
Nama : Rijal Basic : 14.000 / HOURS

B/N POSITION : Checker

Overtime Total
Tanggal Reg
1.5 2 3 4 Jam

26-Dec-2016 8 8 Tot.Reg 16

27-Dec-2016 8 8

U.Hadir 2

U.Makan 2

Potongan :
BPJS Ketenagakerjaan 2,7%

16
Prepared by:
016

x 14,000 = 224,000

x 16,000 = 32,000

x 20,000 = 40,000

Total = 296,000

= 7,992

Total Gaji 288,008

Approved by:

A.NASRUM S.AN
Salary For The Month Of November 2016
PT. BALANTANG JAYA MALILI
Nama : Ali Asri Basic : 14.000 / HOURS

B/N POSITION : Checker

Overtime Total
Tanggal Reg
1.5 2 3 4 Jam

26-Dec-2016 8 10 malam Tot.Reg 172

16-Jan-2017 8 10 pagi

16-Jan-2017 8 8 malam U.Hadir 19

17-Jan-2017 8 10 pagi

17-Jan-2017 8 8 malam U.Makan 19

18-Jan-2017 8 10 pagi

18-Jan-2017 8 8 malam

19-Jan-2017 8 10 pagi

19-Jan-2017 8 8 malam

20-Jan-2017 8 10 pagi

20-Jan-2017 8 8 malam

21-Jan-2017 8 10 pagi Potongan :

21-Jan-2017 8 8 malam BPJS Ketenagakerjaan 2,7%

23-Jan-2017 8 10 pagi

23-Jan-2017 8 8 malam

24-Jan-2017 8 10 pagi

24-Jan-2017 8 8 malam

25-Jan-2017 8 10 pagi

25-Jan-2017 8 8 malam

172
Prepared by:
016

x 14,000 = 2,408,000

x 16,000 = 304,000

x 20,000 = 380,000

Total = 3,092,000

= 83,484

Total Gaji 3,008,516

Approved by:

A.NASRUM S.AN
Salary For The Month Of January 2017
PT. BALANTANG JAYA MALILI
Nama : Jemris Basic : 5000/Ton

B/N : C-22275 POSITION Driver


COAL SILICA 5000
Tanggal Tot.Timbangan
Race 1 Race 2 Race 3 Race 1 Race 2 Race3 /TON

26-Dec-2016 23,715 23,745 47,460 237,300


16-Jan-2017 24,200 23,955 24,520 72,675 363,375 U.Hadir 9 x 50,000

17-Jan-2017 23,150 24,210 24,230 71,590 357,950


18-Jan-2017 24,315 24,145 48,460 242,300 Tot.Tonase 524,510 x Rp 5 5,000

20-Jan-2017 24,130 23,380 24,335 71,845 359,225


21-Jan-2017 24,215 23,725 47,940 239,700 Total

23-Jan-2017 24,425 24,600 49,025 245,125


24-Jan-2017 23,525 22,015 45,540 227,700 Potongan :

25-Jan-2017 22,925 23,575 23,475 69,975 349,875 BPJS Ketenagakerjaan 2,7%

- -
- - Total Gaji

- -
- - Prepared by:

- -
- -
- -
- -
524,510 2,622,550
= 450,000

= 2,622,550

= 3,072,550

= 82,959

otal Gaji 2,989,591

Approved by:

A.NASRUM S.AN
Salary For The Month Of january 2017
PT. BALANTANG JAYA MALILI
Nama : Saldi P Basic : 5000/Ton

B/N POSITION Driver


COAL SILICA 5000
Tanggal Tot.Timbangan
Race 1 Race 2 Race 3 Race 1 Race 2 Race 3 Race 4 /TON

26-Dec-2016 23,365 23,730 24,125 25,940 97,160 485,800


16-Jan-2017 23,595 22,700 24,335 70,630 353,150 U.Hadir 7

17-Jan-2017 24,240 24,140 24,130 72,510 362,550


18-Jan-2017 24,010 24,275 24,675 72,960 364,800 Tot.Tonase 502,455

20-Jan-2017 24,405 22,840 24,285 71,530 357,650


23-Jan-2017 24,335 24,080 48,415 242,075
25-Jan-2017 23,370 23,140 22,740 69,250 346,250
- - Potongan :

- - BPJS Ketenagakerjaan 2,7%

- -
- -
- -
- - Prepared by:

- -
- -
- -
- -
502,455 2,512,275
x 50,000 = 350,000

x Rp 5 5,000 = 2,512,275

Total = 2,862,275

erjaan 2,7% = 77,281

Total Gaji 2,784,994

Approved by:

A.NASRUM S.AN
Salary For The Month Of january 2017
PT. BALANTANG JAYA MALILI
Nama : Syamsul Basic : 5000/Ton

B/N POSITION Driver


COAL SILICA 5000
Tanggal Tot.Timbangan
Race 1 Race 2 Race 3 Race 1 Race 2 /TON

26-Dec-2016 23,175 26,110 49,285 246,425


27-Dec-2016 21,580 24,045 24,730 70,355 351,775 U.Hadir 8 x 50,000 = 400,000

16-Jan-2017 23,250 24,655 47,905 239,525


17-Jan-2017 24,100 24,465 48,565 242,825 Tot.Tonase 427,845 x Rp 5 5,000 = 2,139,225

19-Jan-2017 25,095 23,035 48,130 240,650


23-Jan-2017 26,810 23,085 49,895 249,475 Total = 2,539,225

24-Jan-2017 23,125 23,995 22,885 70,005 350,025


25-Jan-2017 22,570 21,135 43,705 218,525 Potongan :

- - BPJS Ketenagakerjaan 2,7% = 68,559

- -
- - Total Gaji 2,470,666
- -
- - Prepared by: Approved by:

- -
- -
- -
- -
427,845 2,139,225

A.NASRUM S.AN
Salary For The Month Of January 2017
PT. BALANTANG JAYA MALILI
Nama : Mashud Basic : 5000/Ton

B/N POSITION Driver


COAL SILICA 5000
Tanggal Tot.Timbangan
Race 1 Race 2 Race 3 Race 1 Race 2 Race 3 /TON

27-Dec-2016 21,547 24,060 24,450 70,057 350,285


- - U.Hadir 1 x 50,000

- -
- - Tot.Tonase 70,057 x Rp 5 5,000

- -
- - Total

- -
- - Potongan :

- - BPJS Ketenagakerjaan 2,7%

- -
- - Total Gaji

- -
- - Prepared by:

- -
- -
- -
- -
70,057 350,285
= 50,000

= 350,285

= 400,285

= 10,808

otal Gaji 389,477

Approved by:

A.NASRUM S.AN
Salary For The Month Of January 2016
PT. BALANTANG JAYA MALILI
Nama : Hendra Basic : 5000/Ton

B/N POSITION Driver


COAL 5000
Tanggal Tot.Timbangan
Race 1 Race 2 Race 3 /TON

16-Jan-2017 21,175 24,320 45,495 227,475


17-Jan-2017 23,765 24,700 48,465 242,325 U.Hadir 7 x 50,000 = 350,000

19-Jan-2017 23,770 24,325 22,705 70,800 354,000


20-Jan-2017 25,260 24,065 49,325 246,625 Tot.Tonase 354,345 x Rp 5 5,000 = 1,771,725

21-Jan-2017 24,860 27,305 52,165 260,825


24-Jan-2017 23,075 21,870 44,945 224,725 Total = 2,121,725

25-Jan-2017 22,005 21,145 43,150 215,750


- - Potongan :

- - BPJS Ketenagakerjaan 2,7% = 57,287

- -
- - Total Gaji 2,064,438
- -
- - Prepared by: Approved by:

- -
- -
- -
- -
354,345 1,771,725

A.NASRUM S.AN
Salary For The Month Of January 2017
PT. BALANTANG JAYA MALILI
Nama : Depin Basic : 5000/Ton

B/N POSITION Driver


COAL 5000
Tanggal Tot.Timbangan
Race 1 Race 2 Race 3 /TON

18-Jan-2017 24,305 23,950 23,465 71,720 358,600


19-Jan-2017 25,085 24,425 24,645 74,155 370,775 U.Hadir 4 x 50,000 = 200,000

20-Jan-2017 24,435 24,720 49,155 245,775


21-Jan-2017 23,525 26,930 50,455 252,275 Tot.Tonase 245,485 x Rp 5 5,000 = 1,227,425

- -
- - Total = 1,427,425

- -
- - Potongan :

- - BPJS Ketenagakerjaan 2,7% = 38,540

- -
- - Total Gaji 1,388,885
- -
- - Prepared by: Approved by:

- -
- -
- -
- -
245,485 1,227,425

A.NASRUM S.AN
Salary For The Month Of January 2017
PT. BALANTANG JAYA MALILI
Nama : Firman Basic : 5000/Ton

B/N POSITION Driver


COAL 5000
Tanggal Tot.Timbangan
Race 1 Race 2 Race 3 /TON

18-Jan-2017 23,980 24,370 48,350 241,750


19-Jan-2017 24,270 22,785 47,055 235,275 U.Hadir 5 x

21-Jan-2017 24,385 23,775 48,160 240,800


23-Jan-2017 25,970 23,080 49,050 245,250 Tot.Tonase 262,715 x

24-Jan-2017 22,820 24,505 22,775 70,100 350,500


- -
- -
- - Potongan :

- - BPJS Ketenagakerjaan 2,7%

- -
- -
- -
- - Prepared by:

- -
- -
- -
- -
262,715 1,313,575
50,000 = 250,000

Rp 5 5,000 = 1,313,575

Total = 1,563,575

= 42,217

Total Gaji 1,521,358

Approved by:

A.NASRUM S.AN
Salary For The Month Of january 2017
PT. BALANTANG JAYA MALILI
Nama : Sudirman Basic : 5000/Ton

B/N POSITION Driver


COAL 5000
Tanggal Tot.Timbangan
Race 1 Race 2 Race 3 /TON

18-Jan-2017 25,495 25,880 24,810 76,185 380,925


19-Jan-2017 25,045 25,045 125,225 U.Hadir 5 x 50,000 = 250,000

23-Jan-2017 26,385 22,270 48,655 243,275


24-Jan-2017 23,315 24,875 48,190 240,950 Tot.Tonase 267,600 x Rp 5 5,000 = 1,338,000

25-Jan-2017 23,575 23,070 22,880 69,525 347,625


- - Total = 1,588,000

- -
- - Potongan :

- - BPJS Ketenagakerjaan 2,7% = 42,876

- -
- - Total Gaji 1,545,124
- -
- - Prepared by: Approved by:

- -
- -
- -
- -
267,600 1,338,000

A.NASRUM S.AN
Summary Timbangan Coal January 2017 PT.BJM Summary Timbangan silica Des 2016 PT.BJM

Date Timbangan Coal Date Timbangan Coal


16-Jan-2017 236.705 26-Dec-2016 193.905
17-Jan-2017 241.130 27-Dec-2016 97.285
18-Jan-2017 317.675
19-Jan-2017 265.185
20-Jan-2017 241.855
21-Jan-2017 198.720
23-Jan-2017 245.040
24-Jan-2017 278.780
25-Jan-2017 295.605

TOTAL 2,320.695 TOTAL 291.190

Tot.Tonase 2,655.012
13,275,060
Jemris 9
Saldi 7
Hendra 7
Syamsul 8
Mashud 1
Sudirman 5
Devin 4
Firman 5
46 2,300,000
Rijal 2
Ali Asri 19
21 756,000
16,331,060

Reguler Rijal 16 jam x Rp 14000 224,000


Reguler Ali Asri 172 jam x Rp 14000 2,408,000
Tot.Reguler Checker 2,632,000 BPJS 2,7%

Tot.Hari Checker,Hari Driver,Tonase Driver 18,963,060 512,003 18,451,057


2,000,000
20,451,057
PT.BALANTANG JAYA MALILI

M.BRIANS DARSONO
Summary Timbangan AP 28 Des 2016 PT.BJM

Date Timbangan AP 28
26-Dec-2016 -
27-Dec-2016 43,127

TOTAL 43,127
Timbangan Kosong COAL
Unit Berat Kosong
CT 3644 11,065

CT 3645 10,890

CT 3848 12,110 21,525 SUL

CT 3849 12,055

CT 7116 12,470

CT 7115 12,320

CT 7192 10,990
PT BJM
Balantang Jaya Malili

LAPORAN TIMBANGAN COAL

Date : 26 desember 2016

Timbangan
NO. KEND DRIVERS B/N SHIFT ISI
Kosong
CT 3849 JEMRIS M 35770 12,055
CT 3849 JEMRIS M 35800 12,055
CT 3848 SALDY M 35475 12,110
CT 3848 SALDY M 35840 12,110
CT 3848 SALDY N 36235 12,110
CT 3848 SALDY N 38050 12,110
CT 3849 SYAMSUL N 35230 12,055
CT 3849 SYAMSUL N 38165 12,055

TOTAL
TIMBANGAN COAL

CT 3644 CT 3645 CT 3848 CT 3849


23,715
23,745
23,365
23,730
24,125
25,940
23,175
26,110
- - 97.160 96.745
193.905
Lokasi Dumping
Muatan
SILICA
SILICA
SILICA
SILICA
SILICA
SILICA
SILICA
SILICA
LAPORAN TIMBANGAN COAL

Date : 27 desember 2016

Timbangan
NO. KEND DRIVERS B/N SHIFT ISI
Kosong
CT 3848 MASHUD M 36170 12,110
CT 3848 MASHUD M 36560 12,110
CT 3849 SYAMSUL M 36100 12,055
CT 3849 SYAMSUL M 36785 12,055

TOTAL

LAPORAN TIMBANGAN AP 28

Timbangan
NO. KEND DRIVERS B/N SHIFT ISI
Kosong
CT 3848 MASHUD M 33,657 12,110

CT 3849 SYAMSUL M 33,635 12,055


TIMBANGAN COAL

CT 3644 CT 3645 CT 3848 CT 3849


24,060
24,450
24,045
24,730
- - 48.510 48.775
97.285

TIMBANGAN AP 28

CT 3644 CT 3645 CT 3848 CT 3849


21,547

21,580

21,547 21,580
Lokasi Dumping
Muatan
SILICA
SILICA
SILICA
SILICA

Lokasi Dumping
Muatan
ap 28

ap 28
LAPORAN TIMBANGAN COAL

Date : 16 jan 2017

Timbangan
NO. KEND DRIVERS B/N SHIFT ISI
Kosong CT 7115
CT 7116 HENDRA.K N1 33,645 12,470
CT 7116 HENDRA.K N2 36,790 12,470
CT 7115 JIMRIS M1 36,520 12,320 24,200
CT 7115 JIMRIS M2 36,275 12,320 23,955
CT 7115 JIMRIS M3 36,840 12,320 24,520
CT 7116 SALDI M1 36,065 12,470
CT 7116 SALDI M2 35,170 12,470
CT 7116 SALDI M3 36,805 12,470
CT 7115 SYAMSUL.A N1 35,570 12,320 23,250
CT 7115 SYAMSUL.A N2 36,975 12,320 24,655
120.580
TOTAL 236.705
OAL

CT 7116
21,175
24,320

23,595
22,700
24,335

116.125
Lokasi Dumping
Muatan
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
LAPORAN TIMBANGAN COAL

Date : 17 jan 2017

Timbangan
NO. KEND DRIVERS B/N SHIFT ISI
Kosong CT 7115
CT 7116 HENDRA N1 36,235 12,470
CT 7116 HENDRA N2 37,170 12,470
CT 7115 JIMRIS M1 35,470 12,320 23,150
CT 7115 JIMRIS M2 36,530 12,320 24,210
CT 7115 JIMRIS M3 36,550 12,320 24,230
CT 7116 SALDI M1 36,710 12,470
CT 7116 SALDI M2 36,610 12,470
CT 7116 SALDI M3 36,600 12,470
CT 7115 SYAMSUL N1 36,420 12,320 24,100
CT 7115 SYAMSUL N2 36,785 12,320 24,465
120.155
TOTAL 241.130
OAL

CT 7116
23,765
24,700

24,240
24,140
24,130

120.975
Lokasi Dumping
Muatan
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
LAPORAN TIMBANGAN COAL

Date : 18 jan 2017

Timbangan
NO. KEND DRIVERS B/N SHIFT ISI
Kosong CT 7115
CT 7115 DEFIN M1 36,625 12,320 24,305
CT 7115 DEFIN M2 36,270 12,320 23,950
CT 7115 DEFIN M3 35,785 12,320 23,465
CT 7116 FIRMAN N1 36,450 12,470
CT 7116 FIRMAN N2 36,840 12,470
CT 7115 JEMRIS N1 36,635 12,320 24,315
CT 7115 JEMRIS N2 36,465 12,320 24,145
CT 7116 SALDI M1 36,480 12,470
CT 7116 SALDI M2 36,745 12,470
CT 7116 SALDI M3 37,145 12,470
CT 7192 SUDIRMAN M1 36,485 10,990
CT 7192 SUDIRMAN M2 36,870 10,990
CT 7192 SUDIRMAN M3 35,800 10,990
120.180
TOTAL 317.675
GAN COAL

CT 7116 CT 7192

23,980
24,370

24,010
24,275
24,675
25,495
25,880
24,810
121.310 76.185
Lokasi Dumping
Muatan
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
LAPORAN TIMBANGAN COAL

Date : 19 jan 2017

Timbangan
NO. KEND DRIVERS B/N SHIFT ISI
Kosong CT 7115
CT 7115 DEVIN M1 37,405 12,320 25,085
CT 7115 DEVIN M2 36,745 12,320 24,425
CT 7115 DEVIN M3 36,965 12,320 24,645
CT 7116 FIRMAN N1 36,740 12,470
CT 7116 FIRMAN N2 35,255 12,470
CT 7116 HENDRA M1 36,240 12,470
CT 7116 HENDRA M2 36,795 12,470
CT 7116 HENDRA M3 35,175 12,470
CT 7192 SUDIRMAN M1 36,035 10,990
CT 7115 SYAMSUL N1 37,415 12,320 25,095
CT 7115 SYAMSUL N2 35,355 12,320 23,035
122.285
TOTAL 265.185
GAN COAL

CT 7116 CT 7192

24,270
22,785
23,770
24,325
22,705
25,045

117.855 25.045
Lokasi Dumping
Muatan
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
LAPORAN TIMBANGAN COAL

Date : 20 jan 2017

Timbangan
NO. KEND DRIVERS B/N SHIFT ISI
Kosong CT 7115
CT 7115 DEVIN N1 36,755 12,320 24,435
CT 7115 DEVIN N2 37,040 12,320 24,720
CT 7116 HENDRA N1 37,730 12,470
CT 7116 HENDRA N2 36,535 12,470
CT 7115 JEMRIS M1 36,450 12,320 24,130
CT 7115 JEMRIS M2 35,700 12,320 23,380
CT 7115 JEMRIS M3 36,655 12,320 24,335
CT 7116 SALDI M1 36,875 12,470
CT 7116 SALDI M2 35,310 12,470
CT 7116 SALDI M3 36,755 12,470
121.000
TOTAL 241.855
GAN COAL

CT 7116 CT 7192

25,260
24,065

24,405
22,840
24,285
120.855 -
Lokasi Dumping
Muatan
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
LAPORAN TIMBANGAN COAL

Date : 21 jan 2017

Timbangan
NO. KEND DRIVERS B/N SHIFT ISI
Kosong CT 7115
CT 7115 DEVIN N1 35,845 12,320 23,525
CT 7115 DEVIN N2 39,250 12,320 26,930
CT 7116 FIRMAN M1 36,855 12,470
CT 7116 FIRMAN M2 36,245 12,470
CT 7116 HENDRA NI 37,330 12,470
CT 7116 HENDRA N2 39,775 12,470
CT 7115 JEMRIS M1 36,535 12,320 24,215
CT 7115 JEMRIS M2 36,045 12,320 23,725
98.395
TOTAL 198.720
GAN COAL

CT 7116 CT 7192

24,385
23,775
24,860
27,305

100.325 -
Lokasi Dumping
Muatan
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
LAPORAN TIMBANGAN COAL

Date : 23 jan 2017

Timbangan
NO. KEND DRIVERS B/N SHIFT ISI
Kosong CT 7115
CT 7116 FIRMAN M1 38,440 12,470
CT 7116 FIRMAN M2 35,550 12,470
CT 7115 JEMRIS N1 36,745 12,320 24,425
CT 7115 JEMRIS N2 36,920 12,320 24,600
CT 7116 SALDY N1 36,805 12,470
CT 7116 SALDY N2 36,550 12,470
CT 7192 SUDIRMAN M1 37,375 10,990
CT 7192 SUDIRMAN M2 33,260 10,990
CT 7115 SYAMSUL.A M1 39,130 12,320 26,810
CT 7115 SYAMSUL.A M2 35,405 12,320 23,085
98.920
TOTAL 245.040
GAN COAL

CT 7116 CT 7192
25,970
23,080

24,335
24,080
26,385
22,270

97.465 48.655
Lokasi Dumping
Muatan
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
LAPORAN TIMBANGAN COAL

Date : 24 jan 2017

Timbangan
NO. KEND DRIVERS B/N SHIFT ISI
Kosong CT 7115
CT 7116 FIRMAN M1 35,290 12,470
CT 7116 FIRMAN M2 36,975 12,470
CT 7116 FIRMAN M3 35,245 12,470
CT 7116 HENDRA N1 35,545 12,470
CT 7116 HENDRA N2 34,340 12,470
CT 7115 JEMRIS N1 35,845 12,320 23,525
CT 7115 JEMRIS N2 34,335 12,320 22,015
CT 7192 SUDIRMAN M1 34,305 10,990
CT 7192 SUDIRMAN M2 35,865 10,990
CT 7115 SYAMSUL M1 35,445 12,320 23,125
CT 7115 SYAMSUL M2 36,315 12,320 23,995
CT 7115 SYAMSUL M3 35,205 12,320 22,885
115.545
TOTAL 278.780
GAN COAL

CT 7116 CT 7192
22,820
24,505
22,775
23,075
21,870

23,315
24,875

115.045 48.190
Lokasi Dumping
Muatan
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
LAPORAN TIMBANGAN COAL

Date : 25 jan 2017

Timbangan
NO. KEND DRIVERS B/N SHIFT ISI
Kosong CT 7115
CT 7116 HENDRA N1 34,475 12,470
CT 7115 HENDRA N2 33,465 12,320 21,145
CT 7115 JEMRIS M1 35,245 12,320 22,925
CT 7115 JEMRIS M2 35,895 12,320 23,575
CT 7115 JEMRIS M3 35,795 12,320 23,475
CT 7116 SALDY M1 35,840 12,470
CT 7116 SALDY M2 35,610 12,470
CT 7116 SALDY M3 35,210 12,470
CT 7192 SUDIRMAN M1 34,565 10,990
CT 7192 SUDIRMAN M2 34,060 10,990
CT 7192 SUDIRMAN M3 33,870 10,990
CT 7115 SYAMSUL N1 34,890 12,320 22,570
CT 7116 SYAMSUL N2 33,605 12,470
113.690
TOTAL 295.605
GAN COAL

CT 7116 CT 7192
22,005

23,370
23,140
22,740
23,575
23,070
22,880

21,135
112.390 69.525
Lokasi Dumping
Muatan
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL

You might also like