To specify the PI that is to be generated in the process order when control recipe
is created for the control recipe destination. There are steps to be performed such as
1) Define control recipe destinations
2) Assign PI Categories 3) Set process instructions to be generated automatically
Basic steps in PP-PI:
1.(a) In the master recipe, process instructions are attached to the phases. b) While creating a process order, the control recipe will be created, which will contain the process instruction. c) control recipe will be sent to a proper destination and control recipe will be sent back to the process order and instructions with the data will be available 2) Define profile with default values 3) Assign Material Types 4) Define Recipe Status 5) Define Recipe Usage 6) Define Priority Sequence for auto recipe selection 7) Define Order types 8) Define Order type Dependent parameter 9) Define Number Ranges 10) Process Management 11) Transport Management characteristics 12) Transport Predefined Messages characteristics 13) Define & setup control recipe destination 14) Define process messages characteristics 15) Define & setup message destination 16) Define & setup process message characteristics 17) Define Process Instruction