Configuration Required

You might also like

Download as txt, pdf, or txt
Download as txt, pdf, or txt
You are on page 1of 1

To specify the PI that is to be generated in the process order when control recipe

is created for the control recipe destination. There are steps to be performed
such as

1) Define control recipe destinations


2) Assign PI Categories
3) Set process instructions to be generated automatically

Basic steps in PP-PI:


1.(a) In the master recipe, process instructions are attached to the phases.
b) While creating a process order, the control recipe will be created, which will
contain the process instruction.
c) control recipe will be sent to a proper destination and control recipe will be
sent back to the process order and instructions with the data will be available
2) Define profile with default values
3) Assign Material Types
4) Define Recipe Status
5) Define Recipe Usage
6) Define Priority Sequence for auto recipe selection
7) Define Order types
8) Define Order type Dependent parameter
9) Define Number Ranges
10) Process Management
11) Transport Management characteristics
12) Transport Predefined Messages characteristics
13) Define & setup control recipe destination
14) Define process messages characteristics
15) Define & setup message destination
16) Define & setup process message characteristics
17) Define Process Instruction

You might also like