HELLENIC GAS
TRANSMISSION
o
y DESFA SYSTEM OPERATOR
367-359 MESSOGION AVE.,
15231 ATHENS, GREECE
Tol.: 210 6501258
Fax: 240 8501554
L
TECHNICAL JOB
SPECIFICATION
500/1
REVISION 1
DATE 02/11/2014
LIQUEFIED NATURAL GAS PLANTS
PIPING ENGINEERING
This documents the property of DESFA SA and i shal mot be repeaduced copied or used for any purpose other than that for
lich is pecially furnished( DES. Fi “A HELLENIC GAS TRANSMISSION SYSTEM OPERATOR
Job Spec.No 500/1
Revision 1
Date 02-14-2011
Page 2133
QUALITY ASSURANCE PAGE
CHANGES LOG
- Para3.14
= Para 3.14
- Para 4.1
REVISIONS LOG
J
L
; {
1 02-11-2011] | DESFA COMMENTS PQ DPT | VG.
{
|__0 | 29-06-2011 FIRST ISSUE PQ DPT VG.
"Rev. No] Rev. Date | REASON FOR CHANGE | Made By | Approved By
REVISION 7 UNG PLANT- ~ ‘sort — -
- PIPING ENGINEERING-2 EE
o
; DES: FA HELLENIC GAS TRANSMISSION SYSTEM OPERATOR
Job Spec. No 500/41
Revision 1
Date 02-41-2011
Page 3133
CONTENTS
REFERENCE DOCUMENTS
1.0 SCOPE
20 BASIS OF DESIGN AND SELECTION
3.0 PROCESS SYSTEMS PRACTICES,
40 OFFSITE PIPING
5.0 PIPING DESIGN
6.0 GENERAL NOTES FOR PIPING SYSTEMS
FIG.1 TYPICAL PIPING AT CENTRIFUGAL PUMPS
APPENDIX A ~ CRYOGENIC PIPING DESIGN
“REVISION =ENG PLANT - ‘3007
PIPING ENGINEERING.