DINAS PERTANIAN, PETERNAKAN DAN PERKEBUNAN REKAPITULASI PEKERJAAN : Pembangunan Jalan Pertan

KAB. KEPULAUAN MENTAWAI PERHITUNGAN VOLUME :


TUAPEJAT - SIPORA MEETING KAYU KONTRAKTOR : CV. BERKAT
( BADAN JALAN ) MINGGU KE :
TANGGAL :
No. STA L L" JARAK

1. 00 ± 000 4.00 4.00 25.00


2. 00 ± 003 4.00 4.00 25.00
3. 00 ± 025 4.00 4.00 25.00
4. 00 ± 050 4.00 4.00 25.00
5. 00 ± 075 4.00 4.00 25.00
6. 00 ± 100 4.00 4.00 25.00
7. 00 ± 125 4.00 4.00 25.00
8. 00 ± 150 4.00 4.00 25.00
9. 00 ± 175 4.00 4.00 25.00
10. 00 ± 189 4.00 4.00 25.00
11. 00 ± 190 4.00 4.00 25.00
12. 00 ± 200 4.00 4.00 25.00
13. 00 ± 215 4.00 4.00 25.00
14. 00 ± 237.9 4.00 4.00 25.00
15. 00 ± 240 4.00 4.00 25.00
16. 00 ± 265 4.00 4.00 25.00
17. 00 ± 275 4.00 4.00 25.00
18. 00 ± 300 4.00 4.00 25.00
19. 00 ± 325 4.00 4.00 25.00
20. 00 ± 350 4.00 4.00 25.00
21. 00 ± 375 4.00 4.00 25.00
22. 00 ± 400 4.00 4.00 25.00
23. 00 ± 421.6 4.00 4.00 25.00
24. 00 ± 575 4.00 4.00 25.00
25. 00 ± 600 4.00 4.00 25.00
26. 00 ± 625 4.00 4.00 25.00
27. 00 ± 650 4.00 4.00 25.00
28. 00 ± 675 4.00 4.00 25.00
29. 00 ± 700 4.00 4.00 25.00
30. 00 ± 725 4.00 4.00 25.00
31. 00 ± 750 4.00 4.00 25.00
32. 00 ± 775 4.00 4.00 25.00
33. 00 ± 800 4.00 4.00 25.00
34. 00 ± 825 4.00 4.00 25.00
35. 00 ± 834 4.00 4.00 14.00
36. 00 ± 875 - - -
37. 00 ± 900 - - -
38. 00 ± 923 - - -
39. 00 ± 925 - - -
40. 00 ± 950 - - -
41. 00 ± 975 - - -
42. 01 ± 000 - - -
43. 01 ± 025 - - -
44. 01 ± 050 - - -

Tuapejat, 11 Dese
Disetujui Oleh : Diperiksa Oleh : Dibuat Ole
Pengelola Teknis Konsultan Pengawas Kontraktor Pel
CV. Nugraha Chakti. Const CV. BERK

RICHARD JOEL, ST TEUKU AKMAN N, ST TUHO TELAUM


NIP. 19760806 200604 1 004 Pengawas Lapangan Direktur
Pembangunan Jalan Pertanian Dusun Silaoinan

CV. BERKAT

VOLUME KETERANGAN

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
56.00
-
-
-
-
-
-
-
-
-

3,456.00

Tuapejat, 11 Desember 2014


Dibuat Oleh :
Kontraktor Pelaksana
CV. BERKAT

TUHO TELAUMBANUA
Direktur
DINAS PERTANIAN, PETERNAKAN DAN PERKEBUNAN REKAPITULASI PEKERJAAN : Pembangunan Jalan Pertan
KAB. KEPULAUAN MENTAWAI PERHITUNGAN VOLUME
TUAPEJAT - SIPORA TIMBUNAN PILIHAN KONTRAKTOR : CV. BERKAT
( BADAN JALAN ) MINGGU KE :
TANGGAL :
No. STA LA LB T1 T2 T3 T" LUAS JARAK VOLUME

1. 00 ± 000 4.00 4.00 0.15 0.15 0.15 0.15 0.60 - -


2. 00 ± 003 4.00 4.00 0.15 0.15 0.15 0.15 0.60 3.00 1.80
3. 00 ± 025 4.00 4.00 0.15 0.15 0.15 0.15 0.60 22.00 13.20
4. 00 ± 050 4.00 4.00 0.15 0.15 0.15 0.15 0.60 25.00 15.00
5. 00 ± 075 4.00 4.00 0.15 0.15 0.15 0.15 0.60 25.00 15.00
6. 00 ± 100 4.00 4.00 0.15 0.15 0.15 0.15 0.60 25.00 15.00
7. 00 ± 125 2.50 2.50 0.10 0.10 0.10 0.10 0.25 25.00 6.25
8. 00 ± 150 2.50 2.50 0.05 0.05 0.05 0.05 0.13 25.00 3.13
9. 00 ± 175 2.50 2.50 0.05 0.05 0.05 0.05 0.13 25.00 3.13
10. 00 ± 189 2.50 2.50 0.05 0.05 0.05 0.05 0.13 14.00 1.75
11. 00 ± 190 2.50 2.50 0.05 0.05 0.05 0.05 0.13 1.00 0.13
12. 00 ± 200 2.50 2.50 0.05 0.05 0.05 0.05 0.13 10.00 1.25
13. 00 ± 215 2.50 2.50 0.06 0.06 0.06 0.06 0.15 15.00 2.25
14. 00 ± 237.9 2.50 2.50 0.05 0.05 0.05 0.05 0.13 22.90 2.86
15. 00 ± 240 2.50 2.50 0.06 0.06 0.05 0.06 0.14 2.10 0.30
16. 00 ± 265 2.50 2.50 0.05 0.05 0.05 0.05 0.13 25.00 3.13
17. 00 ± 275 2.50 2.50 0.05 0.05 0.05 0.05 0.13 10.00 1.25
18. 00 ± 300 2.50 2.50 0.04 0.03 0.05 0.04 0.10 25.00 2.50
19. 00 ± 325 2.50 2.50 0.04 0.04 0.05 0.04 0.11 25.00 2.71
20. 00 ± 350 2.50 2.50 0.05 0.05 0.05 0.05 0.13 25.00 3.13
21. 00 ± 375 2.50 2.50 0.05 0.05 0.05 0.05 0.13 25.00 3.13
22. 00 ± 400 2.50 2.50 0.05 0.05 0.05 0.05 0.13 25.00 3.13
23. 00 ± 421.6 2.50 2.50 0.05 0.05 0.05 0.05 0.13 21.60 2.70
24. - - - - - - - - -
25. - - - - - - - - -
26. - - - - - - - - -
27. - - - - - - - - -
28. - - - - - - - - -
29. - - - - - - - - -
30. - - - - - - - - -
31. - - - - - - - - -
32. - - - - - - - - -
33. - - - - - - - - -
34. - - - - - - - - -
35. - - - - - - - - -
36. - - - - - - - - -
37. - - - - - - - - -
38. - - - - - - - - -
39. - - - - - -
40. - - - - - -
41. - - - - - -
42. - - - - - -
43. - - - - - -
44. - - - - - -
45. - - - - - -
421.60 102.69

Tuapejat, 12 Dese
Disetujui Oleh : Diperiksa Oleh : Dibuat Ole
Pengelola Teknis Konsultan Pengawas Kontraktor Pel
CV. Nugraha Chakti. Const CV. BERK

RICHARD JOEL, ST TEUKU AKMAN N, ST TUHO TELAUM


NIP. 19760806 200604 1 004 Pengawas Lapangan Direktur
Pembangunan Jalan Pertanian Dusun Silaoinan

CV. BERKAT

VOLUME KETERANGAN

-
1.80
13.20
15.00 125.58
15.00
15.00
6.25
3.13
3.13
1.75
0.13
1.25
2.25
2.86
0.30
3.13
1.25
2.50
2.71
3.13
3.13
3.13
2.70
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
102.69

Tuapejat, 12 Desember 2014


Dibuat Oleh :
Kontraktor Pelaksana
CV. BERKAT

TUHO TELAUMBANUA
Direktur
DINAS PERTANIAN, PETERNAKAN DAN PERKEBUNAN REKAPITULASI PEKERJAAN : Pembangunan Jalan Pertan
KAB. KEPULAUAN MENTAWAI PERHITUNGAN VOLUME
TUAPEJAT - SIPORA PLASTIK COR KONTRAKTOR : CV. BERKAT
( BADAN JALAN ) MINGGU KE :
TANGGAL :
No. STA LA OL KK LT L" JARAK

1. 00 ± 000 2.50 0.30 2.80 2.80 25.00


2. 00 ± 025 2.50 0.30 2.80 2.80 25.00
3. 00 ± 050 2.50 0.30 2.80 2.80 25.00
4. 00 ± 075 2.50 0.30 2.80 2.80 25.00
5. 00 ± 100 2.50 0.30 2.80 2.80 25.00
6. 00 ± 125 2.50 0.30 2.80 2.80 25.00
7. 00 ± 150 2.50 0.30 2.80 2.80 25.00
8. 00 ± 175 2.50 0.30 2.80 2.80 25.00
9. 00 ± 190 2.50 0.30 2.80 2.80 25.00
10. 00 ± 225 2.50 0.30 2.80 2.80 25.00
11. 00 ± 250 2.50 0.30 2.80 2.80 25.00
12. 00 ± 275 2.50 0.30 2.80 2.80 25.00
13. 00 ± 300 2.50 0.30 2.80 2.80 25.00
14. 00 ± 304.9 2.50 0.30 2.80 2.80 4.90
15. 00 ± 350 2.50 0.30 2.80 2.80 25.00
16. 00 ± 375 2.50 0.30 2.80 2.80 25.00
17. 00 ± 400 2.50 0.30 2.80 2.80 25.00
18. 00 ± 421.6 2.50 0.30 2.80 2.80 25.00
19. - - - - -
20. - - - - -
21. - - - - -
22. - - - - -
23. - - - - -
24. - - - - -
25. - - - - -
26. - - - - -
27. - - - - -
28. - - - - -
29. - - - - -
30. - - - - -
31. - - - - -
32. - - - - -
33. - - - - -
34. - - - - -
35. - - - - -
36. - - - - -
37. - - - - -
38. - - - - -
39. - - - - -
40. - - - - -
41. - - - - -
42. - - - - -
43. - - - - -
44. - - - - -
45. - - - - -

Tuapejat, 12 Dese
Disetujui Oleh : Diperiksa Oleh : Dibuat Ole
Pengelola Teknis Konsultan Pengawas Kontraktor Pel
CV. Nugraha Chakti. Const CV. BERK

RICHARD JOEL, ST TEUKU AKMAN N, ST TUHO TELAUM


NIP. 19760806 200604 1 004 Pengawas Lapangan Direktur
Pembangunan Jalan Pertanian Dusun Silaoinan

CV. BERKAT

VOLUME KETERANGAN

70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
13.72
70.00
70.00
70.00
70.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1,203.72

Tuapejat, 12 Desember 2014


Dibuat Oleh :
Kontraktor Pelaksana
CV. BERKAT

TUHO TELAUMBANUA
Direktur
DINAS PERTANIAN, PETERNAKAN DAN PERKEBUNAN REKAPITULASI PEKERJAAN : Pembangunan Jalan Pertan
KAB. KEPULAUAN MENTAWAI PERHITUNGAN VOLUME
TUAPEJAT - SIPORA PAPAN BEKISTING KONTRAKTOR : CV. BERKAT
( BADAN JALAN ) MINGGU KE :
TANGGAL :
No. STA KR KN L L" JARAK

1. 00 ± 000 0.15 0.15 0.30 0.30 -


2. 00 ± 003 0.15 0.15 0.30 0.30 3.00
3. 00 ± 025 0.15 0.15 0.30 0.30 22.00
4. 00 ± 050 0.15 0.15 0.30 0.30 25.00
5. 00 ± 075 0.15 0.15 0.30 0.30 25.00
6. 00 ± 100 0.15 0.15 0.30 0.30 25.00
7. 00 ± 125 0.15 0.15 0.30 0.30 25.00
8. 00 ± 150 0.15 0.15 0.30 0.30 25.00
9. 00 ± 175 0.15 0.15 0.30 0.30 25.00
10. 00 ± 189 0.15 0.15 0.30 0.30 14.00
11. 00 ± 190 0.15 0.15 0.30 0.30 1.00
12. 00 ± 200 0.15 0.15 0.30 0.30 10.00
13. 00 ± 215 0.15 0.15 0.30 0.30 15.00
14. 00 ± 237.9 0.15 0.15 0.30 0.30 22.90
15. 00 ± 240 0.15 0.15 0.30 0.30 2.10
16. 00 ± 265 0.15 0.15 0.30 0.30 25.00
17. 00 ± 275 0.15 0.15 0.30 0.30 10.00
18. 00 ± 300 0.15 0.15 0.30 0.30 25.00
19. 00 ± 325 - 25.00
20. 00 ± 350 - 25.00
21. 00 ± 375 - 25.00
22. 00 ± 400 - 25.00
23. 00 ± 418.6 - 21.60
24. - -
25. - -
26. - -
27. - -
28. - -
29. - -
30. - -
31. - -
32. - -
33. - -
34. - -
35. - -
36. - -
37. - -
38. - -
39. - -
40. - -
41. - -
42. - -
43. - -
44. - -
45. - -

Tuapejat, 12 Dese
Disetujui Oleh : Diperiksa Oleh : Dibuat Ole
Pengelola Teknis Konsultan Pengawas Kontraktor Pel
CV. Nugraha Chakti. Const CV. BERK

RICHARD JOEL, ST TEUKU AKMAN N, ST TUHO TELAUM


NIP. 19760806 200604 1 004 Pengawas Lapangan Direktur
Pembangunan Jalan Pertanian Dusun Silaoinan

CV. BERKAT

VOLUME KETERANGAN

-
0.90
6.60
7.50
7.50
7.50
7.50
7.50
7.50
4.20
0.30
3.00
4.50
6.87
0.63
7.50
3.00
7.50
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
90.00

Tuapejat, 12 Desember 2014


Dibuat Oleh :
Kontraktor Pelaksana
CV. BERKAT

TUHO TELAUMBANUA
Direktur
DINAS PERTANIAN, PETERNAKAN DAN PERKEBUNAN REKAPITULASI PEKERJAAN : Pembangunan Jalan Pertan
KAB. KEPULAUAN MENTAWAI PERHITUNGAN VOLUME
TUAPEJAT - SIPORA Cor Beton KONTRAKTOR : CV. BERKAT
( BADAN JALAN ) MINGGU KE :
TANGGAL :
No. STA LA LB T1 T2 T3 T" LUAS LUAS" JARAK

1. 00 ± 000 2.50 2.50 0.15 0.15 0.15 0.15 0.38 0.38 -


2. 00 ± 003 2.50 2.50 0.15 0.15 0.15 0.15 0.38 0.38 3.00
3. 00 ± 025 2.50 2.50 0.15 0.15 0.15 0.15 0.38 0.38 22.00
4. 00 ± 050 2.50 2.50 0.15 0.15 0.15 0.15 0.38 0.38 25.00
5. 00 ± 075 2.50 2.50 0.15 0.15 0.15 0.15 0.38 0.38 25.00
6. 00 ± 100 2.50 2.50 0.15 0.15 0.15 0.15 0.38 0.38 25.00
7. 00 ± 125 2.50 2.50 0.14 0.13 0.14 0.14 0.34 0.36 25.00
8. 00 ± 150 2.50 2.50 0.12 0.12 0.12 0.12 0.30 0.30 25.00
9. 00 ± 175 2.50 2.50 0.12 0.12 0.12 0.12 0.30 0.30 25.00
10. 00 ± 189 2.50 2.50 0.12 0.12 0.12 0.12 0.30 0.30 14.00
11. 00 ± 190 2.50 2.50 0.15 0.15 0.15 0.15 0.38 0.38 1.00
12. 00 ± 200 2.50 2.50 0.13 0.13 0.13 0.13 0.33 0.33 10.00
13. 00 ± 215 2.50 2.50 0.07 0.07 0.07 0.07 0.18 0.18 15.00
14. 00 ± 237.9 2.50 2.50 0.14 0.14 0.14 0.14 0.35 0.35 22.90
14. 00 ± 240 2.50 2.50 0.12 0.12 0.12 0.12 0.30 0.30 2.10
15. 00 ± 265 2.50 2.50 0.13 0.13 0.13 0.13 0.33 0.33 25.00
16. 00 ± 275 2.50 2.50 0.13 0.13 0.13 0.13 0.33 0.33 10.00
17. 00 ± 300 2.50 2.50 0.13 0.13 0.13 0.13 0.33 0.33 25.00
18. 00 ± 325 2.50 2.50 0.15 0.15 0.15 0.15 0.38 0.38 25.00
19. 00 ± 350 2.50 2.50 0.15 0.15 0.15 0.15 0.38 0.38 25.00
20. 00 ± 375 2.50 2.50 0.15 0.15 0.15 0.15 0.38 0.38 25.00
21. 00 ± 400 2.50 2.50 0.15 0.15 0.15 0.15 0.38 0.38 25.00
22. 00 ± 418.6 2.50 2.50 0.15 0.15 0.15 0.15 0.38 0.38 21.60
23. - -
24. - -
25. - -
26. - -
27. - -
28. - -
29. - -
30. - -
31. - -
32. - -
33. - -
34. - -
35. - -
36. - -
37. - -
38. - -
39. - -
40. - -
41. - -
42. - -
43. - -
44. - -
45. - -
46. - -
47. - -
421.60

Tuapejat, 12 Dese
Disetujui Oleh : Diperiksa Oleh : Dibuat Ole
Pengelola Teknis Konsultan Pengawas Kontraktor Pel
CV. Nugraha Chakti. Const CV. BERK

RICHARD JOEL, ST TEUKU AKMAN N, ST TUHO TELAUM


NIP. 19760806 200604 1 004 Pengawas Lapangan Direktur
Pembangunan Jalan Pertanian Dusun Silaoinan

CV. BERKAT

VOLUME KETERANGAN

-
1.13
8.25
9.38
9.38
9.38
9.04
7.50
7.50
4.20
0.38
3.25
2.63
8.02
0.63
8.13
3.25
8.13
9.38
9.38
9.38
9.38
8.10
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
145.74

Tuapejat, 12 Desember 2014


Dibuat Oleh :
Kontraktor Pelaksana
CV. BERKAT

TUHO TELAUMBANUA
Direktur
DINAS PERTANIAN, PETERNAKAN DAN PERKEBUNAN REKAPITULASI PEKERJAAN : Pembangunan Jalan Pertan
KAB. KEPULAUAN MENTAWAI PERHITUNGAN VOLUME
TUAPEJAT - SIPORA PEMBUATAN ALUR KONTRAKTOR : CV. BERKAT
( BADAN JALAN ) MINGGU KE :
TANGGAL :
No. STA L L" JARAK

1. 00 ± 000 - - -
2. 00 ± 003 - - 3.00
3. 00 ± 025 - - 22.00
4. 00 ± 050 - - 25.00
5. 00 ± 075 - - 25.00
6. 00 ± 100 - - 25.00
7. 00 ± 125 - - 25.00
8. 00 ± 150 - - 25.00
9. 00 ± 175 - - 25.00
10. 00 ± 189 - - 14.00
11. 00 ± 190 - - 1.00
12. 00 ± 200 - - 10.00
13. 00 ± 215 - - 15.00
14. 00 ± 237.9 - - 22.90
15. 00 ± 240 - - 2.10
16. 00 ± 265 - - 25.00
17. 00 ± 275 - - 10.00
18. 00 ± 300 - - 25.00
19. 00 ± 325 - - 25.00
20. 00 ± 350 - - 25.00
21. 00 ± 375 - - 25.00
22. 00 ± 400 - - 25.00
23. 00 ± 418.6 - - 21.60
24. - -
25. - -
26. - -
27. - -
28. - -
29. - -
30. - -
31. - -
32. - -
33. - -
34. - -
35. - -
36. - -
37. - -
38. - -
39. - -
40. - -
41. - -
42. - -
43. - -
44. - -
45. - -

Tuapejat, 12 Dese
Disetujui Oleh : Diperiksa Oleh : Dibuat Ole
Pengelola Teknis Konsultan Pengawas Kontraktor Pel
CV. Nugraha Chakti. Const CV. BERK

RICHARD JOEL, ST TEUKU AKMAN N, ST TUHO TELAUM


NIP. 19760806 200604 1 004 Pengawas Lapangan Direktur
Pembangunan Jalan Pertanian Dusun Silaoinan

CV. BERKAT

VOLUME KETERANGAN

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

Tuapejat, 12 Desember 2014


Dibuat Oleh :
Kontraktor Pelaksana
CV. BERKAT

TUHO TELAUMBANUA
Direktur