Case-1: Subcase-1: C 100 Subcase-2: C 130
Case-1: Subcase-1: C 100 Subcase-2: C 130
Q=1917 cusec ( 5 Rows of 3.2 m dia MS Pipe), Q(per pipe)= 1917/5= 383.4 cusec=
1086.4 lit/sec.
SubCase 1: Total head loss=Head loss due to pipe friction + Minor losses( 10% of SubCase 2:Total head loss=Head loss due to pipe friction + Minor losses( 10% of
pipe friction loss Assumed) pipe friction loss Assumed)
Total head loss (m) 185.745397 Total head loss (m) 114.2602
FSL
334.2 m offtake
level (At
Tajewala:)
Net Head :
334.2- Ht. above
231.7= ground
Storage level: 5.7 m
270 Km Storage
102.5 m Resevoir FRL:
Reservoir
(At 226+5.7=
Jhunjhun) 231.7 m EL: 226 m
Q(Allowable)=1390.6 cusec, ( 5 Rows of 3.2 m dia MS Pipe), Q(per pipe)= Q(Allowable)=1807.75 cusec, ( 5 Rows of 3.2 m dia MS Pipe), Q(per
1917/5= 278.12 cusec= 7875.61 lit/sec. pipe)= 1917/5=361.55 cusec= 10238 lit/sec.
Total head loss=Head loss due to pipe friction + Minor losses( 10% of pipe friction Total head loss=Head loss due to pipe friction + Minor losses( 10% of pipe friction
loss Assumed) loss Assumed)
Total head loss (m) 102.5 Total head loss (m) 102.5
Q=1917 cusec ( 5 Rows of 3.2 m dia MS Pipe), Q(per pipe)= 1917/5= 383.4 cusec=
1086.4 lit/sec.
SubCase 2: Total head loss=Head loss due to pipe friction + Minor losses( 10% of SubCase 2: Total head loss=Head loss due to pipe friction + Minor losses( 10% of
pipe friction loss Assumed) pipe friction loss Assumed)
Total head loss (m) 102.500023 Total head loss (m) 102.50003