Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
Introduction
1. The Proposal
2. Scope of Work
3. Qualification Criteria
Page 2
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
In this section Tender Inviting Authority will provide the detail from where
bidder will collect tender document. The tender document can be
downloaded from tender inviting authority and collected physically from
office of tender inviting authority by paying tender fee. The tender
document down loaded from the official website of tender inviting authority
and tender fee (non-refundable) will be submitted in the form of pay
order/demand draft favour of tender inviting authority payable at tender
inviting authority office at the time of submission of the proposal. Thus in
this section tender inviting authority will provided detail of tender
document cost, payable at and address of tender inviting authority.
The tender document will also mention the last date of tender submission
date of tender under this section.
Page 3
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
Section 1
Part I
Standards
1. Definitions
(a) “Employer” means IR who will be invited the bids for Energy Audit
services and with which the selected Agency to sign the Contract for the
Services and to which the selected Agency shall provide services as per
the terms and conditions and TOR of the contract.
(b) Energy Auditing Agency/Firm means ENERGY AUDIT FIRMS, who will
conduct Energy Audit in Indian Railways Installations as per scope of
work provided in Indian Railways Energy Audit Manual/Guidelines and
this contract procedures.
(c) “Project specific information” means such part of the Instructions used
to reflect specific project and assignment conditions.
Page 4
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
2. Background Information
Overview
Indian Railway (IR) is one of the largest organization with the highest
electricity consumption in India. It consumes about 2.4% of India’s total
electricity consumption. In the fiscal year (FY) 2007-08, Indian Railways
consumed 14.1 billion kilowatt-hours (kWh), of which 11.7 billion (about
83%) for traction usages and 2.4 billion (17%) in non-traction usages (IR
Year Book 2007-08). It is estimated that the total demand of electricity in
the railways sector will grow at a rate of more than 9% annually. The
electricity consumption is projected to be about 100.5 billion kWh by
2031-32 with the electrification dominant scenario. Therefore, an
enormous energy saving potential exists in the Indian Railways (IR)
sector through energy audits.
3. Pre-qualification Criteria for Bidder
This section will provide general pre-qualification criteria for
Page 5
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
The agency interested in being considered for this project must fulfill the
following criteria and submit the documents in support thereof as
mentioned below. RFP/Tender document submitted without supporting
documents shall be considered as non-responsive and the proposal shall
not be evaluated:
a The Agency should have conducted energy audit for at least five
major PSUs/Govt./Corporate for Offices/Hospitals/Workshops/
Building with minimum connected load equivalent of load for which
energy audit is being proposed in last three years.
d The agency should not be involved in any major litigation that may
have an impact of affecting or compromising the delivery of services
as required under this contract
4. Evaluation of Proposal
Railway may adopt single stage offer / two packets as per their
requirement.
Page 6
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
Characteristic
A. Proposed Approach
1. Approach to carry out energy audits
2. Development of protocol and format
of energy audit report
3. Approach to do Baseline Estimation
and defining benchmark for each
utility being audited
B. Work Plan/Staffing
Team (No. of person associated) and their
experience)
Page 7
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
From the time the Proposal is opened to the time the Contract is
awarded, the Agency should not contact the tender inviting authority
on any matter related to its Financial Proposal.
5.2 At any time before the submission of Proposal by bidder, the tender
Page 8
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
6. Proposal Validity
6.1 The bidders indicate how long their proposal for energy audit
remains valid after the submission date. However, the proposal
submitted by bidder must valid up to 90 days from the last date of
submission of the proposal. During this period, Agency shall maintain
the availability of Professional staff nominated, services offered in the
Proposal and also the financial proposal unchanged. The Employer will
make its best effort to complete negotiations within this period. However,
the employer may request Agency to extend the validity period of their
proposal if any need arises. Agency who agree to such extension shall
confirm that they maintain the availability of the professional staff
nominated, services offered in the Proposal and their financial proposal
remain unchanged, or in their confirmation of extension of validity of the
Proposal, Agency could submit new staff in replacement, who would be
considered in the final evaluation for contract award. Agencies who do
not agree have the right to refuse to extend the validity of their Proposal;
under such circumstance the Employer shall not consider such proposal
for further evaluation.
7.3 In preparing their Proposal, Agency are expected to examine in detail the
documents comprising the tender document. Material deficiencies in
Page 9
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
7.5 An authorized representative of the Agency shall initial all pages of the
original Financial Proposal. The authorization shall be in the form of a
written power of attorney accompanying the Proposal or in any other
form demonstrating that the representative has dully authorized to sign.
The signed Financial Proposal shall be marked “ORIGINAL”.
8.1 The Employer shall issue a Letter of Intent to the selected Agency and
promptly notify all other energy auditing firm who have submitted
Proposal about the decision taken.
8.2 The Agency will sign the contract after fulfilling all the formalities/pre-
conditions within --- days of issuance of the letter of intent.
8.3 The Agency is expected to commence the Assignment/job on the date and
at the location specified in the Part II Data Sheet.
Page 10
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
8.5 The shortlisted agency will use their own equipment for conducting
energy audit of the specified utility in tender. However, equipment
available with tender inviting authority will also be used by agency if
required.
8.6 The bidder selected for the assignment should furnish a performance
guarantee in favor of tender inviting authority for 10% of the value of
accepted tender value for a period of 12 month (from the date of
awarding contract) from a nationalized/public sector bank in India. The
performance guarantee will be submitted within a period of 15 days from
the date of awarding contract.
8.7 The selected bidder will request documents required for energy audit
from employer within one week from the date of awarding of contract.
8.8 The employer will submit all requested document to selected bidder
within 10 days from the requested date by agency.
8.9 Once all documents received by bidder from employer then within 10
days from receiving all document, the selected bidder will developed their
methodology to work and have meeting with employer.
9.1 The selected agency is expected to complete the project within ---
days from the date of signing of the contract.
10. Confidentiality
Page 11
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
the rejection of its Proposal and may be subject to the provisions of the
Employer’s antifraud and corruption policy.
a) War/hostilities
In the event of any force majeure cause, the bidder or the employer shall
not be liable for delays in performing their obligations under this order
and the completion dates may be extended, for a period not exceeding
the period of delay attributable to the causes of Force Majeure. Neither
INDIAN RAILWAYS (IR) nor Bidder shall be liable to pay extra costs
provided it is mutually established that Force Majeure Conditions did
actually exist.
The Bidder shall at all times, Indemnify and keep indemnified, the
employer and its officer’s servants and agents, from and against all/any
claims whatsoever, arising as a consequence of, or in the course of
execution of the work (including but not limited to property loss and
damage, personal accident, injury or death of or to property or person, of
the Agency or any JV partner or subcontractor, and / or the servants or
agents of the ENERGY AUDIT FIRMS, or any other JV partner or any sub
contractor and / or of the INDIAN RAILWAYS (IR)).
The Technical proposal prepared by the firm shall comprise the following
components:
Page 12
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
The Financial proposal prepared by the firm shall comprise the following
components:
Page 13
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
Section 2
Part II
Data Sheet
Page 14
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
Section 3
1.1 Form 1
[Location, Date]
To
Mr. xxxxx,
xxxx, 3rd Floor, Baroda House,
New Delhi -110001, India
Dear Sir,
Sub: Hiring of agency for conducting Energy Audits in railway
stations, hospitals, offices, residential colonies, production
units, workshops etc
1. The undersigned Bidders, having read and examined in detail all the
RFP/Tender document documents in respect of appointment of a
Bidder for INDIAN RAILWAYS (IR), do hereby submit their proposal to
provide services as specified in the scope of work.
Page 15
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
Page 16
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
Bid processing fee of Rs. XXXX/- in form of DD drawn in favor of Indian Railway
Registered Power of Attorney executed by the Bidder in favor of the contact person
or the duly Authorized Representative, certifying him/her as an authorized
signatory for the purpose of this proposal
We hereby declare that our proposal is made in good faith and the information
contained is true and correct to the best of our knowledge and belief.
Thanking you,
Yours faithfully
Name :
Designation :
Seal :
Date :
Place :
Business Address:
Witness: Bidder:
Signature Signature
Name Name
Address Designation
Company
Date Date
Page 17
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
1.2 Form2
Organizational Profile
1.12 Email
Page 18
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
Witness: Bidder:
Signature Signature
Name Name
Address Designation
Company
Date Date
1.3 Form3
1) One page giving details of at least five energy audit carried out in
Government/PSU/Corporate buildings, hospitals, offices, commercial
complexes having load more than prescribed in tender.
Page 19
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
1.4 Form4
1.5 Form5
a) Approach to carry out energy audits: In this, the Agency shall outline
their approach and methodology to identify energy consuming operations
as per scope of this tender and existing status and performance of
operations, which includes measurements, saving potential and ways to
achieve the savings and cost benefit analysis of different options. This
portion would highlight ENERGY AUDIT FIRMS/ESCO’s past experience
in working for government sector.
Page 20
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
1.6 Form6
1. Key Professionals
2. Team Members
Page 21
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
1.7 Form7
Profession: ___________________________________________
____________________________________________________
_____________________________________________________
Key Qualifications:
______________________________________________________________________
Education:
Page 22
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
__________________________________________________________
Employment Record:
[Starting with the present position, list in reverse order every employment
held. List all positions held by staff member since graduation, giving
dates, names of employing organizations, titles of position held, and
locations of assignments. For experience in last ten years, also give types
of activities performed and client references, where appropriate.]
________________________________________________________
Relevant experience:
Languages:
__________________________________________________________
Certification:
Page 23
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
1.8 Form8
Work Schedule
1. (1) Sub-total
2. (2) Sub-total
3. (3) Sub-total
4. (4) Sub-total
(Authorized Representative)
Page 24
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
1.9 Form9
Name of Bidder/Firm:
Assignment/job name:
Country:
Duration of Assignment/job
(months)
Name of Employer:
Page 25
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
Completion date
(month/year):
No of professional staff-
months provided by
associated Bidders:
Witness: Bidder:
Signature Signature
Name Name
Address Designation
Company
Date Date
Page 26
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
Envelope B
1.10 Form1
[Location, Date]
Dear Sirs,
We understand you are not bound to accept any Proposal you receive.
We remain,
Yours Sincerely
Name of Firm:
Address:
Page 27
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
1.11 Form2
SUMMARY OF COSTS
2 Total
Designation..........................................................................................
Name of firm:
Address:
Page 28
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
1.12 Form3
Declaration letter
We are not involved in any major litigation that may have an impact of
affecting or compromising the delivery of services as required under this
contract
Witness: Bidder:
Signature Signature
Name Name
Address Designation
Company
Date Date
Page 29
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
Section 4
Terms of Reference
Part I
The scope of work will be generally as per Indian Railways Energy Audit
Manuals/Guidelines. However, specific scope of work will be defined by
the tender inviting authority in accordance specific requirement of
site/project. In preparation of specific scope of work, the tender inviting
authority can refer energy audit manuals/guidelines prepared by Indian
Railways.
Page 30
Standard Template for Contract Procedure for Energy Audits Services in Indian Railways
3. Release of payment
3.1 The Agency shall submit the invoice for the payment when the
payment is due as per the agreed terms. The payment shall be
released as per the payment terms indicated under Para 3.2 below.
3.2 Once a milestone is completed, the Agency shall submit the requisite
deliverables as specified in this Contract. The Employer shall release
the requisite payment upon acceptance of the deliverables.
a. Final Payment: The final payment shall be made only after the final
report and a final statement, approved by the “Employer” as
satisfactory.
d. With the exception of the final payment under (a) above, payments
do not constitute acceptance of the Services nor relieve the Agency
of any obligations hereunder, unless the acceptance by the
Employer to the Agency in writing and the Agency has made
necessary changes as per the comments / suggestions of the
Employer communicated to the ENERGY AUDIT FIRMS.
*********