PI X= 100,004.166 PI X= 100,034.074 PI X= PI X= 100,182.

672 PI X=
100068.315

NO. 01 Y= 100,044.57 NO. 02 Y= 100,135.093 NO. 03 Y= NO. 04 Y= 100,258.273 NO. 05 Y=


100,188.102
STA 0 + 045,47 STA 0 + 140,710 STA 0 + 203,560 STA 0 + 337,200 STA

Δ 7º54'26" Δ 14º34'38" Δ 25º36'22" Δ 52º02'32" Δ

V 40 Km/Jam V 40 Km/Jam V 40 Km/Jam V 40 Km/Jam V

R 450 m R 185 m R 70 m R 50 m R

d 95.339 m d 63.106 m d 134.17 m d 182.086 m d

Ls Ls Ls Ls Ls

Lc 62.103 m Lc 47.068 m Lc 31.284 m Lc 45.415 m Lc

Ts Ts Ts Ts Ts

Tc 31.101 m Tc 23.662 m Tc 15.907 m Tc 24.409 m Tc

Es Es Es Es Es

Ec 1.073 m Ec 1.507 m Ec 1.785 m Ec 5.640 m LT

e 3.00 % e 3.00 % e 8.00 % e 9.00 % e

PI X= 100,517.517 PI X= 100,606.911 PI X= 100,656.391 PI X= 100,752.607 PI X=

NO. 07 Y= 100,426.010 NO. 08 Y= 100,508.482 NO. 09 Y= 100,578.885 NO. 10 Y= 100,603.185 NO. 11 Y=

STA 0 + 781,230 STA 0 + 902,74 STA 0 + 988,65 STA 1 + 084,800 STA

Δ 10º08'26" Δ 12º12'22" Δ 40º43'32" Δ 40º43'06" Δ

V 40 Km/Jam V 40 Km/Jam V 40 Km/Jam V 40 Km/Jam V


R 250 m R 175 m R 98 m R 92 m R

d 121.626 m d 86.051 m d 99.238 m d 59.072 m d

Ls Ls Ls Ls Ls

Lc 44.246 m Lc 37.281 m Lc 69.658 m Lc 56.363 m Lc

Ts Ts Ts Ts Ts

Tc 22.181 m Tc 18.711 m Tc 36.373 m Tc 29.097 m Tc

Es Es Es Es Es

Ec 0.982 m Ec 0.997 m Ec 6.532 m Ec 4.492 m Ec

e 3.00 % e 3.00 % e 5.00 % e 6.00 % e


X= 100,353.218 PI X= 100,423.125

Y= 100,194.481 NO. 06 Y= 100,301.500

0 + 515,883 STA 0 + 625,00

77º21'17" Δ 04º00'44"

40 Km/Jam V 40 Km/Jam

65 m R 500 m

127.829 m d 156.245 m

50 m Ls

37.756 m Lc 35.013 m

78.234 m Ts

Tc 17.514 m

20.389 m Es

137.756 m Ec 0.307 m

8.50 % e LN

X= 100,791.147 PI X= 100,901.730

Y= 100,647.954 NO. 12 Y= 100,723.461

1 + 142,040 STA 1 + 275,600

14º57'00" Δ 33º07'54"

40 Km/Jam V 40 Km/Jam
228.445 m R 60 m

133.903 m d 92.644 m

Ls

59.607 m Lc 34.695 m

Ts

29.975 m Tc 17.848 m

Es

1.800 m Ec 2.598 m

3.00 % e 5.00 %
PI X= 100,994.354 PI X= 101,061.536 PI X= 101,111.282 PI X= 101,141.825 PI X=

NO. 13 Y= 100,725.392 NO. 14 Y= 100,889.062 NO. 15 Y= 101,012.808 NO. 16 Y= 101,111.361 NO. 17 Y=

STA 1 + 367,243 STA 1 + 533,930 STA 1 + 667,300 STA 1 + 770,45 STA

Δ 66º29'20" Δ 00º25'01" Δ 04º40'52" Δ 02º44'25" Δ

V 40 Km/Jam V 60 Km/Jam V 60 Km/Jam V 60 Km/Jam V

R 68 m R NO CURVE R 600 m R 1500 m R

d 176.922 m d 133.37 m d 103.178 m d 179.014 m d

Ls Ls Ls Ls Ls

Lc 78.911 m Lc Lc 49.020 m Lc 71.740 m Lc

Ts Ts Ts Ts Ts

Tc 44.573 m Tc Tc 24.524 m Tc 35.877 m Tc

Es Es Es Es Es

Ec 13.307 m Ec Ec 0.500 m Ec 0.429 m Ec

e 8.20 % e e 3.10 % e LN e

PI X= 101,329.566 PI X= 101,352.204 PI X= 101,362.562 PI X= 101,384.430 PI X=

NO. 19 Y= 101,579.856 NO. 20 Y= 101,751.782 NO. 21 Y= 101,864.261 NO. 22 Y= 101,940.157 NO. 23 Y=

STA 2 + 277,460 STA 2 + 450 STA 2 + 562,950 STA 2 + 641,670 STA

Δ 20º12'23" Δ 02º14'21" Δ 10º48'39" Δ 03º34'53" Δ

V 40 Km/Jam V 60 Km/Jam V 60 Km/Jam V 60 Km/Jam V


R 235 m R 1150 m R 470 m R 1103.868 m R

d 173.41 m d 112.955 m d 78.984 m d 85.433 m d

Ls Ls Ls Ls Ls

Lc 43.042 m Lc 44.943 m Lc 88.682 m Lc 68.999 m Lc

Ts Ts Ts Ts Ts

Tc 21.530 m Tc 22.474 m Tc 44.473 m Tc 34.511 m Tc

Es Es Es Es Es

Ec 3.701 m Ec 0.230 m Ec 2.099 m Ec 0.539 m Ec

e 2.40 % e 2.00 % e 4.00 % e 2.00 % e


X= 101,186.581 PI X= 101,257.543

Y= 101,284.690 NO. 18 Y= 101,442.709

1 + 949,450 STA 2 + 122,570

09º42'17" Δ 03º31'23"

60 Km/Jam V 60 Km/Jam

250 m R 700 m

173.221 m d 154.908 m

Ls

42.345 m Lc 43.042 m

Ts

21.223 m Tc 21.530 m

Es

0.899 m Ec 0.331 m

2.40 % e 3.00 %

X= 101,402.908 PI X= 101,419.789

Y= 102,023.568 NO. 24 Y= 102,063.282

2 + 727,080 STA 2 + 770,120

10º32'12" Δ 14º11'45"

40 Km/Jam V 40 Km/Jam
216.94 m R 185.149 m

43.153 m d 258.117 m

Ls

39.895 m Lc 46.061 m

Ts

20.004 m Tc 23.149 m

Es

0.920 m Ec 1.436 m

3.00 % e 3.00 %
PI X= 101,459.421 PI X= 101,489.994 PI X= 101,554.951 PI X=

NO. 25 Y= 102,318.339 NO. 26 Y= 102,432.885 NO. 27 Y= 102,554.064 NO. 28 Y=

STA 3 + 028,000 STA 3 + 146,500 STA 3 + 283,680 STA 1 + 770,45

Δ 06º06'44" Δ 13º14'56" Δ 24º17'12" Δ 02º44'25"

V 60 Km/Jam V 60 Km/Jam V 40 Km/Jam V 40 Km/Jam

R 560 m R 560 m R 145 m R 1500 m

d 118.556 m d 137.491 m d m d 179.014 m

Ls Ls Ls 40 m Ls

Lc 59.74 m Lc 69.371 m Lc 21.643 m Lc 71.740 m

Ts Ts Ts 51.286 m Ts

Tc 29.898 m Tc 34.841 m Tc Tc 35.877 m

Es Es Es 3.791 m Es

Ec 0.795 m Ec 2.016 m Ec Ec 0.429 m

e 3.50 % e 6.00 % e 4.10 % e LN

PI X= PI X= PI X= PI X=

NO. 31 Y= NO. 32 Y= NO. 33 Y= NO. 34 Y=

STA 2 + 277,460 STA 2 + 450 STA 2 + 562,950 STA 2 + 641,670

Δ 20º12'23" Δ 02º14'21" Δ 10º48'39" Δ 03º34'53"

V 60 Km/Jam V 60 Km/Jam V 60 Km/Jam V 60 Km/Jam


R 235 m R 1150 m R 470 m R 1103.868 m

d 173.4 m d 113 m d 78.98 m d 85.441 m

Ls Ls Ls Ls

Lc 43.04 m Lc 44.94 m Lc 88.68 m Lc 68.999 m

Ts Ts Ts Ts

Tc ### m Tc 22.47 m Tc 44.47 m Tc 34.511 m

Es Es Es Es

Ec 3.701 m Ec 0.230 m Ec 2.099 m Ec 0.539 m

e 2.40 % e 2.00 % e 4.00 % e 2.00 %


PI X= PI X=

NO. 29 Y= NO. 30 Y=

STA 1 + 949,450 STA 2 + 122,570

Δ 09º42'17" Δ 03º31'23"

V 40 Km/Jam V 40 Km/Jam

R 250 m R 700 m

d 173.221 m d 154.908 m

Ls Ls

Lc 42.345 m Lc 43.042 m

Ts Ts

Tc 21.223 m Tc 21.530 m

Es Es

Ec 0.899 m Ec 0.331 m

e 2.40 % e 3.00 %

PI X= PI X=

NO. 35 Y= NO. 36 Y=

STA 2 + 727,080 STA 2 + 770,120

Δ 10º32'12" Δ 14º11'45"

V 60 Km/Jam V 60 Km/Jam
R 216.94 m R 185.149 m

d 43.153 m d 258.117 m

Ls Ls

Lc 39.895 m Lc 46.061 m

Ts Ts

Tc 20.004 m Tc 29.898 m

Es Es

Ec 0.920 m Ec 0.795 m

e 3.00 % e 3.50 %
REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
SKNVT. PEMBANGUNAN JALAN DAN JEMBATAN PERBATASA

Paket : Pembangunan Jalan dan Jembatan Malinau - Simanggaris


Kontraktor : PT. PEMBANGUNAN PERUMAHAN, KSO
Dikerjakan Oleh :

PERHITUNGAN POLYGON
SUDUT BIDIK AZIMUTH JARAK (D) DELTA X
NO. PATOK
o ' " o ' " (M') D SIN A

BM. 0
270 55 43.9 12.026
0 + 000 -12.024
278 6 51 9 2 34.9 45.470
PI . 1 7.147
189 14 23 18 16 57.9 95.339
PI . 2 29.908
194 34 38 32 51 35.9 63.106
PI . 3 34.241
205 36 22 58 27 57.9 134.170
PI . 4 114.357
232 2 32 110 30 29.9 182.086
PI . 5 170.546
102 38 43 33 9 12.9 127.829
PI . 6 69.908
184 0 44 37 9 56.9 156.245
PI . 7 94.391
190 8 26 47 18 22.9 121.626
PI . 8 89.394
167 47 38 35 6 0.9 86.051
PI . 9 49.480
220 43 32 75 49 32.9 99.238
PI . 10 96.217
144 53 54 40 43 26.9 59.072
PI . 11 38.540
194 57 0 55 40 26.9 133.903
PI . 12 110.583
213 7 54 88 48 20.9 92.644
PI . 13 92.624
113 30 40 22 19 0.9 176.922
PI . 14 67.182
179 34 59 21 53 59.9 133.370
PI . 15 49.745
175 19 8 17 13 7.9 103.178
PI . 16 30.543
177 15 35 14 28 42.9 179.014
PI . 17 44.757
189 45 17 24 10 59.9 173.221
PI . 18 70.961
183 31 23 27 42 22.9 154.908
PI . 19 72.023
PI . 19 72.023
159 47 41 7 30 3.9 173.410
PI . 20 22.638
177 45 39 5 15 42.9 112.955
PI . 21 10.359
190 48 39 16 4 21.9 78.984
PI . 22 21.867
176 25 7 12 29 28.9 85.433
PI . 23 18.479
190 32 12 23 1 40.9 43.153
PI . 24 16.881
165 48 15 8 49 55.9 258.117
PI . 25 39.632
186 6 44 14 56 39.9 118.556
PI . 26 30.573
193 14 56 28 11 35.9 137.491
PI . 27 64.957
155 42 48 3 54 23.9
PI . 28 0.000
183 25 40 127 5 42

Disetujui Oleh : Diperiksa Oleh :


BINA MARGA KONSULTAN
A
UM
RGA
ERBATASAN KALTIM

Tanggal :
Lokasi :
Halaman :

ON
DELTA Y KOORDINAT
NO. PATOK
D COS A X Y

- - BM. 0

0.195 (12.024) 0.195 0 + 000

44.905 (4.878) 45.100 PI . 1

90.526 25.031 135.626 PI . 2

53.009 59.271 188.635 PI . 3

70.171 173.629 258.806 PI . 4

-63.793 344.174 195.014 PI . 5

107.019 414.082 302.033 PI . 6

124.510 508.473 426.543 PI . 7

82.472 597.867 509.015 PI . 8

70.402 647.347 579.418 PI . 9

24.300 743.564 603.718 PI . 10

44.768 782.104 648.486 PI . 11

75.508 892.687 723.994 PI . 12

1.931 985.311 725.925 PI . 13

163.670 1,052.493 889.595 PI . 14

123.746 1,102.238 1,013.341 PI . 15

98.554 1,132.781 1,111.894 PI . 16

173.329 1,177.538 1,285.223 PI . 17

158.019 1,248.499 1,443.242 PI . 18

137.147 1,320.522 1,580.389 PI . 19


137.147 1,320.522 1,580.389 PI . 19

171.926 1,343.160 1,752.315 PI . 20

112.479 1,353.519 1,864.794 PI . 21

75.897 1,375.386 1,940.690 PI . 22

83.411 1,393.865 2,024.101 PI . 23

39.714 1,410.746 2,063.815 PI . 24

255.056 1,450.377 2,318.872 PI . 25

114.546 1,480.951 2,433.418 PI . 26

121.179 1,545.908 2,554.596 PI . 27

0.000 1,545.908 2,554.596 PI . 28

Dibuat Oleh :
KONTRAKTOR
SKNVT PEMBANGUNAN JALAN DAN JEMBATAN PERBATASAN KALIMANTAN TIMUR
PAKET PEMBANGUNAN JALAN DAN JEMBATAN MALINAU - SIMANGGARIS
Nilai Kontrak : Rp. 123.946.088.131.84

NO
URAIAN PEKERJAAN SATUAN PRAKIRAAN BOBOT TAHUN 2007
MATA
PEMBAY. KUANTITAS (%) DESEMBER JA
3 4 1
I UMUM
1.2 Mobilisasi Ls 1.00 0.8076 0.0596 0.0596 0.0596
1.8 Pemeliharaan dan Pengaturan Lalu Lintas Ls 1.00 0.0861
II DRAINASE
2.1 Pek. Galian utk Selokan, Drainase dan Sal. air M3 9,600.00 0.1470
2.2 Pek. Pasangan batu dengan Mortar M3 4,810.00 2.1627
2.3(4) Gorong-gorong Pipa Baja Bergelombang Ton 22.68 0.4821
2.4(3) Pipa Untuk Pek. Drainase dibawah permukaan M1 252.00 0.0081
III PEKERJAAN TANAH
3.1(1) Galian Tanah Biasa M3 450,160.80 8.2707
3.2(1) Timbunan Biasa M3 49,531.19 1.1033
3.3 Penyiapan Badan Jalan M2 135,314.50 0.2687
3.5(1) Pengadaan & Pemasangan Geotextile M2 1,800.00 0.0243
3.5(2) Pengadaan & Pemasangan Geogrids M2 2,600.00 0.0923
3.5(3) Pengadaan & Pemasangan Erosiaon Control Ma M2 2,600.00 0.0969
IV BAHU JALAN
4.1(2) Lapis Pondasi Agregat Klas B M3 39,600.00 11.0988
V PERKERASAN BERBUTIR
5.1(1) Lapis Pondasi Agregat Klas A M3 59,400.00 16.9431
5.1(2) Lapis Pondasi Agregat Klas B M3 27,062.90 7.6186
VI PERKERASAN ASPAL
6.1(1) Lapis Resap Pengikat Ltr 356,400.00 2.8356

Start 11 Desember 2007


6.3.(7a) Laston Lapis Aus ( AC - WC ) M2 396,000.00 28.6195
Start 11 Desember 2007
VII PEKERJAAN STRUKTUR
7.1(3) Beton K-350 M3 562.00 0.8210
7.1(5) Beton K-250 M3 1,207.00 1.4647
7.1(6) Beton K-175 M3 81.00 0.0771
7.1(7) Beton Siklop K-175 M3 270.00 0.2382
7.1(7)a Pasir Urug untuk Isian Tiang Pancang M3 98.00 0.0138
7.1(8) Beton K-125 M3 146.00 0.1050
7.3(3) Baja Tulangan U32 Ulir Kg 268,538.00 2.4871
7.4(2) Baja Struktur. Titik Leleh 2800 kg / Sm Penye. dan Pemas. Kg 17,400.00 0.3238
7.4(3)a Baja Struktur. Titik Leleh 3500 kg / Sm Penye. dan Pemas. Kg 235,363.00 4.3798
7.4(3)b Baja Struktur. Titik Leleh 3500 kg / Sm Rangka Baja Galvanis Kg 166,398.00 3.1777
7.6(1) Pondasi Cerucuk Penyediaan & Pemasangan M1 22,500.00 0.4573
7.6(8)a Penyediaan Tiang Pancang Baja dia. 400 mm M1 2,220.00 2.4737
7.6(12) Pemancangan Tiang Pancang Pipa Baja Diameter 400 mm M1 2,220.00 0.2822
7.7(2) Penyediaan Dinding sumuran Silinder dia. 300 mm M1 72.00 0.4572
7.7(6) Penurunan Dinding Sumuran Silinder dia. 300 mm M1 72.00 0.0246
7.9 Pasangan Batu M3 2,200.00 1.2939
7.11(13) Rubber Joint M1 108.00 0.1150
7.12(1) Perletakan, Pengadaan dan Pemasangan Elastomer Buah 84.00 0.1428
VIII PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.4(1) Marka Jalan M2 4,920.00 0.4075
8.4(2) Rambu Jalan Buah 26.00 0.0063
8.4(3) Patok Pengarah Buah 860.00 0.0653
8.4(4) Patok Kilometer Buah 83.00 0.0264
8.5(2)2 Pembuatan, Pembongkaran Jembatan Kayu M1 240.00 0.2023
X PEKERJAAN LAIN-LAIN
10.1(2) Pemeliharaan Rutin Perkerasan Ls 1.00 0.1929 0.0060 0.0060 0.0060
10.1(3) Pemeliharaan Rutin Bahu Jalan Pemotongan, Rumput, Semak Ls 1.00 0.0612 0.0019 0.0019 0.0019
10.1(4) Pemeliharaan Rutin Selokan, Sal. Air Galian dan Timbunan Ls 1.00 0.0378 0.0012 0.0012 0.0012

100.0000
Jumlah Bobot Rencana 0.0687 0.0687 0.0687
Akumulasi Bobot Rencana 0 0.0687 0.1374 0.2061
Jumlah Bobot Realisasi
Akumulasi Bobot Realisasi
Deviasi

Disetujui Oleh,
Kepala SNVT Pembangunan Jalan dan Jembatan Perbatasan Kalimantan Timur
Paket Pembangunan Jalan dan Jembatan Malinau - Simanggaris (MYC)

Ir. SUHERIYATNA, MSi


NIP. 110 043 595
TIME SCHEDULE

JANUARI PEBRUARI MARET APRIL


2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1

0.0596 0.0596 0.0596 0.1340 0.1341

0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074


0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081
0.0603 0.0603 0.0603 0.0603 0.0603 0.0603 0.0603
0.0041 0.0041

0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.2297


0.0919
0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075
0.0030 0.0030 0.0030 0.0030 0.0030
0.0115
0.0121
0.1051 0.1051 0.1051 0.1051 0.1051
0.2721 0.2721 0.2721 0.2721 0.2721 0.2721
0.0410
0.0732 0.0732
0.0129 0.0129 0.0129
0.0476 0.0476 0.0476
0.0046
0.0210 0.0210 0.0210
0.1309 0.1309 0.1309 0.1309

0.1524 0.1524 0.1524


0.1092 0.1092 0.1092 0.1092 0.1092
0.0403 0.0403 0.0403
0.0653 0.0653
0.0031
0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404

0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169

0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033
0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
0.0687 0.0687 0.0687 0.1674 0.1675 0.0334 0.0334 0.2191 0.2191 0.2753 0.6998 0.9172 1.0481 1.0215 1.1601 1.5035
0.2747 0.3434 0.4121 0.5795 0.7472 0.7806 0.8140 1.0331 1.2522 1.5275 2.2273 3.1446 4.1927 5.2142 6.3743 7.8778

Diperiks
PT. Indah Karya (

Ir. PRBOWO T
Supervision E
LE

PERIODE PELAKSANAAN

TAHUN 2008
MEI JUNI JULI AGUSTUS SE
2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1

0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074
0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081
0.0603

0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.4297 0.4297 0.4297 0.4297 0.4297
0.0919 0.0919 0.0919 0.0919 0.0919 0.0919 0.0919 0.0919 0.0919 0.0919 0.0919
0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075
0.0030 0.0030 0.0030
0.0115 0.0115 0.0115 0.0115 0.0115 0.0115 0.0115
0.0121 0.0121 0.0121 0.0121 0.0121 0.0121 0.0121
0.1051 0.1051 0.1051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 1.2051 1.2051
0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721

0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418


0.1310 0.1310 0.1031 0.1031 0.1031 0.1031 0.1031 0.1031 1.3310
0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410
0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732
0.0129 0.0129 0.0129
0.0476 0.0476
0.0046 0.0046
0.0210 0.0210
0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309
0.0324 0.0324 0.0324 0.0324 0.0324
0.3650 0.3650 0.3650 0.3650 0.3650 0.3650 0.3650 0.3650 0.3650 0.3650 0.3650 0.3650
0.3178 0.3178 0.3178 0.1178 0.1178 0.3178 0.3178 0.3178 0.5178 0.5178

0.5092 0.5092 0.90921


0.0403 0.0403 0.0403 0.0403
0.0653 0.0653 0.0653 0.0653 0.0653
0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031
0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404

0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033
0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
1.9035 1.8432 2.1700 2.1099 2.3873 2.3220 2.3220 2.3680 2.3680 2.5402 2.5402 2.5651 2.7651 2.7651 2.8473 3.5793
9.7812 11.6244 13.7944 15.9043 18.2916 20.6136 22.9356 25.3037 27.6717 30.2119 32.7520 35.3172 38.0822 40.8473 43.6947 47.2740

Diperiksa Oleh,
h Karya (Persero) & Ass.

BOWO TRILAKSONO
ervision Engineering
KONTRAKTOR : PT. PEMBANGUNAN PERUMAHAN - PT. BUMI KARSA - PT. PERDASA (KSO)
KONSULTAN : PT. INDAH KARYA & Ass.

KETERANGAN
SEPTEMBER OKTOBER NOPEMBER DESEMBER
2 3 4 1 2 3 4 1 2 3 4 1 2

0.0894 0.0894 0.0894

0.4297 0.4297 0.4297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297

0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075


0.8332 0.8332 0.8332 1.2332 1.6332 1.7332 1.5332 1.2332 1.2332

1.2051 1.2051 1.2051 0.9051 0.9051 0.9051 0.7051


0.2721 0.2721 0.2721 0.2721 0.2721 0.2721

Finish 16 Desember 2008


0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418
1.5310 1.9310 3.3310 2.9310 2.8310 2.8310 2.8310 2.5310 1.8310 2.0010 1.8283
Finish 16 Desember 200
0.0410 0.0410 0.0410
0.0732 0.0732

0.0324 0.0324 0.0324 0.0324 0.0324

0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404


0.0288 0.0288 0.0288 0.0288
0.0357 0.0357 0.0357 0.0357

0.0408 0.0408 0.0408 0.0408 0.0408 0.0408 0.0408 0.0408 0.0408 0.0408
0.0016 0.0016 0.0016 0.0016
0.0065 0.0065 0.0065 0.0065 0.0065 0.0065 0.0065 0.0065 0.0065 0.0065
0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026

0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033
0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
3.7793 4.1793 5.5061 5.4482 5.3482 5.3158 5.2437 4.6552 4.0551 4.0267 3.6434 1.3792 0.1459
51.0532 55.2325 60.7386 66.1868 71.5350 76.8508 82.0946 86.7497 90.8049 94.8316 98.4749 99.8541 100.000

Dibuat Oleh,
PT. Pembangunan Perumahan - PT. Bumi Karsa - PT. Perdasa (KSO)

Ir. GIYOKO SURACHMAT


Kuasa (KSO)
SKNVT PEMBANGUNAN JALAN DAN JEMBATAN PERBATASAN KALIMANTAN TIMUR
PAKET PEMBANGUNAN JALAN DAN JEMBATAN MALINAU - SIMANGGARIS
Nilai Kontrak : Rp. 123.946.088.131.84

NO
URAIAN PEKERJAAN SATUAN PRAKIRAAN BOBOT TAHUN 2007
MATA
PEMBAY. KUANTITAS (%) DESEMBER JA
3 4 1
I UMUM
1.2 Mobilisasi Ls 1.00 0.8076 0.0596 0.0596 0.0596
1.8 Pemeliharaan dan Pengaturan Lalu Lintas Ls 1.00 0.0861
II DRAINASE
2.1 Pek. Galian utk Selokan, Drainase dan Sal. air M3 9,600.00 0.1470
2.2 Pek. Pasangan batu dengan Mortar M3 4,810.00 2.1627
2.3(4) Gorong-gorong Pipa Baja Bergelombang Ton 22.68 0.4821
2.4(3) Pipa Untuk Pek. Drainase dibawah permukaan M1 252.00 0.0081
III PEKERJAAN TANAH
3.1(1) Galian Tanah Biasa M3 450,160.80 8.2707
3.2(1) Timbunan Biasa M3 49,531.19 1.1033
3.3 Penyiapan Badan Jalan M2 135,314.50 0.2687
3.5(1) Pengadaan & Pemasangan Geotextile M2 1,800.00 0.0243

mber 2007
3.5(2) Pengadaan & Pemasangan Geogrids M2 2,600.00 0.0923
3.5(3) Pengadaan & Pemasangan Erosiaon Control Ma M2 2,600.00 0.0969
IV BAHU JALAN
Start 11 Desember 2
4.1(2) Lapis Pondasi Agregat Klas B M3 39,600.00 11.0988
V PERKERASAN BERBUTIR
5.1(1) Lapis Pondasi Agregat Klas A M3 59,400.00 16.9431
5.1(2) Lapis Pondasi Agregat Klas B M3 27,062.90 7.6186
VI PERKERASAN ASPAL
6.1(1) Lapis Resap Pengikat Ltr 356,400.00 2.8356
6.3.(7a) Laston Lapis Aus ( AC - WC ) M2 396,000.00 28.6195
VII PEKERJAAN STRUKTUR
7.9 Pasangan Batu M3 2,200.00 1.2939
VIII PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.4(1) Marka Jalan M2 4,920.00 0.4075
8.4(2) Rambu Jalan Buah 26.00 0.0063
8.4(3) Patok Pengarah Buah 860.00 0.0653
8.4(4) Patok Kilometer Buah 83.00 0.0264
8.5(2)2 Pembuatan, Pembongkaran Jembatan Kayu M1 240.00 0.2023
X PEKERJAAN LAIN-LAIN
10.1(2) Pemeliharaan Rutin Perkerasan Ls 1.00 0.1929 0.0060 0.0060 0.0060
10.1(3) Pemeliharaan Rutin Bahu Jalan Pemotongan, Rumput, Semak Ls 1.00 0.0612 0.0019 0.0019 0.0019
10.1(4) Pemeliharaan Rutin Selokan, Sal. Air Galian dan Timbunan Ls 1.00 0.0378 0.0012 0.0012 0.0012

82.9590
TIME SCHEDULE
JALAN

JANUARI PEBRUARI MARET APRIL


2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1

0.0596 0.0596 0.0596 0.1340 0.1341

0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074


0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081
0.0603 0.0603 0.0603 0.0603 0.0603 0.0603 0.0603
0.0041 0.0041

0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.2297


0.0919
0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075
0.0030 0.0030 0.0030 0.0030 0.0030
0.0115
0.0121
0.1051 0.1051 0.1051 0.1051 0.1051
0.2721 0.2721 0.2721 0.2721 0.2721 0.2721

0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404

0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169

0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033
0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
LE

PERIODE PELAKSANAAN

TAHUN 2008
MEI JUNI JULI AGUSTUS SE
2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1

0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074
0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081
0.0603

0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.4297 0.4297 0.4297 0.4297 0.4297
0.0919 0.0919 0.0919 0.0919 0.0919 0.0919 0.0919 0.0919 0.0919 0.0919 0.0919
0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075
0.0030 0.0030 0.0030
0.0115 0.0115 0.0115 0.0115 0.0115 0.0115 0.0115
0.0121 0.0121 0.0121 0.0121 0.0121 0.0121 0.0121
0.1051 0.1051 0.1051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 1.2051 1.2051
0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721

0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418


0.1310 0.1310 0.1031 0.1031 0.1031 0.1031 0.1031 0.1031 1.3310

0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404

0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033
0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
KONTRAKTOR : PT. PEMBANGUNAN PERUMAHAN - PT. BUMI KARSA - PT. PERDASA (KSO)
KONSULTAN : PT. INDAH KARYA & Ass.

KETERANGAN
SEPTEMBER OKTOBER NOPEMBER DESEMBER
2 3 4 1 2 3 4 1 2 3 4 1 2

0.0894 0.0894 0.0894

0.4297 0.4297 0.4297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297

0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075

mber 2008
Finish 16 Desember
0.8332 0.8332 0.8332 1.2332 1.6332 1.7332 1.5332 1.2332 1.2332

1.2051 1.2051 1.2051 0.9051 0.9051 0.9051 0.7051


0.2721 0.2721 0.2721 0.2721 0.2721 0.2721

0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418
1.5310 1.9310 3.3310 2.9310 2.8310 2.8310 2.8310 2.5310 1.8310 2.0010 1.8283

0.0404 0.0404 0.0404 0.0404 0.0404 0.0404 0.0404

0.0408 0.0408 0.0408 0.0408 0.0408 0.0408 0.0408 0.0408 0.0408 0.0408
0.0016 0.0016 0.0016 0.0016
0.0065 0.0065 0.0065 0.0065 0.0065 0.0065 0.0065 0.0065 0.0065 0.0065
0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026

0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033
0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
SKNVT PEMBANGUNAN JALAN DAN JEMBATAN PERBATASAN KALIMANTAN TIMUR
PAKET PEMBANGUNAN JALAN DAN JEMBATAN MALINAU - SIMANGGARIS
Nilai Kontrak : Rp. 123.946.088.131.84

NO
URAIAN PEKERJAAN SATUAN PRAKIRAAN BOBOT TAHUN 2007
MATA
PEMBAY. KUANTITAS (%) DESEMBER JA
3 4 1
I UMUM
1.2 Mobilisasi Ls 1.00 0.8076 0.0734 0.0734 0.0734
1.8 Pemeliharaan dan Pengaturan Lalu Lintas Ls 1.00 0.0861 0.0018 0.0018 0.0018
II DRAINASE
2.1 Pek. Galian utk Selokan, Drainase dan Sal. air M3 9,600.00 0.1470
2.2 Pek. Pasangan batu dengan Mortar M3 4,810.00 2.1627
2.3(4) Gorong-gorong Pipa Baja Bergelombang Ton 22.68 0.4821
2.4(3) Pipa Untuk Pek. Drainase dibawah permukaan M1 252.00 0.0081
III PEKERJAAN TANAH
3.1(1) Galian Tanah Biasa M3 450,160.80 8.2707
3.2(1) Timbunan Biasa M3 49,531.19 1.1033
3.3 Penyiapan Badan Jalan M2 135,314.50 0.2687
3.5(1) Pengadaan & Pemasangan Geotextile M2 1,800.00 0.0243

Desember 2007
3.5(2) Pengadaan & Pemasangan Geogrids M2 2,600.00 0.0923
3.5(3) Pengadaan & Pemasangan Erosiaon Control Ma M2 2,600.00 0.0969
IV BAHU JALAN
4.1(2) Lapis Pondasi Agregat Klas B M3 39,600.00 11.0988
V PERKERASAN BERBUTIR
5.1(1) Lapis Pondasi Agregat Klas A M3 59,400.00 16.9431
Start 11 Dese
5.1(2) Lapis Pondasi Agregat Klas B M3 27,062.90 7.6186
VI PERKERASAN ASPAL
6.1(1) Lapis Resap Pengikat Ltr 356,400.00 2.8356
6.3.(7a) Laston Lapis Aus ( AC - WC ) M2 396,000.00 28.6195
Start
VII PEKERJAAN STRUKTUR
7.9 Pasangan Batu M3 733.33 0.4313
VIII PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.4(1) Marka Jalan M2 4,920.00 0.4075
8.4(2) Rambu Jalan Buah 26.00 0.0063
8.4(3) Patok Pengarah Buah 860.00 0.0653
8.4(4) Patok Kilometer Buah 83.00 0.0264
8.5(2)2 Pembuatan, Pembongkaran Jembatan Kayu M1 240.00 0.2023
X PEKERJAAN LAIN-LAIN
10.1(2) Pemeliharaan Rutin Perkerasan Ls 1.00 0.1929 0.0060 0.0060 0.0060
10.1(3) Pemeliharaan Rutin Bahu Jalan Pemotongan, Rumput, Semak Ls 1.00 0.0612 0.0019 0.0019 0.0019
10.1(4) Pemeliharaan Rutin Selokan, Sal. Air Galian dan Timbunan Ls 1.00 0.0378 0.0012 0.0012 0.0012

82.0964

Jumlah Bobot Rencana 0.0843 0.0843 0.0843

Akumulasi Bobot Rencana 0 0.0843 0.1686 0.2529

Jumlah Bobot Realisasi


Akumulasi Bobot Realisasi
Deviasi

Disetujui Oleh,
Kepala SNVT Pembangunan Jalan dan Jembatan Perbatasan Kalimantan Timur
Paket Pembangunan Jalan dan Jembatan Malinau - Simanggaris (MYC)
Ir. SUHERIYATNA, MSi
NIP. 110 043 595
TIME SCHEDULE
JALAN

JANUARI PEBRUARI MARET APRIL


2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1

0.0734 0.0734 0.0734 0.0734 0.0734


0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018

0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074


0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081
0.0603 0.0603 0.0603 0.0603 0.0603 0.0603 0.0603
0.0041 0.0041

0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.2297


0.0919
0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075
0.0030 0.0030 0.0030 0.0030 0.0030
0.0115
0.0121

0.1051 0.1051 0.1051 0.1051 0.1051


0.2721 0.2721 0.2721 0.2721 0.2721 0.2721
0.0216 0.0216 0.0216 0.0216 0.0216 0.0216 0.0216

0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169 0.0169

0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033
0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007

0.0843 0.0843 0.0843 0.1086 0.1086 0.0352 0.0352 0.1804 0.1804 0.2583 0.5303 0.6385 0.6385 0.6425 0.6425 0.9372

0.3372 0.4215 0.5057 0.6144 0.7230 0.7582 0.7934 0.9738 1.1542 1.4125 1.9428 2.5813 3.2199 3.8624 4.5049 5.4421

Diperiks
PT. Indah Karya (
Ir. PRBOWO T
Supervision E
LE
PERIODE PELAKSANAAN

TAHUN 2008
MEI JUNI JULI AGUSTUS SE
2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1

0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018

0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074
0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081 0.1081
0.0603

0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.4297 0.4297 0.4297 0.4297 0.4297
0.0919 0.0919 0.0919 0.0919 0.0919 0.0919 0.0919 0.0919 0.0919 0.0919 0.0919
0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075
0.0030 0.0030 0.0030
0.0115 0.0115 0.0115 0.0115 0.0115 0.0115 0.0115
0.0121 0.0121 0.0121 0.0121 0.0121 0.0121 0.0121

0.1051 0.1051 0.1051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 0.6051 1.2051 1.2051
0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721 0.2721

0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418


0.1310 0.1310 0.1031 0.1031 0.1031 0.1031 0.1031 0.1031 1.3310
0.0216 0.0216 0.0216 0.0216 0.0216 0.0216 0.0216 0.0216 0.0216 0.0216 0.0216 0.0216 0.0216

0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033
0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007

0.9372 0.8770 0.8770 1.3739 1.3739 1.3739 1.3739 1.6231 1.6231 1.5952 1.5952 1.5877 1.5877 1.5662 2.1662 3.3941

6.3793 7.2563 8.1332 9.5071 10.8811 12.2550 13.6289 15.2520 16.8750 18.4702 20.0653 21.6530 23.2407 24.8069 26.9730 30.3671

Diperiksa Oleh,
Karya (Persero) & Ass.
BOWO TRILAKSONO
ervision Engineering
KONTRAKTOR : PT. PEMBANGUNAN PERUMAHAN - PT. BUMI KARSA - PT. PERDASA (KSO)
KONSULTAN : PT. INDAH KARYA & Ass.

KETERANGAN
SEPTEMBER OKTOBER NOPEMBER DESEMBER
2 3 4 1 2 3 4 1 2 3 4 1 2

0.0734 0.0734 0.0734


0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018

0.4297 0.4297 0.4297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297 0.2297

0.0075 0.0075 0.0075 0.0075 0.0075 0.0075 0.0075

Desember 2008
0.8332 0.8332 0.8332 1.2332 1.6332 1.7332 1.5332 1.2332 1.2332

1.2051 1.2051 1.2051 0.9051 0.9051 0.9051 0.7051


Finish 16 Dese
0.2721 0.2721 0.2721 0.2721 0.2721 0.2721

0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418 0.1418
1.5310 1.9310 3.3310 2.9310 2.8310 2.8310 2.8310 2.5310 1.8310 2.0010 1.8283
Finish
0.0408 0.0408 0.0408 0.0408 0.0408 0.0408 0.0408 0.0408 0.0408 0.0408
0.0016 0.0016 0.0016 0.0016
0.0065 0.0065 0.0065 0.0065 0.0065 0.0065 0.0065 0.0065 0.0065 0.0065
0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026

0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033
0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007

3.5941 3.9941 5.3941 5.3772 5.2772 5.2772 5.2051 4.5925 3.9925 3.9640 3.5647 1.3650 0.1318

33.9612 37.9552 43.3493 48.7264 54.0036 59.2808 64.4859 69.0784 73.0709 77.0349 80.5996 81.9646 82.0964

Dibuat Oleh,
PT. Pembangunan Perumahan - PT. Bumi Karsa - PT. Perdasa (KSO)
Ir. GIYOKO SURACHMAT
Kuasa (KSO)
SKNVT PEMBANGUNAN JALAN DAN JEMBATAN PERBATASAN KALIMANTAN TIMUR
PAKET PEMBANGUNAN JALAN DAN JEMBATAN MALINAU - SIMANGGARIS
Nilai Kontrak : Rp. 123.946.088.131.84

NO
URAIAN PEKERJAAN SATUAN PRAKIRAAN BOBOT TAHUN 2007
MATA
PEMBAY. KUANTITAS (%) DESEMBER JA
3 4 1
VII PEKERJAAN STRUKTUR
7.1(3) Beton K-350 M3 562.00 0.8210
7.1(5) Beton K-250 M3 1,207.00 1.4647
7.1(6) Beton K-175 M3 81.00 0.0771
7.1(7) Beton Siklop K-175 M3 270.00 0.2382
7.1(7)a Pasir Urug untuk Isian Tiang Pancang M3 98.00 0.0138
7.1(8) Beton K-125 M3 146.00 0.1050
7.3(3) Baja Tulangan U32 Ulir Kg 268,538.00 2.4871
7.4(2) Baja Struktur. Titik Leleh 2800 kg / Sm Penye. dan Pemas. Kg 17,400.00 0.3238
7.4(3)a Baja Struktur. Titik Leleh 3500 kg / Sm Penye. dan Pemas. Kg 235,363.00 4.3798
7.4(3)b Baja Struktur. Titik Leleh 3500 kg / Sm Rangka Baja Galvanis Kg 166,398.00 3.1777
7.6(1) Pondasi Cerucuk Penyediaan & Pemasangan M1 22,500.00 0.4573
7.6(8)a Penyediaan Tiang Pancang Baja dia. 400 mm M1 2,220.00 2.4737
7.6(12) Pemancangan Tiang Pancang Pipa Baja Diameter 400 mm M1 2,220.00 0.2822
7.7(2) Penyediaan Dinding sumuran Silinder dia. 300 mm M1 72.00 0.4572
7.7(6) Penurunan Dinding Sumuran Silinder dia. 300 mm M1 72.00 0.0246
7.9 Pasangan Batu M3 1,466.67 0.8626
7.11(13) Rubber Joint M1 108.00 0.1150
7.12(1) Perletakan, Pengadaan dan Pemasangan Elastomer Buah 84.00 0.1428

17.9036

Jumlah Bobot Rencana - - -


Akumulasi Bobot Rencana 0 - - -
Jumlah Bobot Realisasi
Akumulasi Bobot Realisasi
Deviasi

Disetujui Oleh,
Kepala SNVT Pembangunan Jalan dan Jembatan Perbatasan Kalimantan Timur
Paket Pembangunan Jalan dan Jembatan Malinau - Simanggaris (MYC)

Ir. SUHERIYATNA, MSi


NIP. 110 043 595
TIME SCHEDULE
JEMBATAN

JANUARI PEBRUARI MARET APRIL


2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1

0.0410
0.0732 0.0732
0.0129 0.0129 0.0129
0.0476 0.0476 0.0476
0.0046
0.0210 0.0210 0.0210
0.1309 0.1309 0.1309 0.1309

0.1524 0.1524 0.1524


0.1092 0.1092 0.1092 0.1092 0.1092
0.0403 0.0403 0.0403
0.0653 0.0653
0.0031
0.0270 0.0270 0.0270 0.0270 0.0270 0.0270 0.0270 0.0270 0.0270

- - - - - - - 0.0270 0.0270 0.0270 0.1794 0.2886 0.4195 0.3889 0.5274 0.5761


- - - - - - - 0.0270 0.0539 0.0809 0.2603 0.5488 0.9683 1.3572 1.8846 2.4608

Diperiks
PT. Indah Karya (

Ir. PRABOWO T
Supervision E
LE

PERIODE PELAKSANAAN

TAHUN 2008
MEI JUNI JULI AGUSTUS SE
2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1

0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410 0.0410
0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732 0.0732
0.0129 0.0129 0.0129
0.0476 0.0476
0.0046 0.0046
0.0210 0.0210
0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309 0.1309
0.0324 0.0324 0.0324 0.0324 0.0324
0.3650 0.3650 0.3650 0.3650 0.3650 0.3650 0.3650 0.3650 0.3650 0.3650 0.3650 0.3650
0.3178 0.3178 0.3178 0.1178 0.1178 0.3178 0.3178 0.3178 0.5178 0.5178

0.5092 0.5092 0.90921


0.0403 0.0403 0.0403 0.0403
0.0653 0.0653 0.0653 0.0653 0.0653
0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031
0.0270 0.0270 0.0270 0.0270 0.0270 0.0270 0.0270 0.0270 0.0270 0.0270 0.0270 0.0270 0.0270 0.0270 0.0270 0.0270

0.9761 0.9761 1.3029 0.7458 1.0233 0.9580 0.9580 0.7549 0.7549 0.9549 0.9549 0.9873 1.1873 1.1873 0.6695 0.1735
3.4369 4.4131 5.7160 6.4618 7.4851 8.4431 9.4010 10.1559 10.9108 11.8657 12.8206 13.8079 14.9951 16.1824 16.8519 17.0254

Diperiksa Oleh,
h Karya (Persero) & Ass.

BOWO TRILAKSONO
ervision Engineering
KONTRAKTOR : PT. PEMBANGUNAN PERUMAHAN - PT. BUMI KARSA - PT. PERDASA (KSO)
KONSULTAN : PT. INDAH KARYA & Ass.

KETERANGAN
SEPTEMBER OKTOBER NOPEMBER DESEMBER
2 3 4 1 2 3 4 1 2 3 4 1 2

0.0410 0.0410 0.0410


0.0732 0.0732

0.0324 0.0324 0.0324 0.0324 0.0324


0.0270 0.0270 0.0270 0.0270 0.0270 0.0270 0.0270
0.0288 0.0288 0.0288 0.0288
0.0357 0.0357 0.0357 0.0357

0.1735 0.1735 0.1004 0.0593 0.0593 0.0270 0.0270 0.0644 0.0644 0.0644 0.0644 - -
17.1989 17.3725 17.4729 17.5322 17.5915 17.6185 17.6454 17.7099 17.7743 17.8388 17.9032 17.9032 17.903

Dibuat Oleh,
PT. Pembangunan Perumahan - PT. Bumi Karsa - PT. Perdasa (KSO)

Ir. GIYOKO SURACHMAT


Kuasa (KSO)
SKNVT PEMBANGUNAN JALAN DAN JEMBATAN PERBATASAN KALIMANTAN TIMUR
PAKET PEMBANGUNAN JALAN DAN JEMBATAN MALINAU - SIMANGGARIS
Nilai Kontrak : Rp. 123.946.088.131.84

NO
URAIAN PEKERJAAN SATUAN PRAKIRAAN BOBOT TAHUN 2007
MATA
PEMBAY. KUANTITAS (%) DESEMBER JA
3 4 1
I UMUM
1.2 Mobilisasi Ls 1.00 0.9837 0.0894 0.0894 0.0894
1.8 Pemeliharaan dan Pengaturan Lalu Lintas Ls 1.00 0.1049 0.0022 0.0022 0.0022
II DRAINASE
2.1 Pek. Galian utk Selokan, Drainase dan Sal. air M3 9,600.00 0.1791
2.2 Pek. Pasangan batu dengan Mortar M3 4,810.00 2.6343
2.3(4) Gorong-gorong Pipa Baja Bergelombang Ton 22.68 0.5872
2.4(3) Pipa Untuk Pek. Drainase dibawah permukaan M1 252.00 0.0099
III PEKERJAAN TANAH
3.1(1) Galian Tanah Biasa M3 450,160.80 10.0743
3.2(1) Timbunan Biasa M3 49,531.19 1.3440
3.3 Penyiapan Badan Jalan M2 135,314.50 0.3273
3.5(1) Pengadaan & Pemasangan Geotextile M2 1,800.00 0.0296

Desember 2007
3.5(2) Pengadaan & Pemasangan Geogrids M2 2,600.00 0.1124
3.5(3) Pengadaan & Pemasangan Erosiaon Control Ma M2 2,600.00 0.1180
IV BAHU JALAN
4.1(2) Lapis Pondasi Agregat Klas B M3 39,600.00 13.5193
V PERKERASAN BERBUTIR
5.1(1) Lapis Pondasi Agregat Klas A M3 59,400.00 20.6380
Start 11 Dese
5.1(2) Lapis Pondasi Agregat Klas B M3 27,062.90 9.2801
VI PERKERASAN ASPAL
6.1(1) Lapis Resap Pengikat Ltr 356,400.00 3.4540
6.3.(7a) Laston Lapis Aus ( AC - WC ) M2 396,000.00 34.8608
Start
VII PEKERJAAN STRUKTUR
7.9 Pasangan Batu M3 733.33 0.5254
VIII PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.4(1) Marka Jalan M2 4,920.00 0.4964
8.4(2) Rambu Jalan Buah 26.00 0.0076
8.4(3) Patok Pengarah Buah 860.00 0.0795
8.4(4) Patok Kilometer Buah 83.00 0.0322
8.5(2)2 Pembuatan, Pembongkaran Jembatan Kayu M1 240.00 0.2465
X PEKERJAAN LAIN-LAIN
10.1(2) Pemeliharaan Rutin Perkerasan Ls 1.00 0.2350 0.0060 0.0060 0.0060
10.1(3) Pemeliharaan Rutin Bahu Jalan Pemotongan, Rumput, Semak Ls 1.00 0.0745 0.0019 0.0019 0.0019
10.1(4) Pemeliharaan Rutin Selokan, Sal. Air Galian dan Timbunan Ls 1.00 0.0460 0.0012 0.0012 0.0012

100.0000

Jumlah Bobot Rencana 0.1007 0.1007 0.1007

Akumulasi Bobot Rencana 0 0.1007 0.2014 0.3021

Jumlah Bobot Realisasi


Akumulasi Bobot Realisasi
Deviasi

Disetujui Oleh,
Kepala SNVT Pembangunan Jalan dan Jembatan Perbatasan Kalimantan Timur
Paket Pembangunan Jalan dan Jembatan Malinau - Simanggaris (MYC)
Ir. SUHERIYATNA, MSi
NIP. 110 043 595
TIME SCHEDULE
JALAN

JANUARI PEBRUARI MARET APRIL


2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1

0.0894 0.0894 0.0894 0.0894 0.0894


0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022

0.0090 0.0090 0.0090 0.0090 0.0090 0.0090 0.0090 0.0090 0.0090


0.1317 0.1317 0.1317 0.1317 0.1317 0.1317 0.1317 0.1317 0.1317
0.0734 0.0734 0.0734 0.0734 0.0734 0.0734 0.0734
0.0049 0.0049

0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.2798


0.1120
0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091
0.0037 0.0037 0.0037 0.0037 0.0037
0.0141
0.0148

0.7371 0.7371 0.7371 0.7371 0.7371


0.3314 0.3314 0.3314 0.3314 0.3314 0.3314
0.0263 0.0263 0.0263 0.0263 0.0263 0.0263 0.0263

0.0205 0.0205 0.0205 0.0205 0.0205 0.0205 0.0205 0.0205 0.0205 0.0205 0.0205 0.0205

0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045
0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014
0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009

0.1007 0.1007 0.1007 0.1303 0.1303 0.0409 0.0409 0.2113 0.2113 0.3087 0.6402 1.3810 1.3810 1.3859 1.3859 1.7513

0.4028 0.5035 0.6042 0.7345 0.8648 0.9057 0.9466 1.1579 1.3692 1.6780 2.3181 3.6991 5.0800 6.4660 7.8519 9.6032

Diperiks
PT. Indah Karya (
Ir. PRBOWO T
Supervision E
LE
PERIODE PELAKSANAAN

TAHUN 2008
MEI JUNI JULI AGUSTUS SE
2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1

0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022

0.0090 0.0090 0.0090 0.0090 0.0090 0.0090 0.0090 0.0090 0.0090 0.0090 0.0090
0.1317 0.1317 0.1317 0.1317 0.1317 0.1317 0.1317 0.1317 0.1317 0.1317 0.1317
0.0734

0.2798 0.2798 0.2798 0.2798 0.2798 0.2798 0.2798 0.2798 0.2798 0.2798 0.2798 0.4297 0.4297 0.4297 0.4297 0.4297
0.1120 0.1120 0.1120 0.1120 0.1120 0.1120 0.1120 0.1120 0.1120 0.1120 0.1120
0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091
0.0037 0.0037 0.0037
0.0141 0.0141 0.0141 0.0141 0.0141 0.0141 0.0141
0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148

0.7371 0.7371 0.7371 0.7371 0.7370727 0.7370727 0.7370727 0.7370727 0.7370727 0.7370727 0.7370727 0.7370727 0.7370727 0.7370727 0.7370727 0.7370727
0.3314 0.3314 0.3314 0.3314 0.3314 0.3314 0.3314 0.3314 0.3314 0.3314 0.3314 0.3314 0.3314 0.3314 0.3314 0.3314

0.1727 0.1727 0.1727 0.1727 0.1727 0.1727 0.1727 0.1727 0.1727


0.1310 0.1310 0.1031 0.1031 0.1031 0.1031 0.1031 0.1031 1.3310
0.0263 0.0263 0.0263 0.0263 0.0263 0.0263 0.0263 0.0263 0.0263 0.0263 0.0263 0.0263 0.0263

0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045
0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014
0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009

1.7513 1.6779 1.6779 1.6742 1.6742 1.6742 1.6742 1.9491 1.9491 1.9212 1.9212 1.8184 1.8184 1.7922 1.7922 3.0201

11.3545 13.0324 14.7103 16.3845 18.0587 19.7330 21.4072 23.3563 25.3054 27.2266 29.1478 30.9662 32.7847 34.5769 36.3690 39.3891

Diperiksa Oleh,
Karya (Persero) & Ass.
BOWO TRILAKSONO
ervision Engineering
KONTRAKTOR : PT. PEMBANGUNAN PERUMAHAN - PT. BUMI KARSA - PT. PERDASA (KSO)
KONSULTAN : PT. INDAH KARYA & Ass.

KETERANGAN
SEPTEMBER OKTOBER NOPEMBER DESEMBER
2 3 4 1 2 3 4 1 2 3 4 1 2

0.0894 0.0894 0.0894


0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022

0.4297 0.4297 0.4297 0.3800 0.3800 0.3800 0.3800 0.3800 0.3800 0.3800 0.3800

0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091

Desember 2008
1.5021 1.5021 1.5021 1.5021 1.5021 1.5021 1.5021 1.5021 1.5021
.
0.7370727 0.7370727 0.7370727 0.7370727 0.7370727 0.7370727 0.7370727
Finish 16 Dese
0.3314 0.3314 0.3314 0.3314 0.3314 0.3314

0.1727 0.1727 0.1727 0.1727 0.1727 0.1727 0.1727 0.1727 0.1727 0.1727 0.1727
1.5310 1.9310 3.3310 3.7111 3.6111 3.6111 3.6111 3.3111 2.6111 2.7811 2.6084
Finish
0.0496 0.0496 0.0496 0.0496 0.0496 0.0496 0.0496 0.0496 0.0496 0.0496
0.0019 0.0019 0.0019 0.0019
0.0079 0.0079 0.0079 0.0079 0.0079 0.0079 0.0079 0.0079 0.0079 0.0079
0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032

0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045
0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014
0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009

3.2201 3.6201 5.0201 6.9134 6.8134 6.8134 6.4820 5.4358 4.7358 4.9078 4.8244 1.6633 0.1612

42.6092 46.2292 51.2493 58.1627 64.9762 71.7896 78.2716 83.7075 88.4433 93.3511 98.1755 99.8388 100.000

Dibuat Oleh,
PT. Pembangunan Perumahan - PT. Bumi Karsa - PT. Perdasa (KSO)
Ir. GIYOKO SURACHMAT
Kuasa (KSO)
SKNVT PEMBANGUNAN JALAN DAN JEMBATAN PERBATASAN KALIMANTAN TIMUR
PAKET PEMBANGUNAN JALAN DAN JEMBATAN MALINAU - SIMANGGARIS
Nilai Kontrak : Rp. 123.946.088.131.84

NO
URAIAN PEKERJAAN SATUAN PRAKIRAAN BOBOT
MATA
PEMBAY. KUANTITAS (%) MARET APRIL
4 1 2 3
VII PEKERJAAN STRUKTUR
7.1(3) Beton K-350 M3 562.00 4.5855
7.1(5) Beton K-250 M3 1,207.00 8.1811
7.1(6) Beton K-175 M3 81.00 0.4308 0.0718
7.1(7) Beton Siklop K-175 M3 270.00 1.3304 0.2661
7.1(7)a Pasir Urug untuk Isian Tiang Pancang M3 98.00 0.0770
7.1(8) Beton K-125 M3 146.00 0.5865 0.1173
7.3(3) Baja Tulangan U32 Ulir Kg 268,538.00 13.8914 0.7311 0.7311
7.4(2) Baja Struktur. Titik Leleh 2800 kg / Sm Penye. dan Pemas. Kg 17,400.00 1.8085
7.4(3)a Baja Struktur. Titik Leleh 3500 kg / Sm Penye. dan Pemas. Kg 235,363.00 24.4635
7.4(3)b Baja Struktur. Titik Leleh 3500 kg / Sm Rangka Baja Galvanis Kg 166,398.00 17.7490
7.6(1) Pondasi Cerucuk Penyediaan & Pemasangan M1 22,500.00 2.5541 0.8514 0.8514 0.8514
7.6(8)a Penyediaan Tiang Pancang Baja dia. 400 mm M1 2,220.00 13.8170 1.7271 1.7271 1.7271
7.6(12) Pemancangan Tiang Pancang Pipa Baja Diameter 400 mm M1 2,220.00 1.5762 0.2252
7.7(2) Penyediaan Dinding sumuran Silinder dia. 300 mm M1 72.00 2.5537
7.7(6) Penurunan Dinding Sumuran Silinder dia. 300 mm M1 72.00 0.1372
7.9 Pasangan Batu M3 1,466.67 4.8182
7.11(13) Rubber Joint M1 108.00 0.6424
7.12(1) Perletakan, Pengadaan dan Pemasangan Elastomer Buah 84.00 0.7974
100.0000

Jumlah Bobot Rencana 0.8514 2.5785 3.3096 3.1386


Akumulasi Bobot Rencana 0.8514 3.4299 6.7395 9.8781
Jumlah Bobot Realisasi
Akumulasi Bobot Realisasi
Deviasi

Disetujui Oleh,
Kepala SNVT Pembangunan Jalan dan Jembatan Perbatasan Kalimantan Timur
Paket Pembangunan Jalan dan Jembatan Malinau - Simanggaris (MYC)

Ir. SUHERIYATNA, MSi


NIP. 110 043 595
TIME SCHEDULE
JEMBATAN

PERIODE PELAKSANAAN

TAHUN 2008
MEI JUNI JULI AGUSTUS
4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3

0.2293 0.2293 0.2293 0.2293 0.2293 0.2293 0.2293 0.2293 0.2293 0.2293 0.2293 0.2293 0.2293 0.2293 0.2293
0.4091 0.4091 0.4091 0.4091 0.4091 0.4091 0.4091 0.4091 0.4091 0.4091 0.4091 0.4091 0.4091 0.4091 0.4091 0.4091
0.0718 0.0718 0.0718 0.0718 0.0718
0.2661 0.2661 0.2661 0.2661
0.0257 0.0257 0.0257
0.1173 0.1173 0.1173 0.1173
0.7311 0.7311 0.7311 0.7311 0.7311 0.7311 0.7311 0.7311 0.7311 0.7311 0.7311 0.7311 0.7311 0.7311 0.7311 0.7311
0.1809 0.1809 0.1809
2.0386 2.0386 2.0386 2.0386 2.0386 2.0386 2.0386 2.0386 2.0386 2.0386 2.0386
1.7749 1.7749 1.7749 1.7749 1.7749 1.7749 1.7749 1.7749 1.7749 1.7749

1.7271 1.7271 1.7271 1.7271 1.72712


0.2252 0.2252 0.2252 0.2252 0.2252 0.2252
0.3648 0.3648 0.3648 0.3648 0.3648 0.3648 0.3648
0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171
0.2190 0.2190 0.2190 0.2190 0.2190 0.2190 0.2190 0.2190 0.2190 0.2190 0.2190 0.2190 0.2190
3.9125 4.1846 4.1846 4.4036 3.9945 4.2342 5.7839 5.4191 5.4191 5.4020 5.4020 5.4020 5.4020 5.5828 5.5828 5.5828
13.7906 17.9751 22.1597 26.5633 30.5578 34.7921 40.5760 45.9951 51.4143 56.8163 62.2183 67.6202 73.0222 78.6051 84.1879 89.7708

Diperiksa Oleh,
PT. Indah Karya (Persero) & Ass.

Ir. PRBOWO TRILAKSONO


Supervision Engineering
KONTRAKTOR : PT. PEMBANGUNAN PERUMAHAN - PT. BUMI KARSA - PT. PERDASA (KSO
KONSULTAN : PT. INDAH KARYA & Ass.

KETERANGAN
SEPTEMBER OKTOBER NOPEMBER
4 1 2 3 4 1 2 3 4 1 2 3 4

0.2293 0.2293 0.2293 0.2293 0.2293


0.4091 0.4091 0.4091 0.4091

0.7311
0.1809 0.1809 0.1809 0.1809 0.1809 0.1809 0.1809
2.0386

0.2190 0.2190 0.2190 0.2190 0.2190 0.2190 0.2190 0.2190 0.2190


0.1606 0.1606 0.1606 0.1606
0.1993 0.1993 0.1993 0.1993
3.8079 1.0382 1.0382 1.0382 0.6291 0.3999 0.3999 0.2190 0.2190 0.3600 0.3600 0.3600 0.3600
93.5787 94.6169 95.6551 96.6933 97.3224 97.7223 98.1222 98.3412 98.5602 98.9201 99.2801 99.6400 100.000

Dibuat Oleh,
PT. Pembangunan Perumahan - PT. Bumi Karsa - PT. Perdasa (KSO)

Ir. GIYOKO SURACHMAT


Kuasa (KSO)
SKNVT PEMBANGUNAN JALAN DAN JEMBATAN PERBATASAN KALIMANTAN TIMUR
PAKET PEMBANGUNAN JALAN DAN JEMBATAN MALINAU - SIMANGGARIS
Nilai Kontrak : Rp. 123.946.088.131.84

NO
URAIAN PEKERJAAN SATUAN PRAKIRAAN BOBOT TAHUN 2007
MATA
PEMBAY. KUANTITAS (%) DESEMBER JA
3 4 1
I UMUM
1.2 Mobilisasi Ls 0.85 0.8401 0.0764 0.0764 0.0764
1.8 Pemeliharaan dan Pengaturan Lalu Lintas Ls 0.85 0.0896 0.0019 0.0019 0.0019
II DRAINASE
2.1 Pek. Galian utk Selokan, Drainase dan Sal. air M3 9,600.00 0.1799
2.2 Pek. Pasangan batu dengan Mortar M3 4,810.00 2.6468
2.3(4) Gorong-gorong Pipa Baja Bergelombang Ton 22.68 0.5900
III PEKERJAAN TANAH
3.1(1) Galian Tanah Biasa M3 450,160.80 10.1218
3.2(1) Timbunan Biasa M3 49,531.19 1.3503
3.3 Penyiapan Badan Jalan M2 135,314.50 0.3288
3.5(1) Pengadaan & Pemasangan Geotextile M2 1,800.00 0.0298

11 Desember 2007
3.5(2) Pengadaan & Pemasangan Geogrids M2 2,600.00 0.1130
3.5(3) Pengadaan & Pemasangan Erosiaon Control Ma M2 2,600.00 0.1186
IV BAHU JALAN
4.1(2) Lapis Pondasi Agregat Klas B M3 39,600.00 13.5831
V PERKERASAN BERBUTIR
5.1(1) Lapis Pondasi Agregat Klas A M3 59,400.00 20.7354
5.1(2) Lapis Pondasi Agregat Klas B M3 27,062.90 9.3239
Start 11 Des
VI PERKERASAN ASPAL
6.1(1) Lapis Resap Pengikat Ltr 356,400.00 3.4703
6.3.(7a) Laston Lapis Aus ( AC - WC ) M2 396,000.00 35.0253
Start
VII PEKERJAAN STRUKTUR
7.9 Pasangan Batu M3 733.33 0.5279
VIII PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.4(1) Marka Jalan M2 4,920.00 0.4987
8.4(2) Rambu Jalan Buah 26.00 0.0077
8.4(3) Patok Pengarah Buah 320.00 0.0297
8.4(4) Patok Kilometer Buah 83.00 0.0324
X PEKERJAAN LAIN-LAIN
10.1(2) Pemeliharaan Rutin Perkerasan Ls 1.00 0.2361 0.0060 0.0060 0.0060
10.1(3) Pemeliharaan Rutin Bahu Jalan Pemotongan, Rumput, Semak Ls 1.00 0.0749 0.0019 0.0019 0.0019
10.1(4) Pemeliharaan Rutin Selokan, Sal. Air Galian dan Timbunan Ls 1.00 0.0462 0.0012 0.0012 0.0012

100.0000

Jumlah Bobot Rencana 0.0873 0.0873 0.0873

Akumulasi Bobot Rencana 0 0.0873 0.1746 0.2620

Jumlah Bobot Realisasi


Akumulasi Bobot Realisasi
Deviasi

Disetujui Oleh,
Kepala SNVT Pembangunan Jalan dan Jembatan Perbatasan Kalimantan Timur
Paket Pembangunan Jalan dan Jembatan Malinau - Simanggaris (MYC)
Ir. SUHERIYATNA, MSi
NIP. 110 043 595
TIME SCHEDU
JALAN

JANUARI PEBRUARI MARET APRIL


2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1

0.0764 0.0764 0.0764 0.0764 0.0764


0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019

0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060


0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018
0.0295 0.0295 0.0295 0.0295 0.0295

0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374
0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482
0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097
0.0037 0.0037 0.0037 0.0037 0.0037
0.0141
0.0148

0.7406 0.7406 0.7406 0.7406


0.3330 0.3330 0.3330 0.3330 0.3330 0.3330
0.0203 0.0203 0.0203 0.0203 0.0203 0.0203 0.0203

0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045
0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009

0.0873 0.0873 0.0873 0.0970 0.0970 0.3580 0.3580 0.3640 0.3640 0.5321 0.8651 0.8984 1.6389 1.6389 1.6389 1.6679

0.3493 0.4366 0.5239 0.6209 0.7179 1.0759 1.4339 1.7979 2.1619 2.6941 3.5592 4.4576 6.0965 7.7354 9.3743 11.0422

PT.
ULE
PERIODE PELAKSANAAN

TAHUN 2008
MEI JUNI JULI AGUSTUS
2 3 4 1 2 3 4 1 2 3 4 1 2 3

0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019

0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060
0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018
0.0295 0.0295 0.0295 0.0295 0.0295 0.0295 0.0295 0.0295 0.0295 0.0295 0.0295 0.0295 0.0295 0.0295

0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374
0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482
0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097
0.0037 0.0037 0.0037
0.0141 0.0141 0.0141 0.0141 0.0141 0.0141 0.0141
0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148

0.7546 0.7546 0.7546 0.7546

0.7406 0.7406 0.7406 0.7406 0.74055001 0.74055001 0.74055001 0.74055001 0.74055001 0.74055001 0.74055 0.74055001 0.74055001 0.74055001
0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330
0.1735 0.1735 0.1735 0.1735 0.1735 0.1735 0.1735
0.1310 0.1310 0.1031 0.1031 0.1031 0.1031 0.1031
0.0203 0.0203 0.0203 0.0203 0.0203 0.0203 0.0203 0.0203 0.0203 0.0203 0.0203 0.0203 0.0203 0.0203

0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045
0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009

1.6679 1.6679 1.6679 1.6641 1.6641 1.6641 1.6641 1.9397 1.9397 1.9118 2.6664 2.6664 2.6664 2.6664

12.7100 14.3779 16.0458 17.7099 19.3740 21.0382 22.7023 24.6420 26.5817 28.4935 31.1600 33.8264 36.4928 39.1592

Diperiksa Oleh,
PT. Indah Karya (Persero) & Ass.
Ir. PRABOWO TRILAKSONO
Supervision Engineering
KONTRAKTOR : PT. PEMBANGUNAN PERUMAHAN - PT. BUMI KARSA - PT. PERDASA (KSO)
KONSULTAN : PT. INDAH KARYA & Ass.

SEPTEMBER OKTOBER NOPEMBER DESEMBER


4 1 2 3 4 1 2 3 4 1 2 3 4 1

0.0764 0.0764
0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019

0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060


0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018
0.0295

0.3374 0.3374 0.3374 0.3374 0.3374


0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482
0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097

0.7546 0.7546 0.7546 0.7546 0.7546 0.7546 0.7546 0.7546 0.7546 0.7546 0.7546 0.7546 0.7546 0.7546

0.74055001 0.74055001 0.74055001 0.74055001 0.74055001 0.74055001 0.74055 0.74055001 0.74055001 0.74055001
0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330
0.1735 0.1735 0.1735 0.1735 0.1735 0.1735 0.1735 0.1735 0.1735 0.1735 0.1735 0.1735 0.1735
0.1031 1.3310 1.5310 1.9310 3.3310 3.7317 3.6317 3.6317 3.6317 3.3317 2.6317 2.8017 2.6289
0.0203 0.0203 0.0203 0.0203 0.0203

0.0499 0.0499 0.0499 0.0499 0.0499 0.0499 0.0499 0.0499 0.0499


0.0019 0.0019 0.0019
0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030
0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032

0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045
0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009

2.6664 3.8648 4.0648 4.4648 5.8648 5.9639 5.8639 5.8000 5.4670 5.0652 3.6247 3.7966 3.7002 0.8977

41.8257 45.6905 49.7553 54.2201 60.0850 66.0488 71.9127 77.7127 83.1797 88.2449 91.8696 95.6661 99.3663 100.2641

Dibuat Oleh,
PT. Pembangunan Perumahan, KSO
Ir. ARYO SETIAWAN
General Superintendent
ASA (KSO)

KETERANGAN
EMBER
2

0.0764
0.0019
16 Desember 2008

.
Finish 16 De
Finish
0.0499
0.0019
0.0030
0.0032

0.0045
0.0015
0.0009

0.1431

100.407

an, KSO
SKNVT PEMBANGUNAN JALAN DAN JEMBATAN PERBATASAN KALIMANTAN TIMUR
PAKET PEMBANGUNAN JALAN DAN JEMBATAN MALINAU - SIMANGGARIS
Nilai Kontrak : Rp. 123.946.088.131.84

NO
URAIAN PEKERJAAN SATUAN PRAKIRAAN BOBOT TAHUN 2007
MATA
PEMBAY. KUANTITAS (%) DESEMBER JA
3 4 1
I UMUM
1.2 Mobilisasi Ls 0.85 0.8401 0.0764 0.0764 0.0764
1.8 Pemeliharaan dan Pengaturan Lalu Lintas Ls 0.85 0.0896 0.0019 0.0019 0.0019
II DRAINASE
2.1 Pek. Galian utk Selokan, Drainase dan Sal. air M3 9,600.00 0.1799
2.2 Pek. Pasangan batu dengan Mortar M3 4,810.00 2.6468
2.3(4) Gorong-gorong Pipa Baja Bergelombang Ton 22.68 0.5900
III PEKERJAAN TANAH
3.1(1) Galian Tanah Biasa M3 450,160.80 10.1218
3.2(1) Timbunan Biasa M3 49,531.19 1.3503
3.3 Penyiapan Badan Jalan M2 135,314.50 0.3288
3.5(1) Pengadaan & Pemasangan Geotextile M2 1,800.00 0.0298

11 Desember 2007
3.5(2) Pengadaan & Pemasangan Geogrids M2 2,600.00 0.1130
3.5(3) Pengadaan & Pemasangan Erosiaon Control Ma M2 2,600.00 0.1186
IV BAHU JALAN
4.1(2) Lapis Pondasi Agregat Klas B M3 39,600.00 13.5831
V PERKERASAN BERBUTIR
5.1(1) Lapis Pondasi Agregat Klas A M3 59,400.00 20.7354
5.1(2) Lapis Pondasi Agregat Klas B M3 27,062.90 9.3239
Start 11 Des
VI PERKERASAN ASPAL
6.1(1) Lapis Resap Pengikat Ltr 356,400.00 3.4703
6.3.(7a) Laston Lapis Aus ( AC - WC ) M2 396,000.00 35.0253
Start
VII PEKERJAAN STRUKTUR
7.9 Pasangan Batu M3 733.33 0.5279
VIII PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.4(1) Marka Jalan M2 4,920.00 0.4987
8.4(2) Rambu Jalan Buah 26.00 0.0077
8.4(3) Patok Pengarah Buah 320.00 0.0297
8.4(4) Patok Kilometer Buah 83.00 0.0324
X PEKERJAAN LAIN-LAIN
10.1(2) Pemeliharaan Rutin Perkerasan Ls 1.00 0.2361 0.0060 0.0060 0.0060
10.1(3) Pemeliharaan Rutin Bahu Jalan Pemotongan, Rumput, Semak Ls 1.00 0.0749 0.0019 0.0019 0.0019
10.1(4) Pemeliharaan Rutin Selokan, Sal. Air Galian dan Timbunan Ls 1.00 0.0462 0.0012 0.0012 0.0012

100.0000

Jumlah Bobot Rencana 0.0873 0.0873 0.0873

Akumulasi Bobot Rencana 0 0.0873 0.1746 0.2620

Jumlah Bobot Realisasi


Akumulasi Bobot Realisasi
Deviasi

Disetujui Oleh,
Kepala SNVT Pembangunan Jalan dan Jembatan Perbatasan Kalimantan Timur
Paket Pembangunan Jalan dan Jembatan Malinau - Simanggaris (MYC)
Ir. SUHERIYATNA, MSi
NIP. 110 043 595
TIME SCHEDU
JALAN

JANUARI PEBRUARI MARET APRIL


2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1

0.0764 0.0764 0.0764 0.0764 0.0764


0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019

0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060


0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018
0.0295 0.0295 0.0295 0.0295 0.0295

0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374
0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482
0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097
0.0037 0.0037 0.0037 0.0037 0.0037
0.0141
0.0148

0.7406 0.7406 0.7406 0.7406


0.3330 0.3330 0.3330 0.3330 0.3330 0.3330
0.0203 0.0203 0.0203 0.0203 0.0203 0.0203 0.0203

0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045
0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009

0.0873 0.0873 0.0873 0.0970 0.0970 0.3580 0.3580 0.3640 0.3640 0.5321 0.8651 0.8984 1.6389 1.6389 1.6389 1.6679

0.3493 0.4366 0.5239 0.6209 0.7179 1.0759 1.4339 1.7979 2.1619 2.6941 3.5592 4.4576 6.0965 7.7354 9.3743 11.0422

PT. In
ULE
PERIODE PELAKSANAAN

TAHUN 2008
MEI JUNI JULI
2 3 4 1 2 3 4 1 2 3 4

0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019

0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060
0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018
0.0295 0.0295 0.0295 0.0295 0.0295 0.0295 0.0295 0.0295 0.0295 0.0295 0.0295

0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.3374 0.4374 0.4374 0.4374 0.4374
0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482
0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097
0.0037 0.0037 0.0037
0.0141 0.0141 0.0141 0.0141 0.0141 0.0141 0.0141
0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148

0.7546

0.7406 0.7406 0.7406 0.7406 0.74055001 0.74055001 0.74055001 0.74055001 0.74055001 0.74055001 0.74055
0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330
0.1735 0.1735 0.1735 0.1735
0.1310 0.1310 0.1310 0.1310
0.0203 0.0203 0.0203 0.0203 0.0203 0.0203 0.0203 0.0203 0.0203 0.0203 0.0203

0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045
0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009

1.6679 1.6679 1.6679 1.6641 1.6641 1.6641 1.6641 2.0397 2.0397 2.0397 2.7943

12.7100 14.3779 16.0458 17.7099 19.3740 21.0382 22.7023 24.7420 26.7817 28.8215 31.6158

Diperiksa Oleh,
PT. Indah Karya (Persero) & Ass.
Ir. PRABOWO TRILAKSONO
Supervision Engineering
KONTRAKTOR : PT. PEMBANGUNAN PERUMAHAN - PT. BUMI
KONSULTAN : PT. INDAH KARYA & Ass.

AGUSTUS SEPTEMBER OKTOBER NOPEMBER


1 2 3 4 1 2 3 4 1 2 3 4 1 2

0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019

0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060
0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018 0.1018
0.0295 0.0295 0.0295 0.0295

0.4374 0.4374 0.4374 0.2374 0.2374 0.1707 0.1707 0.1707


0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482 0.0482
0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097 0.0097

0.7546 0.7546 0.7546 0.7546 0.7546 0.7546 0.7546 0.7546 0.7546 0.7546 0.7546 0.7546 0.7546 0.7546

0.74055001 0.74055001 0.74055001 0.74055001 0.74055001 0.74055001 0.74055001 0.74055001 0.74055001 0.74055 0.74055001 0.74055001 0.74055001
0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330 0.3330
0.1735 0.1735 0.1735 0.1735 0.2336 0.2336 0.2336 0.2336 0.1435 0.1435 0.1435 0.1435 0.1435 0.1435
0.1310 0.1310 1.3310 2.3310 2.3310 2.3310 2.3310 2.3310 2.1331 2.1331 2.1331 2.6310 2.6310 3.1973
0.0203 0.0203 0.0203 0.0203 0.0203 0.0203 0.0203 0.0203

0.0499 0.0499 0.0499 0.0499 0.0499 0.0499

0.0030 0.0030 0.0030 0.0030 0.0030 0.0030


0.0032 0.0032 0.0032 0.0032 0.0032 0.0032

0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045
0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009

2.7943 2.7943 3.9943 4.7943 4.8249 4.7582 4.7582 4.7582 4.2335 4.2335 4.1696 4.3345 4.3345 4.1603

34.4101 37.2044 41.1988 45.9931 50.8180 55.5761 60.3343 65.0925 69.3260 73.5595 77.7291 82.0636 86.3981 90.5584

PT. Pem
- PT. BUMI KARSA - PT. PERDASA (KSO)

KETERANGAN
PEMBER DESEMBER
3 4 1 2

0.0764 0.0764 0.0764


0.0019 0.0019 0.0019 0.0019
16 Desember 2008

0.7546 0.7546 0.7546


.
Finish 16 De
0.1435 0.1435
3.1973 3.1973
Finish
0.0499 0.0499 0.0499 0.0499
0.0019 0.0019 0.0019 0.0019
0.0030 0.0030 0.0030 0.0030
0.0032 0.0032 0.0032 0.0032

0.0045 0.0045 0.0045 0.0045


0.0015 0.0015 0.0015 0.0015
0.0009 0.0009 0.0009 0.0009

4.1622 4.2386 0.8977 0.1431

94.7206 98.9591 99.8569 100.000

Dibuat Oleh,
PT. Pembangunan Perumahan, KSO
Ir. ARYO SETIAWAN
General Superintendent
SKNVT PEMBANGUNAN JALAN DAN JEMBATAN PERBATASAN KALIMANTAN TIMUR
PAKET PEMBANGUNAN JALAN DAN JEMBATAN MALINAU - SIMANGGARIS
Nilai Kontrak : Rp. 123.946.088.131.84

NO
URAIAN PEKERJAAN SATUAN PRAKIRAAN
MATA
PEMBAY. KUANTITAS

I UMUM

1.2 Mobilisasi Ls 0.15

1.8 Pemeliharaan dan Pengaturan Lalu Lintas Ls 0.15

II DRAINASE

2.4(3) Pipa Untuk Pek. Drainase dibawah permukaan M1 252.00


VII PEKERJAAN STRUKTUR

7.1(3) Beton K-350 M3 562.00

7.1(5) Beton K-250 M3 1,207.00

7.1(6) Beton K-175 M3 81.00

7.1(7) Beton Siklop K-175 M3 270.00


7.1(7)a Pasir Urug untuk Isian Tiang Pancang M3 98.00

7.1(8) Beton K-125 M3 146.00

7.3(3) Baja Tulangan U32 Ulir Kg 268,538.00

7.4(2) Baja Struktur. Titik Leleh 2800 kg / Sm Penye. dan Pemas. Kg 17,400.00

7.4(3)a Baja Struktur. Titik Leleh 3500 kg / Sm Penye. dan Pemas. Kg 235,363.00

7.4(3)b Baja Struktur. Titik Leleh 3500 kg / Sm Rangka Baja Galvanis Kg 166,398.00
7.6(1) Pondasi Cerucuk Penyediaan & Pemasangan M1 22,500.00

7.6(8)a Penyediaan Tiang Pancang Baja dia. 400 mm M1 2,220.00

7.6(12) Pemancangan Tiang Pancang Pipa Baja Diameter 400 mm M1 2,220.00

7.7(2) Penyediaan Dinding sumuran Silinder dia. 300 mm M1 72.00

7.7(6) Penurunan Dinding Sumuran Silinder dia. 300 mm M1 72.00


7.9 Pasangan Batu M3 1,466.67

7.11(13) Rubber Joint M1 108.00

7.12(1) Perletakan, Pengadaan dan Pemasangan Elastomer Buah 84.00

VIII PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR


8.4(3) Patok Pengarah Buah 540.00

8.5(2)2 Pembuatan, Pembongkaran Jembatan Kayu M1 240.00

Jumlah Bobot Rencana

Akumulasi Bobot Rencana

Jumlah Bobot Realisasi

Akumulasi Bobot Realisasi


Deviasi

Disetujui Oleh,
Kepala SNVT Pembangunan Jalan dan Jembatan Perbatasan Kalimantan Timur
Paket Pembangunan Jalan dan Jembatan Malinau - Simanggaris (MYC)

Ir. SUHERIYATNA, MSi


NIP. 110 043 595
TIM

BOBOT
(%) PEBRUARI MARET APRIL
1 2 3 4 1 2 3 4 1

0.6623 0.0828 0.0828 0.0828 0.0828 0.0828

0.0706 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017

0.0444 0.0037

4.4888

8.0087

0.4217

1.3024
0.0754

0.5742

13.5986

1.7704

23.9479

17.3749
2.5003 0.8334 0.8334

13.5257 1.6907

1.5430

2.4998

0.1343
4.7166

0.6289

0.7806
0.2240

1.1064 0.1383 0.1383 0.1383 0.1383 0.1383

100.0000

0.0845 0.0845 0.0845 0.0845 0.2228 0.1400 0.1400 0.9734 2.6678

0.0845 0.1689 0.2534 0.3379 0.5607 0.7006 0.8406 1.8140 4.4818


TIME SCHEDULE
JEMBATAN

PERIODE

T
APRIL MEI JUNI
2 3 4 1 2 3 4 1 2 3 4

0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017

0.0037 0.0037 0.0037 0.0037 0.0037 0.0037 0.0037 0.0037 0.0037 0.0037 0.0037

0.2244 0.2244 0.2244 0.2244 0.2244 0.2244

0.4004 0.4004 0.4004 0.4004 0.4004 0.4004 0.4004 0.4004

0.0422 0.0422 0.0422 0.0422 0.0422 0.0422 0.0422 0.0422

0.2605 0.2605 0.2605 0.2605 0.2605

0.0251 0.0251 0.0251

0.1148 0.1148 0.1148 0.1148 0.1148

0.7157 0.7157 0.7157 0.7157 0.7157 0.7157 0.7157 0.7157 0.7157 0.7157 0.7157

1.9957 1.9957 1.9957 1.9957

1.7375 1.7375 1.7375

0.8334

1.6907 1.6907 1.6907 1.6907 1.6907 1.6907 1.69072

0.2204 0.2204 0.2204 0.2204 0.2204 0.2204 0.2204

0.3571 0.3571 0.3571 0.3571 0.3571 0.3571 0.3571

0.0168 0.0168 0.0168 0.0168 0.0168 0.0168 0.0168 0.0168

0.2144 0.2144 0.2144 0.2144 0.2144 0.2144

0.0524 0.0524 0.0524 0.0524


0.1383 0.1383 0.1383

3.3835 3.1459 3.5030 3.8492 3.8492 4.2880 3.8876 4.2449 5.7620 5.4049 5.4049

7.8654 11.0112 14.5142 18.3634 22.2126 26.5007 30.3882 34.6332 40.3952 45.8000 51.2049

Diperiksa Oleh,
PT. Indah Karya (Persero) & Ass.

Ir. PRABOWO TRILAKSONO


Supervision Engineering
PERIODE PELAKSANAAN

TAHUN 2008
JULI AGUSTUS SEPTEMBER
1 2 3 4 1 2 3 4 1 2 3

0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017

0.2244 0.2244 0.2244 0.2244 0.2244 0.2244 0.2244 0.2244 0.2244 0.2244 0.2244

0.4004 0.4004 0.4004 0.4004 0.4004 0.4004 0.4004 0.4004 0.4004 0.4004 0.4004

0.0422 0.0422

0.7157 0.7157 0.7157 0.7157 0.7157 0.7157 0.7157 0.7157

0.1770 0.1770 0.1770 0.1770 0.1770 0.1770 0.1770

1.9957 1.9957 1.9957 1.9957 1.9957 1.9957 1.9957 1.9957

1.7375 1.7375 1.7375 1.7375 1.7375 1.7375 1.7375

0.2144 0.2144 0.2144 0.2144 0.2144 0.2144 0.2144 0.2144 0.2144 0.2144 0.2144

0.0524 0.0524 0.0524 0.0524 0.0524 0.0524 0.0524 0.0524


5.3844 5.3844 5.3422 5.3422 5.5193 5.5193 5.5193 3.7818 1.0180 1.0180 1.0180

56.5893 61.9737 67.3159 72.6581 78.1774 83.6967 89.2159 92.9977 94.0157 95.0337 96.0517
KONTRAKTOR : PT. PEMBANGUNAN PERUMAHAN - PT. BUMI KARSA - PT. PERDA
KONSULTAN : PT. INDAH KARYA & Ass.

OKTOBER NOPEMBER DESEMBER


4 1 2 3 4 1 2 3 4 1 2

0.0828 0.0828 0.0828

0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017

0.2244 0.2244 0.2244

0.4004

0.1770 0.1770 0.1770

0.2144 0.2144 0.2144 0.2144 0.2144

0.1951 0.1951 0.1951 0.1951


0.0224 0.0224 0.0224 0.0224 0.0224 0.0224 0.0224 0.0224 0.0224 0.0224

1.0180 0.6400 0.6400 0.2385 0.2385 0.2192 0.2192 0.2192 0.3020 0.1069 0.1069

97.0697 97.7096 98.3496 98.5881 98.8265 99.0458 99.2650 99.4842 99.786 99.8931 100.000

Dibuat Oleh,
PT. Pembangunan Perumahan, KSO

Ir. ARYO SETIAWAN


General Superintendent
. PERDASA (KSO)

KETERANGAN

You might also like