EAR - PEMA0009920180904REC16 - Type X-5-16-2019
EAR - PEMA0009920180904REC16 - Type X-5-16-2019
People
Certification Group Engineers Muhammad Rusydi (NYLU);Dhimas Rahardjo
(DVZH)
Well Engineers
Wells
Certification Group Wells PEMA00099
Linked OQEs
Completion/Workover Program ACS-
006_Well%20Program_PEMA0009920180904RE
C16.docx
Basis of Design (BOD)
Approvals
From (DRAFT) to (APPROVED) 02-Apr-19
Sequence Role (Action Type) Action Date
1 EAR Checklist Approval (Approve)
1.1 Dhimas Rahardjo / D&C Engineer Approved 29-Mar-19
1.2 Waluyo Aji / D&C Operations Team Lead Approved 29-Mar-19
1.3 Nanang Lutfi Hamdani / D&C Engineering Team Lead Approved 01-Apr-19
2 EAR CHECLIST APPROVAL (Approve)
2.1 Iwan Wijanarko / WELLSAFE Examiner Approved 02-Apr-19
From (APPROVED) to (DRAFT) 10-May-19
From (DRAFT) to (APPROVED) 16-May-19
Sequence Role (Action Type) Action Date
1 EAR Checklist Approval (Approve)
1.1 Dhimas Rahardjo / D&C Engineer Approved 10-May-19
1.2 Nanang Lutfi Hamdani / D&C Engineering Team Lead Approved 14-May-19
1.3 Alex Hasmi / D&C Operations Team Lead Approved 15-May-19
2 EAR CHECKLIST APPROVAL (Approve)
2.1 Iwan Wijanarko / WELLSAFE Examiner Approved 16-May-19
WELLSAFE Execution Assurance Requirements Checklist
WSEA
WELLBORE SECTION PEMA00099
Ref No. Plan Data Actual Status Comment
1 Basic Well Data at Spud
Rig Name Rig ACS-017
Current RKB Elevation, ft 19
Ground Elevation, ft 80.9
Water Depth, ft 0
Slot Number -
Field Name Pematang
Area Bekasap North
1-A
Surface UWI PEMA00099
Lat/Long Datum ID74
Latitude 1° 16' 52.405" N
Longitude 101° 4' 38.214" E
Map Projection Type Universal Transverse Mercator
Map zone Zone 47N
Job spud date 30 March 2019
2 Pre-Spud Meeting
Conduct Pre-Job & Pre Tour Meeting :
The Well Control Risks identified and associated Safeguards including Safeguards
2-A
listed on the WSEA #3 shall be discussed in a rig-site Pre-Operations Meeting with all
crews
3 Well Control Safeguards
Killing the well properly before commencing Workover Operation
(No flow when pump OFF and 0 psi when well shut in) : - Annulus pressure & SITP
must be 0 psi and confirmed dead after “sufficient time” of observation before
3-A
commencing workover job
- Record Annulus pressure and SITP in Wellview report
- Cancel the Workover job if killing problem occurred