Drawings Register Upto 22.02.2019
1st Submission
2 Pressure tunnel intake portal excavation and support system layout 039, Dt:17.07.2018
3 Pressure tunnel intake portal excavation and support system plan 039, Dt:17.07.2018
2nd Submission
2 Pressure tunnel intake portal excavation and support system plan 099,Dt:02.01.2019
2 Pressure tunnel intake portal excavation and support system plan 123, Dt:20.02.2019
Pressure tunnel intake portal excavation and support system
3 sections (Intake-1) 123, Dt:20.02.2019
Pressure tunnel intake portal excavation and support system
5 (Option-A) section (Intake 2 to 12) 123, Dt:20.02.2019
Pressure tunnel intake portal excavation and support system
6 (Option-A) sections (Intake inlet transitions) 123, Dt:20.02.2019
Pressure tunnel intake portal excavation and support system
8 (Option-B) section (Intake 2 to 12) 123, Dt:20.02.2019
Pressure tunnel intake portal excavation and support system
9 (Option-B) sections (Intake inlet transitions) 123, Dt:20.02.2019
Pressure tunnel rock support annd excavation drawings
Drawing /
Doccument NO Revision Date received Date sent to Wapcos
mail on
7061507-460 C 20.02.2019 Mailed on 20.02.2019
mail on
7061507-461 C 20.02.2019 Mailed on 20.02.2019
mail on
7061507-462 C 20.02.2019 Mailed on 20.02.2019
mail on
7061507-464 C 20.02.2019 Mailed on 20.02.2019
mail on
7061507-465 C 20.02.2019 Mailed on 20.02.2019
mail on
7061507-467 C 20.02.2019 Mailed on 20.02.2019
mail on
7061507-468 C 20.02.2019 Mailed on 20.02.2019
wings
2 mails received on
21.02.2019
2 mails received on
21.02.2019 These drawings were approved on 21.02.2019
2 mails received on
21.02.2019
2 mails received on
21.02.2019
2 mails received on
21.02.2019
2 mails received on
21.02.2019
2 mails received on
21.02.2019
1st Submission
7061507.09 R0 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507.10. R0 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507.08 R0 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507.07 R0 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C202 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C203 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C204 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C205 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C210 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C211 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C212 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C213 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C214 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C215 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C216 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C217 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C218 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C219 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C220 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C256 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C257 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C258 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C259 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C260 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C261 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C262 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C263 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C264 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C265 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C270 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C271 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C272 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C273 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C274 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C275 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C276 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C277 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C278 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C279 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C301 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C302 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C303 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C304 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C305 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C306 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C307 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C308 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
Comments sent to
NECL Replies from Navayuga
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
Intake GA
1st Submission
8 Power house erection nay and uploading bay layout plan and section 063, Dt:18.10.2018
2nd Submission
Genearl arrangement layout plan 094,Dt:28.12.2018
General arrangement longitudinal section from Intake pool to Tail 094,Dt:28.12.2018
race channel outfall
7061507-C101 C 01.01.2019
7061507-C102 C 01.01.2019
7061507-C201 C 01.01.2019
7061507-C251 C 01.01.2019
7061507-C252 C 01.01.2019 i. Drawings sent on i.Mail recieved on
D460/19,Dt:07.01.2019 01.02.2019
7061507-C253 C 01.01.2019 ii. Reply from NECL lr 117 vide
mail 19.02.2019 and lr 503/19, ii. Mail received on
7061507-C351 B 01.01.2019 19.02.2019 on lr 117 of
Dt:19.02.2019
7061507-C352 B 01.01.2019 NECL
7061507-C451 C 01.01.2019
7061507-C452 C 01.01.2019
7061507-C453 C 01.01.2019
7061507-C454 C 01.01.2019
7061507-C801 B 01.01.2019
7061507-C802 B 01.01.2019
7061507-C101 D
7061507-C102 D
7061507-C201 D
Mail received Mail received on
7061507-C251 D Mail sent on 19.02.2019
on 19.02.2019 20.02.2019
7061507-C252 D
Mail received Mail received on
Mail sent on 19.02.2019
on 19.02.2019 20.02.2019
7061507-C253 D
7061507-C351 C
7061507-C352 C
Comments sent to Replies from
NECL Navayuga
D.No394/18,Dt:05.11.2
018 079/,Dt:22.11.2018
D.No394/18,Dt:05.11.2
018 079/,Dt:22.11.2018
D.No394/18,Dt:05.11.2
018 079/,Dt:22.11.2018
D.No394/18,Dt:05.11.2
018 079/,Dt:22.11.2018
117, Dt:11.02.209
117, Dt:11.02.209
D.No 408/18,
DT:15.11.2018 & 117, Dt:11.02.209
Additional comments
on 478/19, Dt:
30.01.2019 117, Dt:11.02.209
i.mailed on 02.02.2019
ii. WACPSO replies on lr
117 were sent vide 117, Dt:11.02.209
D.NO:503/19,
Dt:19.02.2019