Pressure tun

1st Submission

S.No Drawing / Doccument title NECL Letter Dt

1 Primary rock support for pressure tunnels-June 2018 039, Dt:17.07.2018

2 Pressure tunnel intake portal excavation and support system layout 039, Dt:17.07.2018

3 Pressure tunnel intake portal excavation and support system plan 039, Dt:17.07.2018

Pressure tunnel intake portal excavation and support system


4 039, Dt:17.07.2018
sections (intake-1)

Pressure tunnel intake portal excavation and support system


5 039, Dt:17.07.2018
(Option-A) section (intake -2 to 12)

Pressure tunnel intake portal excavation and support system


6 039, Dt:17.07.2018
(Option-A) section (intake -2 to 12)

Pressure tunnel intake portal excavation and support system


7 039, Dt:17.07.2018
(Option-A) section (intakeinlet transition)

Pressure tunnel intake portal excavation and support system


8 039, Dt:17.07.2018
(Option-B) section (intake -2 to 12)

Pressure tunnel intake portal excavation and support system


9 039, Dt:17.07.2018
(Option-B) section (intake -2 to 12)

Pressure tunnel intake portal excavation and support system


10 039, Dt:17.07.2018
(Option-B) section (intakeinlet transition)

2nd Submission

Pressure tunnel intake portal excavation and support system layout


1 099,Dt:02.01.2019

2 Pressure tunnel intake portal excavation and support system plan 099,Dt:02.01.2019

Pressure tunnel intake portal excavation and support system


3 sections (Intake-1) 099,Dt:02.01.2019

Pressure tunnel intake portal excavation and support system


4 (Option-A) section (Intake 2 to 12) 099,Dt:02.01.2019

Pressure tunnel intake portal excavation and support system


5 (Option-A) section (Intake 2 to 12) 099,Dt:02.01.2019
Pressure tunnel intake portal excavation and support system
6 (Option-A) sections (Intake inlet transitions) 099,Dt:02.01.2019

Pressure tunnel intake portal excavation and support system


7 (Option-B) section (Intake 2 to 12) 099,Dt:02.01.2019

Pressure tunnel intake portal excavation and support system


8 (Option-B) section (Intake 2 to 12) 099,Dt:02.01.2019

Pressure tunnel intake portal excavation and support system


9 (Option-B) sections (Intake inlet transitions) 099,Dt:02.01.2019
3rd Submission
Pressure tunnel intake portal excavation and support system layout
1 123, Dt:20.02.2019

2 Pressure tunnel intake portal excavation and support system plan 123, Dt:20.02.2019
Pressure tunnel intake portal excavation and support system
3 sections (Intake-1) 123, Dt:20.02.2019
Pressure tunnel intake portal excavation and support system
5 (Option-A) section (Intake 2 to 12) 123, Dt:20.02.2019
Pressure tunnel intake portal excavation and support system
6 (Option-A) sections (Intake inlet transitions) 123, Dt:20.02.2019
Pressure tunnel intake portal excavation and support system
8 (Option-B) section (Intake 2 to 12) 123, Dt:20.02.2019
Pressure tunnel intake portal excavation and support system
9 (Option-B) sections (Intake inlet transitions) 123, Dt:20.02.2019
Pressure tunnel rock support annd excavation drawings

Drawing /
Doccument NO Revision Date received Date sent to Wapcos

7061507.12 R0 19.07.2018 D.NO:223/18,Dt:24.07.2018

7061507-C460 A 19.07.2018 D.NO:223/18,Dt:24.07.2018

7061507-C461 A 19.07.2018 D.NO:223/18,Dt:24.07.2018

7061507-C462 A 19.07.2018 D.NO:223/18,Dt:24.07.2018

7061507-C463 A 19.07.2018 D.NO:223/18,Dt:24.07.2018

7061507-C464 A 19.07.2018 D.NO:223/18,Dt:24.07.2018

7061507-C465 A 19.07.2018 D.NO:223/18,Dt:24.07.2018

7061507-C466 A 19.07.2018 D.NO:223/18,Dt:24.07.2018

7061507-C467 A 19.07.2018 D.NO:223/18,Dt:24.07.2018

7061507-C468 A 19.07.2018 D.NO:223/18,Dt:24.07.2018

7061507-460 B 07.01.2019 459/19,Dt:07.01.2019

7061507-461 B 07.01.2019 459/19,Dt:07.01.2019

7061507-462 B 07.01.2019 459/19,Dt:07.01.2019

7061507-463 B 07.01.2019 459/19,Dt:07.01.2019

7061507-464 B 07.01.2019 459/19,Dt:07.01.2019


7061507-465 B 07.01.2019 459/19,Dt:07.01.2019

7061507-466 B 07.01.2019 459/19,Dt:07.01.2019

7061507-467 B 07.01.2019 459/19,Dt:07.01.2019

7061507-468 B 07.01.2019 459/19,Dt:07.01.2019

mail on
7061507-460 C 20.02.2019 Mailed on 20.02.2019
mail on
7061507-461 C 20.02.2019 Mailed on 20.02.2019
mail on
7061507-462 C 20.02.2019 Mailed on 20.02.2019
mail on
7061507-464 C 20.02.2019 Mailed on 20.02.2019
mail on
7061507-465 C 20.02.2019 Mailed on 20.02.2019
mail on
7061507-467 C 20.02.2019 Mailed on 20.02.2019
mail on
7061507-468 C 20.02.2019 Mailed on 20.02.2019
wings

Comments recievd from Comments sent to


Wapcos NECL Replies from Navayuga
Mail recieved on D.NO:380/18,
11.10.2018 26.10.2018 Lr:073, Dt:12.11.2018 Received vide mail dt:
12.11.2018. Hard copy received on 14.11.2018
Mail recieved on D.NO:380/18,
11.10.2018 26.10.2018 Lr:073, Dt:12.11.2018 Received vide mail dt:
12.11.2018. Hard copy received on 14.11.2018
Mail recieved on D.NO:380/18,
11.10.2018 26.10.2018 Lr:073, Dt:12.11.2018 Received vide mail dt:
12.11.2018. Hard copy received on 14.11.2018
Mail recieved on D.NO:380/18,
11.10.2018 26.10.2018 Lr:073, Dt:12.11.2018 Received vide mail dt:
12.11.2018. Hard copy received on 14.11.2018
Mail recieved on D.NO:380/18,
11.10.2018 26.10.2018 Lr:073, Dt:12.11.2018 Received vide mail dt:
12.11.2018. Hard copy received on 14.11.2018
Mail recieved on D.NO:380/18,
11.10.2018 26.10.2018 Lr:073, Dt:12.11.2018 Received vide mail dt:
12.11.2018. Hard copy received on 14.11.2018
Mail recieved on D.NO:380/18,
11.10.2018 26.10.2018 Lr:073, Dt:12.11.2018 Received vide mail dt:
12.11.2018. Hard copy received on 14.11.2018
Mail recieved on D.NO:380/18,
11.10.2018 26.10.2018 Lr:073, Dt:12.11.2018 Received vide mail dt:
12.11.2018. Hard copy received on 14.11.2018
Mail recieved on D.NO:380/18,
11.10.2018 26.10.2018 Lr:073, Dt:12.11.2018 Received vide mail dt:
12.11.2018. Hard copy received on 14.11.2018
Mail recieved on D.NO:380/18,
11.10.2018 26.10.2018 Lr:073, Dt:12.11.2018 Received vide mail dt:
12.11.2018. Hard copy received on 14.11.2018

Mail recieved on D.NO: 472/19,


18.01.2019 and 28.01.2019 Dt:22.01.2019

Mail recieved on D.NO: 472/19,


18.01.2019 and 28.01.2019 Dt:22.01.2019

Mail recieved on D.NO: 472/19,


18.01.2019 and 28.01.2019 Dt:22.01.2019

Mail recieved on D.NO: 472/19,


18.01.2019 and 28.01.2019 Dt:22.01.2019

Mail recieved on D.NO: 472/19,


18.01.2019 and 28.01.2019 Dt:22.01.2019
Mail recieved on D.NO: 472/19,
18.01.2019 and 28.01.2019 Dt:22.01.2019

Mail recieved on D.NO: 472/19,


18.01.2019 and 28.01.2019 Dt:22.01.2019

Mail recieved on D.NO: 472/19,


18.01.2019 and 28.01.2019 Dt:22.01.2019

Mail recieved on D.NO: 472/19,


18.01.2019 and 28.01.2019 Dt:22.01.2019

2 mails received on
21.02.2019
2 mails received on
21.02.2019 These drawings were approved on 21.02.2019
2 mails received on
21.02.2019
2 mails received on
21.02.2019
2 mails received on
21.02.2019
2 mails received on
21.02.2019
2 mails received on
21.02.2019
1st Submission

S.No Drawing / Doccument title NECL Letter Dt


Report on Structural Design of Intake Structure (Intermediate 031,Dt:06.07.2018
1 Bays)
Report on Structural Design of Intake Structure (End Bays) 031,Dt:06.07.2018
2
Report on Concrete Lining for Inlet Transition D/s of Intake 031,Dt:06.07.2018
3 Structure
Report on Stability Analysis and Structural Design of Retaining 031,Dt:06.07.2018
4 Wall
Approach Channel & Intakepool Concrete Outline plan and 031,Dt:06.07.2018
5 section
Approach Channel & Intakepool Concrete Outline Section And 031,Dt:06.07.2018
6 Details
Approach Channel & Intakepool Concrete Outline Section And 031,Dt:06.07.2018
7 Details
Approach Channel & Intakepool Concrete Outline And 031,Dt:06.07.2018
8 Reinforcement Details
Intake Pool Retaining Wall Concrete Out Line Plan 031,Dt:06.07.2018
9
Intake Pool Retaining Wall Concrete Out Line Longitudinal 031,Dt:06.07.2018
10 Section
Intake Pool Retaining Wall Concrete Out Line Sections 031,Dt:06.07.2018
11
Intake Pool Retaining Wall Concrete Out Line Sections 031,Dt:06.07.2018
12
Intake Pool Retaining Wall Concrete Out Line Sections 031,Dt:06.07.2018
13
Intake Pool Retaining Wall Concrete Out Line Sections 031,Dt:06.07.2018
14
Intake Pool Retaining Wall Concrete Out Line Sections 031,Dt:06.07.2018
15
Intake Pool Retaining Wall Concrete Out Line Sections 031,Dt:06.07.2018
16
Intake Pool Retaining Wall Reinforcement Details 031,Dt:06.07.2018
17
Intake Pool Retaining Wall Reinforcement Details 031,Dt:06.07.2018
18
Intake Pool Retaining Wall Reinforcement Details 031,Dt:06.07.2018
19
Intake Structure-Intermediate Bays General Layout Plan 031,Dt:06.07.2018
20
Intake Structure-Intermediate Bays Concrete Outline Cross 031,Dt:06.07.2018
21 Section
Intake Structure-Intermediate Bays Concrete Outline Plan At El 031,Dt:06.07.2018
22 26.30M & El35.00M
Intake Structure-Intermediate Bays Concrete Outline Plan At El 031,Dt:06.07.2018
23 48.22M & L-Section
Intake Structure-Intermediate Bays Reinforcement Details 031,Dt:06.07.2018
24 Cross Section
Intake Structure-Intermediate Bays Reinforcement Details Plan 031,Dt:06.07.2018
25 At El 26.30M
Intake Structure-Intermediate Bays Reinforcement Details Plan 031,Dt:06.07.2018
26 At El 35.00M
Intake Structure-Intermediate Bays Reinforcement Details Plan 031,Dt:06.07.2018
27 At El 40.00M
Intake Structure-Intermediate Bays Reinforcement Details 031,Dt:06.07.2018
28
Intake Structure-Intermediate Bays Reinforcement Details 031,Dt:06.07.2018
29
Intake Structure End Bays General Layout Plan 031,Dt:06.07.2018
30
Intake Structure End Bays Concrete Outline Cross Section 031,Dt:06.07.2018
31
Intake Structure End Bays Concrete Outline Plan At El 26.30M 031,Dt:06.07.2018
32 & El 35.00M
Intake Structure End Bays Concrete Outline Plan At El 48.22M 031,Dt:06.07.2018
33 & L-Section

Intake Structure End Bays Reinforcement Details Cross Section 031,Dt:06.07.2018


34
Intake Structure End Bays Reinforcement Details Plan At El 031,Dt:06.07.2018
35 26.30M
Intake Structure End Bays Reinforcement Details Plan At El 031,Dt:06.07.2018
36 35.00M
Intake Structure End Bays Reinforcement Details Plan At El 031,Dt:06.07.2018
37 40.00M
Intake Structure End Bays Reinforcement Details 031,Dt:06.07.2018
38
Intake Structure End Bays Reinforcement Details 031,Dt:06.07.2018
39
Intake Structure Inlet Transition- Concrete Outline Plan & 031,Dt:06.07.2018
40 Section

Intake Structure Inlet Transition- Concrete Outline Sections 031,Dt:06.07.2018


41

Intake Structure Inlet Transition- Concrete Outline Sections 031,Dt:06.07.2018


42
Intake Structure Inlet Transition- Concrete Outline Sections 031,Dt:06.07.2018
43

Intake Structure Inlet Transition- Concrete Outline Sections 031,Dt:06.07.2018


44

Intake Structure Inlet Transition- Concrete Outline Sections 031,Dt:06.07.2018


45
Intake Structure Inlet Transition Reinforcement Longitudinal & 031,Dt:06.07.2018
46 Cross Section Details
Intake Structure Inlet Transition Reinforcement Cross Section 031,Dt:06.07.2018
47 Details
Intake drawings

Drawing / Comments recievd from


Doccument NO Revision Date received Date sent to Wapcos Wapcos

7061507.09 R0 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507.10. R0 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507.08 R0 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507.07 R0 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C202 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C203 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C204 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C205 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C210 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C211 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C212 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C213 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C214 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C215 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C216 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C217 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C218 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C219 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C220 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C256 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C257 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C258 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C259 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C260 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C261 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C262 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C263 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C264 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C265 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C270 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C271 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C272 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C273 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C274 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C275 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C276 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C277 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C278 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C279 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C301 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C302 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C303 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
7061507-C304 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C305 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C306 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C307 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018

7061507-C308 A 13.07.2018
D.No:204/18, 16.07.2018 Mail dt: 14.08.2018
Comments sent to
NECL Replies from Navayuga
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
D.No 230/18,
DT:25.07.2018 31.07.2018 hard copy in file
Intake GA
1st Submission

S.No Drawing / Doccument title NECL Letter Dt

1 Approach channel & Intake pool GA layout plan 063, Dt:18.10.2018

2 Intake strcuture general arrangement layout plan 063, Dt:18.10.2018

3 Approach channel & Intaek pool longitiudinal section 063, Dt:18.10.2018

4 Intake structure up-stream view 063, Dt:18.10.2018

5 Power house GA layout plan 063, Dt:18.10.2018

6 Power house L-section along 'C' line 063, Dt:18.10.2018

7 Power house cross ection through 'C' line 063, Dt:18.10.2018

8 Power house erection nay and uploading bay layout plan and section 063, Dt:18.10.2018
2nd Submission
Genearl arrangement layout plan 094,Dt:28.12.2018
General arrangement longitudinal section from Intake pool to Tail 094,Dt:28.12.2018
race channel outfall

Approach cahnnel & Intake pool GA layout plan 094,Dt:28.12.2018

Intake structure general layout plan 094,Dt:28.12.2018


Approach channel & Intake pool longitiudinal section 094,Dt:28.12.2018
Intake structure up-stream view 094,Dt:28.12.2018
Pressure tunnel general arrangement layout plan 094,Dt:28.12.2018
Pressure tunnel plan and L-section 094,Dt:28.12.2018
Power house general arrangement layout plan 094,Dt:28.12.2018
Power house L-section along 'C' line 094,Dt:28.12.2018
Power house cross section through 'C' line 094,Dt:28.12.2018
Power house erection bay and uploading bay layout plan and section 094,Dt:28.12.2018
Tail race channel general arrangement layout plan 094,Dt:28.12.2018
Tail race channel sections 094,Dt:28.12.2018
3rd Submission
Genearl arrangement layout plan 122, dt19.02.2019
General arrangement longitudinal section from Intake pool to Tail 122, dt19.02.2019
race channel outfall
Approach cahnnel & Intake pool GA layout plan 122, dt19.02.2019
Intake structure general layout plan 122, dt19.02.2019
Approach channel & Intake pool longitiudinal section 122, dt19.02.2019
Intake structure up-stream view 122, dt19.02.2019
Pressure tunnel general arrangement layout plan 122, dt19.02.2019
Pressure tunnel plan and L-section 122, dt19.02.2019
Intake GA & PH drawings

Drawing / Comments recievd from


Doccument NO Revision Date received Date sent to Wapcos Wapcos
Mail recieved on
7061507-C201 B 24.10.2018 382/18,Dt:26.10.2018 01.11.2018
Mail recieved on
7061507-C251 B 24.10.2018 382/18,Dt:26.10.2018 01.11.2018
Mail recieved on
7061507-C252 B 24.10.2018 382/18,Dt:26.10.2018 01.11.2018
Mail recieved on
7061507-C253 B 24.10.2018 382/18,Dt:26.10.2018 01.11.2018
Mail receievd on
7061507-C451 B 24.10.2018 382/18,Dt:26.10.2018 03.11.2018
Mail receievd on
7061507-C452 B 24.10.2018 382/18,Dt:26.10.2018 03.11.2018
Mail receievd on
7061507-C453 B 24.10.2018 382/18,Dt:26.10.2018 03.11.2018
Mail receievd on
7061507-C454 B 24.10.2018 382/18,Dt:26.10.2018 03.11.2018

7061507-C101 C 01.01.2019

7061507-C102 C 01.01.2019

7061507-C201 C 01.01.2019

7061507-C251 C 01.01.2019
7061507-C252 C 01.01.2019 i. Drawings sent on i.Mail recieved on
D460/19,Dt:07.01.2019 01.02.2019
7061507-C253 C 01.01.2019 ii. Reply from NECL lr 117 vide
mail 19.02.2019 and lr 503/19, ii. Mail received on
7061507-C351 B 01.01.2019 19.02.2019 on lr 117 of
Dt:19.02.2019
7061507-C352 B 01.01.2019 NECL
7061507-C451 C 01.01.2019
7061507-C452 C 01.01.2019
7061507-C453 C 01.01.2019
7061507-C454 C 01.01.2019
7061507-C801 B 01.01.2019
7061507-C802 B 01.01.2019

7061507-C101 D

7061507-C102 D

7061507-C201 D
Mail received Mail received on
7061507-C251 D Mail sent on 19.02.2019
on 19.02.2019 20.02.2019
7061507-C252 D
Mail received Mail received on
Mail sent on 19.02.2019
on 19.02.2019 20.02.2019

7061507-C253 D
7061507-C351 C
7061507-C352 C
Comments sent to Replies from
NECL Navayuga
D.No394/18,Dt:05.11.2
018 079/,Dt:22.11.2018
D.No394/18,Dt:05.11.2
018 079/,Dt:22.11.2018
D.No394/18,Dt:05.11.2
018 079/,Dt:22.11.2018
D.No394/18,Dt:05.11.2
018 079/,Dt:22.11.2018

117, Dt:11.02.209

117, Dt:11.02.209
D.No 408/18,
DT:15.11.2018 & 117, Dt:11.02.209
Additional comments
on 478/19, Dt:
30.01.2019 117, Dt:11.02.209

i.mailed on 02.02.2019
ii. WACPSO replies on lr
117 were sent vide 117, Dt:11.02.209