REWORKS FOR SANITARY AND WATER LINES

MATERIALS MANPOWER COST


CORING MACHINE 25 WORKING DAYS
SIZES FOREMAN 1 1250
2'' LEADMAN 1 750
3'' MASON 5 550
4'' LABOR 10 450
CHIPPING GUN
COST DAYS
1200/DAY
DEFORMED BAR
SIZE
12mm
ATLANTA SANITARY PIPES
SIZES QUANTITY
50mm SANITARY PIPES 10 Pcs
50 mmΦ BENT PIPES 13 Pcs

TOTAL
Y AND WATER LINES
R COST
G DAYS SCOPE OF WORK
25000 LOCATION COST
15000 TOILET 1
55000 INAPPROPRIATE LOCATION OF LV # 7
90000 1 INAPPROPRIATE LOCATION OF VENT PIPE
2 WATER LINE REPAIR
1 MISSING WATER LINE STAB OUT

TOILET 2

TOILET 3
3 WATER CLOSET INAPPROPRIATE LOCATION
11 STAB OUT FOR DRAIN
1 STAB OUT FOR WATER LINE
4 LAVATORY REPAIR
4 URINALS REPAIR

TOILET 4
1 WATER CLOSET NEW STAB OUT
1 FLOOR DRAIN NEW STAB OUT
1 LAVATORY REPAIR

TOILET 5
2 WATER CLOSET NEW STAB OUT
2 FLOOR DRAIN NEW STAB OUT
185000 2 LAVATORY REPAR