Technical Documents: Puttalam 1X300Mw Coal-Fired Power Plant Project

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

TECHNICAL DOCUMENTS

FOR

PUTTALAM 1X300MW COAL-FIRED POWER PLANT PROJECT

CEYLON ELECTRICITY BOARD

CHINA NATIONAL MACHINERY & EQUIPMENT


IMPORT & EXPORT CORPORATION

JAN, 2006
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

GENERAL CONTENTS

VOLUME 1 MAIN POWER BLOCK


VOLUME 2 BALANCE OF PLANT
VOLUME 3 PORT PART
VOLUME 4 TRANSMISSION LINE AND
SUBSTATION
VOLUME 5 SITE DEVELOPMENT, HOUSING
COMPOUND AND RESETTLEMENT
ACTIVITIES

1
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

TECHNICAL DOCUMENTS

FOR

PUTTALAM 1X300MW COAL-FIRED POWER PLANT PROJECT

VOLUME 2 BALANCE OF PLANT

2
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

CONTENTS

SEC.1 GENERAL DESCRIPTION

1 GENERAL

1.1 PROJECT BRIEF

1.2 SITE CONDITIONS

1.3 AUXILIARY FACILITIES

SEC.2 BOILER AUXILIARES


2.1 GENERAL

2.1.1 EXTENT OF WORK

2.2 FUEL OIL SYSTEM

2.2.1 SCOPE OF THE SYSTEM DESIGN

2.2.2 DESCRIPTION OF THE SYSTEM

2.3 COMPRESSED AIR SYSTEM

2.3.1 SCOPE OF THE SYSTEM DESIGN

2.3.2 DESCRIPTION OF THE SYSTEM DESIGN

2.4 AUXILIARY BOILER AND ACCESSORIES

2.4.1 SCOPE OF THE SYSTEM

2.4.2 DESCRIPTION OF THE SYSTEM DESIGN

2.5 THERMAL INSULATION, PAINTING, NOISE SUPPRESSION

2.5.1 THERMAL INSULATION

3
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

2.5.2 PAINTING

2.5.3 NOISE SUPPRESSION

2.6 MISCELLANEOUS

2.6.1 MACHINE SHOP AND MAINTENANCE SERVICES WORKSHOP

2.6.2 LABORATORY

SEC. 3 COAL HANDLING SYSTEM

3.0 GENERAL

3.0.1 SYSTEM DESCRIPTION

3.0.2 DESIGN CONDITION

3.1 COAL UNLOADING SYSTEM

3.1.1 SEA WATER LEVELS

3.1.2 WAVE CLIMATE

3.1.3 UNLOADING WHARF

3.2 COAL STORAGE YARD & STACKING RECLAIMING SYSTEM

3.2.1 TRAVELLING STACKER-RECLAIMER

3.2.2 BULLDOZER

3.2.3 DRY COAL SHED

3.3 SCREENING & CRUSHING

3.3.1 ROLLER SCREEN

3.3.2 RING HAMMER CRUSHER

3.4 BELT CONVEYOR SYSTEM

3.4.1 GENERAL DESCRIPTION

4
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

3.4.2 CHARACTERISTICS

3.5 ANCILLARY EQUIPMENT

3.5.1 BELT WEIGHTING SCALE

3.5.2 MAGNETIC SEPARATOR

3.5.3 SAMPLING APPARATUS

3.6 ANCILLARY SYSTEMS

3.6.1 WASHDOWN SYSTEM & SUMP PUMP

3.6.2 COAL YARD SPRINKLING SYSTEM

3.6.3 DUST COLLECTION OF COAL HANDLING SYSTEM

3.6.4 OTHER SPECIFIED SERVICES

3.7 COAL HANDLING CONTROL SYSTEM

3.7.1 GENERAL

3.7.2 DESIGN CRITERIA

3.7.3 EQUIPMENT DESCRIPTION

3.7.4 DRAWING AND DATA SHEET

3.8 OTHER INDIVIDUAL FIELD DESCRIPTION

3.8.1 POWER SUPPLY, LIGHTING, AND LIGHTNING PROTECTION ETC.

3.8.2 HOISTING AND TRANSPORT FACILITIES FOR MAINTENANCE

3.8.3 COAL HANDLING SYSTEM COMPREHENSIVE BUILDING

SEC. 4 ASH HANDLING SYSTEM

4.0 ASH HANDLING SYSTEM

4.0.1 SYSTEM FUNCTION AND CONSTITUTION

5
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

4.0.2 DESIGN CONDITIONS

4.1 BOTTOM ASH HANDLING SYSTEM

4.1.1 SYSTEM DESCRIPTION

4.1.2 SUBMERGED SCRAPER CONVEYOR (HEREINAFTER CALLED SSC)

4.1.3 BOTTOM ASH BIN

4.1.4 OVERFLOW PUMP

4.1.5 SETTLING TANK

4.2 MILL REJECTS SYSTEM

4.2.1 SYSTEM FUNCTION

4.2.2 SYSTEM DESCRIPTION

4.3 FLY ASH HANDLING SYSTEM.

4.4 FLY ASH STORAGE SILOS

4.5 ASH HANDLING CONTROL SYSTEM

SEC. 5 CHEMICAL WATER TREATMENT

5.0 GENERAL

5.1 SEAWATER DESALTED SYSTEM

5.1.1 SYSTEM CAPACITY

5.1.2 SYSTEM DESCRIPTION

5.2 MAKE-UP WATER TREATMENT SYSTEM

5.2.1 SYSTEM CAPACITY

5.2.2 SYSTEM CHOICE

5.2.3 SYSTEM FUNCTIONS

6
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

5.2.4 SYSTEM OUTLET WATER QUALITY

5.2.5 ARRANGEMENT OF EQUIPMENT

5.2.6 TECHNICAL SPECIFICATIONS

5.3 WASTEWATER TREATMENT SYSTEM

5.3.1 SYSTEM DESCRIPTION

5.3.2 TECHNICAL SPECIFICATIONS

5.4 CHLORINATION SYSTEM

5.4.1 SYSTEM DESCRIPTION

5.4.2 TECHNICAL SPECIFICATIONS

5.5 HYDROGEN AND OXYGEN GAS GENERATION SYSTEM

5.5.1 SYSTEM DESCRIPTIONS

5.5.2 DESIGN CRITERIA

5.5.3 TECHNICAL SPECIFICATIONS

SEC. 6 WATER SUPPLY AND DISCHARGE SYSTEM

6.1 COOLING WATER SYSTEM

6.1.0 GENERAL

6.1.1 DESIGN CRITERIA

6.1.2 DESCRIPTION OF THE SYSTEM

6.1.3 CIRCULATING WATER PUMP (CW PUMP)

6.1.4 CIRCULATING WATER PIPING AND BUTTERFLY VALVE

6.1.5 COOLING WATER PURIFICATION & SCREENING

6.1.6 HOISTING FACILITIES

7
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

6.1.7 DRAINAGE PUMP IN C.W PUMP HOUSE

6.2 FIRE FIGHTING AND FIRE ALARM SYSTEM

6.2.0 GENERAL

6.2.1 DESIGN CRITERIA

6.2.2 WATER FIRE FIGHTING SYSTEM

6.2.3 FOAM FIRE FIGHTING SYSTEM

6.2.4 CO2 FIRE FIGHTING SYSTEM DESCRIPTION

6.2.5 FIRE ALARM AND CONTROL SYSTEM

6.2.6 THE TYPE OF FIRE PROTECTION AND DETECTION AND FIRE


PROTECTION ZONES

6.3 WATER TREATMENT SYSTEM

6.3.1 DESCRIPTION OF THE SYSTEM

6.3.2 DESIGN CRITERIA

6.3.3 MAIN TREATMENT FACILITIES AND STRUCTURE

6.3.4 INSTRUMENTATION AND CONTROL

6.4 SERVICE WATER SYSTEM

6.4.1 DESCRIPTION OF THE SYSTEM

6.4.2 DESIGN CRITERIA

6.5 POTABLE WATER SYSTEM

6.5.1 DESCRIPTION OF THE SYSTEM

6.5.2 INDOOR POTABLE WATER SYSTEM

6.5.3 OUTDOOR POTABLE WATER PIPING NETWORK

6.6 WASTE WATER DRAINAGE SYSTEM

8
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

6.6.1 DESCRIPTION OF THE SYSTEM

6.6.2 DESIGN CRITERIA

6.6.3 DRAINAGE FACILITIES

6.7 OILY WASTE WATER DRAINAGE SYSTEM

6.7.1 DESCRIPTION OF THE SYSTEM

6.7.2 OILY WASTE WATER' TREATMENT SYSTEM

6.8 SANITARY SEWAGE SYSTEM

6.8.1 DESCRIPTION OF THE SYSTEM

6.8.2 INDOOR SANITARY SEWAGE SYSTEM

6.8.3 OUTDOOR SANITARY SEWAGE SYSTEM

6.8.4 SANITARY SEWAGE TREATMENT SYSTEM

6.8.5 ASH LANDFILL RUN-OFF WATER TREATMENT SYSTEM

6.9 CIVIL DESIGN DESCRIPTION FOR HYDRAULIC STRUCTURES

6.9.1 C.W. SYSTEM STRUCTURE

6.9.2 COMPLEX WATER PUMP HOUSE

6.9.3 INDUSTRIAL WASTE WATER TREATMENT BUILDING

6.9.4 BOTTOM ASH YARD

6.9.5 STRUCTRAL DESIGN STANDARD

6.9.6 ARCHITECTURAL DESIGN

SEC. 7 FLUE GAS DESULPHURIZATION

7.1 SYSTEM DESCRIPTION

7.2 MAIN PROCESS OF NATURE SEAWATER DESULPHURIZATION

9
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

7.2.1 FLUE GAS SYSTEM

7.2.2 SO2 ABSORPTION SYSTEM

7.2.3 SEAWATER SUPPLYING SYSTEM

7.2.4 SEAWATER RECOVERY BASIN SYSTEM

7.2.5 COMMON SYSTEM

SEC. 8 ELECTRICAL SYSTEM

8.0 GENERAL

8.0.1 DESCRIPTION OF PROJECT

8.0.2 SCOPE OF THE PROJECT

8.0.3 DESIGN CRITERIA

8.0.4 MEDIUM VOLTAGE METAL-CLAD SWITCHGEAR

8.0.5 LIGHTING AND MAINTENANCE SYSTEM

8.0.6 LIGHTNING AND GROUNDING SYSTEM

8.0.7 CONSTRUCTION FEATURES

8.1 AUXILIARY ELECTRICAL SYSTEM.

8.1.1 GENERAL

8.1.2 DESIGN CRITERIA

8.1.3 SYSTEM AND EQUIPMENT DESCRIPTION

8.2 CABLE AND RACEWAY SYSTEM

8.2.1 ELECTRIC CABLE

8.2.2 RACEWAY SYSTEM

8.3 CONTROL, INSTRUMENTATION AND RELAYING SYSTEM


10
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

8.3.1 GENERAL

8.3.2 DESIGN CRITERIA

8.4 ELECTRICAL MOTORS

8.4.1 GENERAL

8.4.2 DESIGN CRITERIA

8.5 INTERPLANT COMMUNICATION SYSTEM

8.6 LIGHTING SYSTEM

8.6.1 GENERAL

8.6.2 DESIGN CRITERIA

8.6.3 EQUIPMENT DESCRIPTION

8.7 MAINTENANCE POWER SYSTEM

8.7.1 GENERAL

8.7.2 DESIGN CRITERIA

8.8 LIGHTNING PROTECTING SYSTEM

8.8.1 GENERAL

8.8.2 DESIGN CRITERIA

8.9 GROUNDING SYSTEM

8.9.1 GENERAL

8.9.2 DESIGN CRITERIA

8.9.3 COMPONENT DESCRIPTIONS

8.9.4 TESTS

11
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

SEC. 9 INSTRUMENTATION AND CONTROL

9.0 GENERAL

9.0.1 GENERAL

9.0.2 DESIGN DESCRIPTION

9.1 THE AUXILIARY CONTROL SYSTEM

9.1.1 CONTENT

9.1.2 CONFIGURATION

9.2 TECHNICAL DETAIL

9.2.1 SUPERVISORY LAYER

9.2.2 PLC

9.2.3 INSTRUMENTATION

SEC. 10 CIVIL WORKS

10.1 GENERAL ARRANGEMENT AND VERTICAL DESIGN

10.1.1 SITE CONDITIONS

10.1.2 TRAFFIC

10.1.3 GENERAL ARRANGEMENT

10.1.4 VERTICAL DESIGN

10.1.5 ROAD WORK

10.1.6 ENCLOSURE FENCE WORK

10.1.7 ARRANGEMENT OF PIPE LINES IN THE PLANT

10.1.8 LANDSCAPING

10.2 GENERAL DESCRIPTION OF BUILDINGS

12
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

10.2. 1 GENERAL

10.2. 2 STATION SERVICES STRUCTURES

10.3 STRUCTURAL DESIGN PRINCIPIA

10.3.1 GENERAL

10.3.2 LOADS, LOAD COMBINATIONS

10.3.3 DEFLECTION

10.3.4 DESIGN DESCRIPTION

10.4 STRUCTURAL MATERIAL DESCRIPTION

10.4.1 REINFORCED CONCRETE WORK

10.4.2 STRUCTURAL STEEL WORK

10.4.3 GROUT WORK

10.4.4 MISCELLANEOUS AND EMBEDDED METAL WORK

10.4.5 BRICK MASONRY WORK

10.4.6 TESTING

SEC 11 VENTILATION AND AIR CONDITIONING

11.0 GENERAL

11.0.1 GENERAL

11.0.2 SCOPE OF SYSTEM

11.1 REFRIGERATING STATION

11.1.1 GENERAL

11.1.2 SYSTEM DESIGN CRITERIA

11.1.3 SYSTEM DESCRIPTION


13
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

11.2 VENTILATION

11.2.1 GENERAL

11.2.2 SYSTEM DESIGN CRITERIA

11.2.3 SYSTEM DESCRIPTION

11.3 AIR CONDITIONING

11.3.1 GENERAL

11.3.2 AIR CONDITIONING SYSTEM FOR THE AUXILIARY BUILDINGS.

11.4 DUST COLLECTION SYSTEM

ANNEX SPECIFICATION SCHEDULE

14
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

ATTACHED DRAWING LIST

J-03 FLOW DIAGRRAM LIGHT OIL SYSTEM

J-12 FLOW DIAGRRAM COMPRESS AIR SYSTEM

J-15 LEGENDS AND NOTES

J-18 EQUIPMENT LIST

M-01 COAL HANDLING SYSTEM FLOW DIAGRAM

M-02 COAL HANDLING PLANT LAYOUT

M-03 ELEVATION FOR CAOL HANDLING SYSTEM I

M-04 ELEVATION FOR CAOL HANDLING SYSTEM II

C-01 BOTTOM ASH & PYRITES HANDLING SYSTEM FLOW DIAGRAM

C-02 ASH HANDLING SYSTEM DRAWING

D-01 SINGLE LINE DIAGRAM

D-02 AUXILIARY POWER SYSTEM SINGLE LINE DIAGRAM

D-03 220KV SWITCHYARD PROTECTION DIAGRAM

D-04 SCHEMATIC DIAGRAM FOR PROTECTION AND METERING OF


GENERATION SYSTEM

D-05 SCHEMATIC DIAGRAM FOR PROTECTION AND METERING OF SST

D-06 ELECTRIC EQUIPMENT LAYOUT

D-07 PLAN LAYOUT OF 220KV SWITCHYARD

S-01 COOLING WATER SYSTEM DIAGRAM

S-02 HYDRAULIC PROFIEL OF COOLING WATER SYSTEM

15
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

S-03 PLAN ARRANGEMENT OF C.W PUMP HOUSE

S-04 SECTION OF C.W PUMP HOUSE

S-05 BALANCE OF PLANT WATER DEMAND

S-06 ARRANGEMENT OF BOTTOM ASH YARD

S-07 DOMESTIC WASTE WATER TREATMENT SYSTEM DIAGRAM

S-08 ASH LANDFILL RUN-OFF WATER TREATMENT SYSTEM


DIAGRAM

H-01 REVERSE-OSMOSIS SYSTEM FLOW DIAGRAM

H-02 BOILER MAKE –UP WATER TREATMENT SYSTEM FLOW


DIAGRAM

H-05 INDUSTRIAL WASTE WATER TREATMENT SYSTEM FLOW


DIAGRAM

V-01 SEAWATER DESULPHURIZATION PROCESS FLOW DIAGRAM

V-02 FGD PLANT PLOT PLAN

T-01 ADMINISTREATION BUILDING PLAN OF ±0.000m

T-02 ADMINISTREATION BUILDING PLAN OF 4.200m

T-03 ADMINISTREATION BUILDING PLAN OF 7.800m

T-04 ADMINISTREATION BUILDING PLAN OF 11.400m

T-05 ADMINISTREATION BUILDING PLAN EL.15.000m AND SECTION


Ⅰ~Ⅰ

T-06 ELEVATION 1~10OF ADMINISTREATION BUILDING

T-07 ELEVATION 10~1OF ADMINISTREATION BUILDING

T-16 GATE HOUSE OF 0.000m AND SECTIONⅠ-Ⅰ

T-17 ELEVATION 1-8, 8-1,A-E,E-A OF GATE HOUSE

T-22 WAREHOUSE PLAN EL. ±0.000m

16
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

T-23 ELEVATION C-A AND SECTION 1-1 OF WAREHOUSE

T-24 GARAGE PLAN OF ±0.000m

T-25 ELEVATION 1-15 AND SECTION 1-1 OF GARAGE

17
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

SECTION 1 GENERAL DESCRIPTION

1
Puttalam 1X300MW Coal-Fired Power Plant
Balance Of Plant –Volume 2

1. General

1.1 Project Brief

The Puttalam Coal Power Plant will be located near the village of
Panaiyadi on the Kalpitiya Peninsula, approximately 12 km West of the
city of Puttalam. The Project will be a coal fired Power Station, to be
developed in stages with an ultimate planned capacity of 900 MW. The
scope of the first stage covers the installation of the first condensing turbo
generator Unit with a capacity of 300 MW, along with the associated
power transmission system, site infrastructure and auxiliary systems. The
project will also include those facilities for the transport of coal via a jetty
to Site as well as for coal storage and ash disposal.

The start-up boiler, fuel oil pump housing & fuel oil tank, chemical
wastewater treatment system, hydrogen generation system, laboratory for
water , fuel & environment, workshop and the coal handling system except
for the coal yard & coal yard equipment will be constructed in phase I
which can meet up with the requirement of 3×300MW units.

The other common part of power plant such as CW pump house, Water
treatment plant building will be designed and constructed for 1x300 MW
unit

1.2 Site Conditions

See clause1.4 of volume 1-setion 1

1.3 Auxiliary Facilities

There will be repair/maintenance workshop, cargo storage, car parks, staff


housing & multipurpose building in the power station area.
1.4 This package contains coal handling system, ash handling system, water
supply system, chemical water treatment, flue gas desulphurization and
related electric system, I & C.

You might also like