PARKING
BID BULLETION NO. 3
SUBJECT: MINUTES OF PRE-BID MEETING
DATE: 20 DECEMBER 2018
1 Note:
For gas farm, contractor to provide a
location / space on the design. All gas
pipeworks are all excluded (will be
supplied with specialty contractor by
FLI).
ACKNOWLEDGEMENT
3 issued on 20 December 2018 and confirm that we will comply fully with the
_____________________________________
Signature and Company Stamp of [Bidder]
_____________________________________
Date