MANAGEMENT TEAM
ON
ASH HANDLING PLANT
MEMBERS:
R K OJHA, LEADER
ROMIT MOHAPATRA,
MEMBER
K V REDDI, MEMBER
BOILERS: TURBOGENERATORS:
Make – M/s BHEL Make – M/s BHEL
Capacity – 4 Boilers of 200TPH Capacity – 4 TGs’ of 18.5MW
– 1 Boiler of 250TPH Type - Extraction back
Type - VU40, Bi-drum, natural pressure TG
circulation, oil/ p.f. fired, fixed Higher cycle efficiency due to
tangential corner fired co-generation
PROCESS FLOW DIAGRAM
FUEL
STEAM
AIR BOILER FLUE GAS
CHIMNEY
ECONOMISER
ASH POND
6
PRAYASH QC
WET ASH DISPOSAL SYSTEM
STREAM#6
BOTTOM
ASH HOPPER STREAM#4
BLR #4
BOILER
BLOW
BLR #3 DOWN
STREAM#3
BLR #2 ECONOMISER
STREAM#2
STAGE
2
STAGE
1 LINE - 1 5 2 3 4
7
PRAYASH QC
ASH DISPOSAL PUMP HOUSE
ASH SLURRY PUMP
ASH POND
UPGRADATION
OF
ASH SLURRY PUMPS
ASH DISPOSAL PUMP HOUSE
ADPH-I ADPH-II
• NO. OF STREAMS : 03 • NO. OF STREAMS : 03
• ASH SLURRY PUMPS: 09NOS • ASH SLURRY PUMPS: 09NOS
• SERIES PUMPING • SERIES PUMPING
• CAPACITY: 635M3/HR • CAPACITY: 350M3/HR
• HEAD: 44MTRS • HEAD: 50MTRS
• MOTOR: 150KW • MOTOR: 110KW
ADPH-I
UPGRADATION OF ASH SLURRY PUMP
IN
STREAM-1 OF OLD ADPH
• EFFICIENCY INCREASED BY 9%