1. SEPARATE 2. AVOID DAMAGE
Separate contaminants. Contaminants will damage
other equipment.
*pumps
*valves
2
Screening
3
Assumptions
Approach velocity, Inclination Peak Factor
va
60˚ 2.5
0.6 m/s
4
Design
Area available for D W
flow
0.51 m 0.34 m
0.15 m2
S=3 cm
Anet=0.15 m2
No of bars in the
screen, n
8
Tbar= 1 cm
5
Grit Chamber
6
Assumptions
Ratio Source
Depth is 1.5 times Christian, 2006
the width Zaher. nd
7
Design
Area Dimensions Volume