GOVERNMENT OF TAMIL NADU
HIGHWAYS DEPARTMENT
SCHEDULE OF RATES
BASIC RATES
(EXCLUDING GST & OTHER TAXES)
2019-2020
(WITH EFFECT FROM 17.06.2019)PROCEEDINGS OF THE DIRECTOR |
HIGHWAYS, GUINDY, CHENNAI- 600 025
PRESENT: THIRU.R.GOTHANDARAMAN, M.E..
Proceedings No. 2744/ TC-II / DG / 2019, Dated 17.06.2019.
Sub: Highways Department ~ Schedule of Rates with Basic Rates
for the year 2019 - 2020 for adoption in the preparation of
estimates with effect from 17.06.2019 - Approved -
Communicated ~ Regarding.
Ref: Engincer-in-Chief, WRD & Chief Engineer (General), PWD,
Chennai-5, Proceedings No. HDO /Sr. DO-2/ SSR 2019-20/ 19020/
2018-1, dated 17.06.2019.
‘The committee for Schedule of Rates has approved the Schedule of
Rates with Basic Rates (exclusive of all taxes and GST) for the year 2019-2020
for Highways Department as below with effect from 17.06.2019.
Rates for Labour:
‘The Basic Rates of labour pertaining to Highways Department for the
year 2019-20 are increased in the range of 14.84% to 20% over that of the
Schedule of Rates with Basic Rates for the year 2018-19 approved by Highways
Department for the categories of Bitumen Heat Master Operator, Bitumen
Raker Man, Mini Hot Mix Plant Operator, Bitumen Sprayer Man, Guniting
Gun Operator, Head Mazdoor, Guniting Plant Operator, Mazdoor-] and
Mazdoor-I as shown in Annexure-1
Rates for IRC Metals:
‘The Basic Rates of IRC metals pertaining to Highways Department for
the year 2019-20 are increased in the range of 5.22% to 5.50% over that of the
Schedule of Rates with Basic Rates for the year 2018-19 approved by Highways
Department as shown in Annexure-I.Conveyance Charges :
The Conve
Charges approved by the Public Works Department
are being adopted every year and the sare Conveyance Table approved by the
Public Works Department for the year 2019-20 has to be followed by Highways
Department also.
1 Conditions :
‘The General note applicable to Highways Department has been
appended and the General note in Public Works Department Schedule of Rates
for the year 2019-20 has also to be followed.
‘The present Schedule of Rates consisting of Basic Rates of Labour and
IRC Metals exclusively for Highways as in Annexure and Conveyance Table will
come into force with effect from 17.06.2019.
The Schedule of Rates with Basic Rates (exclusive of all taxes and GST)
for the year 2019-20 for Highways Department approved by the committee is
herewith forwarded to all the Chief Engineers, Superintending Engineers and
Divisional Engineers. They are requested to communicate the same to their
sub-ordinate officers for adoption,
The receipt of this proceedings along with enclosures shall be
acknowledged.
Encel.: Schedule of Rates with Basic Rates for the year 2019-20.
Sd/-
R.GOTHANDARAMAN, M.E.,
DIRECTOR GENERAL,
HIGHWAYS.
To
‘The Chief Engineer (Highways), Construction & Maintenance, Chennai-25.
The Chief Engineer (Highways), Planning, Designs & Investigation, Chennai-25
‘The Deputy Secretary to Government, Finance Department, Chennai-09.
Copy to
‘The Additional Chief Secretary to Government, Highways and Minor Ports
Department, Chennai - 09