ENGINEERING ESTIMATE
RENCANA ANGGARAN BIAYA
( RAB )

Kegiatan #REF!
Pekerjaan : Pengadaan Mobiler Puskedes
Tahun Anggaran : 2007

HARGA (Rp.)
NO ANALISA URAIAN PEKERJAAN SATUAN VOLUME
SATUAN JUMLAH

A. PEKERJAAN PERSIAPAN
1 Administrasi dan Dokumentasi Ls 1.00 750,000.00 750,000.00
2 Mobilisasi Mobiler Ls 1.00 775,000.00 775,000.00
Sub total (A) 1,525,000.00
B. PENGADAAN MOBILER
1 Tempat Tidur Periksa Buah 4.00 2,000,000.00 8,000,000.00
2 Tangga Tempat Tidur Buah 4.00 150,000.00 600,000.00
3 Lemari Alat Periksa Buah 4.00 1,000,000.00 4,000,000.00
4 Lemari Obat Buah 4.00 1,000,000.00 4,000,000.00
5 Meja 1/2 Biro Buah 4.00 850,000.00 3,400,000.00
6 Meja Alat Periksa Buah 4.00 850,000.00 3,400,000.00
7 Kursi Buah 8.00 220,000.00 1,760,000.00
8 Kursi Panjang Buah 4.00 700,000.00 2,800,000.00
9 Tiang Impus Buah 4.00 400,000.00 1,600,000.00
Sub total (B) 29,560,000.00
C. PENGADAAN PERLENGKAPAN
1 Tempat Sampah Plastik Buah 4.00 30,000.00 120,000.00
2 Kain Horden Lengkap Set 4.00 165,000.00 660,000.00
3 Kasur 1 (Satu) Badan Buah 4.00 300,000.00 1,200,000.00
4 Bantal Buah 4.00 50,000.00 200,000.00
5 Spray + Sarung Bantal Set 4.00 300,000.00 1,200,000.00
Ferlak Kasur Set 4.00 75,000.00 300,000.00
6 Kipas Angin Unit 4.00 400,000.00 1,600,000.00
Sub total (C) 5,280,000.00

REKAPITULASI ANGGARAN BIAYA

Kegiatan #REF!
Pekerjaan : Pengadaan Mobiler Puskedes
Tahun Anggaran : 2007

NO URAIAN PEKERJAAN JUMLAH HARGA

A. PEKERJAAN PERSIAPAN Rp. 1,525,000.00

B. PENGADAAN MOBILER Rp. 29,560,000.00

C. PENGADAAN PERLENGKAPAN Rp. 5,280,000.00

I Real Coast (A + B + C) Rp. 36,365,000.00


II PPn 10 % Rp. 3,636,500.00
III Total Cost Rp. 40,001,500.00
IV Dibulatkan Rp. 40,000,000.00
Terbilang : Empat Puluh Juta Rupiah

Bau-Bau, April 2007


Mengetahui : Konsultan Perencana
Kepala Dinas Kesehatan CV. LAWERO Consultant
Kota Bau-Bau, Pusat Bau-Bau

Dr. H. LA ODE SUDIL BAENU, MM., M.KES. Ir. LM JAMIL MIHI


NIP. 140 239 847 Direktur
-

40,000,000.00 TOTAL COST


-
CV. LAWERO Consultant
Pusat Bau-Bau
Kantor Jl. Yos Sudarso No. 7 Telp. (0402) 25363 Bau-Bau
Studio Jl. Imam Bonjol No. 12 F. Telp.(0402) 26373 HP. 0816 431 8609 Bau-Bau
Kantor Cabang Jl. Bahagia Lrg. Damai No.3 (0401) 395863 Kendari

ENGINEERING ESTIMATE
RENCANA ANGGARAN BIAYA
( RAB )

Kegiatan #REF!
Pekerjaan : Pengadaan Mobiler Polindes
Tahun Anggaran : 2007

HARGA (Rp.)
NO ANALISA URAIAN PEKERJAAN SATUAN VOLUME
SATUAN JUMLAH

A. PEKERJAAN PERSIAPAN
1 Administrasi dan Dokumentasi Ls 1.00 750,000.00 750,000.00
2 Mobilisasi Mobiler Ls 1.00 775,000.00 775,000.00
Sub total (A) 1,525,000.00
B. PENGADAAN MOBILER
1 Tempat Tidur Periksa Buah 4.00 2,000,000.00 8,000,000.00
2 Tangga Tempat Tidur Buah 4.00 150,000.00 600,000.00
3 Lemari Alat Periksa Buah 4.00 1,000,000.00 4,000,000.00
4 Lemari Obat Buah 4.00 1,000,000.00 4,000,000.00
5 Meja 1/2 Biro Buah 4.00 850,000.00 3,400,000.00
6 Meja Alat Periksa Buah 4.00 850,000.00 3,400,000.00
7 Kursi Buah 8.00 220,000.00 1,760,000.00
8 Kursi Panjang Buah 4.00 700,000.00 2,800,000.00
9 Tiang Impus Buah 4.00 400,000.00 1,600,000.00
Sub total (B) 29,560,000.00
C. PENGADAAN PERLENGKAPAN
1 Tempat Sampah Plastik Buah 4.00 30,000.00 120,000.00
2 Kain Horden Lengkap Set 4.00 165,000.00 660,000.00
3 Kasur 1 (Satu) Badan Buah 4.00 300,000.00 1,200,000.00
4 Bantal Buah 4.00 50,000.00 200,000.00
5 Spray + Sarung Bantal Set 4.00 300,000.00 1,200,000.00
Ferlak Kasur Set 4.00 75,000.00 300,000.00
6 Kipas Angin Unit 4.00 400,000.00 1,600,000.00
Sub total (C) 5,280,000.00

REKAPITULASI ANGGARAN BIAYA

Kegiatan #REF!
Pekerjaan : Pengadaan Mobiler Polindes
Tahun Anggaran : 2007

NO URAIAN PEKERJAAN JUMLAH HARGA

A. PEKERJAAN PERSIAPAN Rp. 1,525,000.00

B. PENGADAAN MOBILER Rp. 29,560,000.00

C. PENGADAAN PERLENGKAPAN Rp. 5,280,000.00

I Real Coast (A + B + C) Rp. 36,365,000.00


II PPn 10 % Rp. 3,636,500.00
III Total Cost Rp. 40,001,500.00
IV Dibulatkan Rp. 40,000,000.00
Terbilang : Empat Puluh Juta Rupiah

Bau-Bau, April 2007


Mengetahui : Konsultan Perencana
Kepala Dinas Kesehatan CV. LAWERO Consultant
Kota Bau-Bau, Pusat Bau-Bau

Dr. H. LA ODE SUDIL BAENU, MM., M.KES. Ir. LM JAMIL MIHI


NIP. 140 239 847 Direktur
-

40,000,000.00 TOTAL COST


-
CV. LAWERO Consultant
Pusat Bau-Bau
Kantor Jl. Yos Sudarso No. 7 Telp. (0402) 25363 Bau-Bau
Studio Jl. Imam Bonjol No. 12 F. Telp.(0402) 26373 HP. 0816 431 8609 Bau-Bau
Kantor Cabang Jl. Bahagia Lrg. Damai No.3 (0401) 395863 Kendari

DAFTAR HARGA SATUAN MOBILER

Kegiatan : Kegiatan Peningkatan Sarana dan Prasarana Fisik Kesehatan Kota Bau-Bau
Pekerjaan : Pengadaan Mobiler Polindes
: Pengadaan Mobiler Puskedes
Lokasi : Tersebar Diwilayah kota Bau-Bau
Tahun Anggaran : 2007

No JENIS BAHAN/UPAH SATUAN HARGA (Rp)


1 2 3 4
HARGA SATUAN MOBILER DAN PERLENGKAPAN

1 Tempat Tidur Periksa Buah 2,000,000.00


2 Tangga Tempat Tidur Buah 150,000.00
3 Lemari Alat Periksa Buah 1,000,000.00
4 Lemari Obat Buah 1,000,000.00
5 Meja 1/2 Biro Buah 850,000.00
6 Meja Alat Periksa Buah 850,000.00
7 Kursi Buah 220,000.00
8 Kursi Panjang Buah 700,000.00
9 Tiang Impus Buah 400,000.00
10 Tempat Sampah Plastik Buah 30,000.00
11 Kain Horden Lengkap Set 165,000.00
12 Kasur 1 (Satu) Badan Buah 300,000.00
13 Bantal Buah 50,000.00
14 Spray + Sarung Bantal Set 300,000.00
15 Ferlak Kasur Set 75,000.00
16 Kipas Angin Unit 400,000.00

Bau-Bau, April 2007

Dibuat Oleh :
CV. LAWERO Consultant
Pusat Bau-Bau

Ir. L.M. JAMIL MIHI


Direktur
###
CV. LAWERO Consultant
Pusat Bau-Bau
Kantor Jl. Yos Sudarso No. 7 Telp. (0402) 25363 Bau-Bau
Studio Jl. Imam Bonjol No. 12 F. Telp.(0402) 26373 HP. 0816 431 8609 Bau-Bau
Kantor Cabang Jl. Bahagia Lrg. Damai No.3 (0401) 395863 Kendari

ENGINEERING ESTIMATE
RENCANA ANGGARAN BIAYA
( RAB )

Kegiatan #REF!
Pekerjaan #REF!
Lokasi : Kecamatan Murhum
Tahun Anggaran : 2007

HARGA (Rp.)
NO ANALISA URAIAN PEKERJAAN SATUAN VOLUME
SATUAN JUMLAH

A. PEKERJAAN PERSIAPAN
1 Administrasi, Dokumentasi dan P3K Ls 1.00 750,000.00 750,000.00
2 Pengukuran dan Pemasangan Bowplank Ls 1.00 300,000.00 300,000.00
3 Papan Nama Proyek Ls 1.00 250,000.00 250,000.00
4 Pek. Barak kerja Ls 1.00 750,000.00 750,000.00
5 Penyediaan Air Bersih Ls 1.00 850,000.00 850,000.00
Sub total (A) 2,900,000.00
B. PEKERJAAN TANAH DAN PASIR
1 0 Galian Tanah Pondasi M3 7.85 - -
Menggali 1 2
M3 Tanah Biasa Sedalam
Urugan Tanah
3 Meter
Kembali M3 1.96 - -
3 0 Timbunan Tanah Bawah Lantai M3 3.00 - -
4 0 Urugan Pasir Bawah Lantai M3 0.53 - -
Sub total (B) -
C. PEKERJAAN PASANGAN DAN BETON
1 0 Pasangan Pondasi Batu Gunung 1 : 5 M3 7.20 - -
2 0 Pas. Batu Bata 1 : 5 M2 190.46 - -
3 0 Pas. Sloop 12 x 15 Cm. 1 Pc : 2 Psr : 3 Krl M3 0.86 #REF! #REF!
4 0 Pek. Kolom 20 x 20 Cm 1 : 2 : 3 M3 0.15 - -
5 0 Pek. Kolom 12 x 12 Cm 1 : 2 : 3 M3 1.29 - -
Memasang 10
6 Kg Jaring KawatPek.
BajaRing
/ Wire
Balk
Mesh
12 x 15 Cm, 1 : 2 : 3 M3 1.58 - -
7Jumlah Total Harga
Pek. Plesteran Dinding 1 Pc : 5 Psr M2 380.92 #REF! #REF!
8 0 Pek. Plesteran Kolom 1 Pc : 3 Psr M2 6.08 - -
9 0 Pek. Beton Floor T = 7 Cm M2 11.26 - -
10 - Pas. Lantai Keramik 30/30 cm M2 24.99 - -
Sub total (C) #REF!
D. PEKERJAAN KUSEN, PINTU/JENDELA
1 #REF! Pek. Kusen Pintu/Jendela M3 1.88 - -
2 0 Pas. Kaca Polos 5 mm Jendela M2 16.65 - -
3 0 Pas. Jalusi Kap M2 5.37 - -
4 0 Pek. Bingkai Jendela Kaca M2 10.85 - -
5 0 Pek. Daun Pintu Panil Kls 1 M2 22.39 - -
Sub total (D) -
E. PEKERJAAN RANGKA ATAP DAN ATAP
1 0 Pek. Kuda-Kuda/Nok Kayu 6/12 M3 2.55 - -
2 0 Pek. Gording, Balok Apit & Skoor Angin 6/12 M3 3.50 - -
3 0 Pek. Konsol 6/12 M3 0.42 - -
4 0 Pek. List Plank 2 x 2/20 M' 110.00 - -
5 0 Pek. Pas. Atap Genteng Metal M2 387.57 - -
6 0 Pek. Pas. Nok Atap Genteng Metal M' 47.50 - -
7 0 Pek. Pas. Karet Talang Atap M' 26.00 - -
8Jumlah Total Harga
Pek. Pas. Kaso/Reng M2 387.57 #REF! #REF!
9 0 Pek. Pas Papan Ampig M2 8.82 - -
10 Aksesories Atap Ls 1.00 300,000.00 300,000.00
11 Angker/Mur/Baut Ls 1.00 250,000.00 250,000.00
Sub total (E) #REF!
F. PEKERJAAN RANGKA PLAPON DAN PLAPON
t 1 M3 Beton Mutu F'c =
1 12,2 Mpa ( K 150Pek.
), Slump
Rangka( 12Plapon
± 2 ) cm
Dalam
, W/C
Ruangan
= 0.72 M2 167.06 - -
2 #REF! Pek. Plapon Tripleks 3 mm Dalam Ruangan M2 167.06 - -
t 1 M3 Beton Mutu F'c =
3 12,2 Mpa ( K 150Pek.
), Slump
Rangka( 12Plapon
± 2 ) cm
Luar
, W/C
Ruangan
= 0.72 M2 30.60 - -
4 #REF! Pek. Plapon Tripleks 3 mm Luar Ruangan M2 30.60 - -
5 0 Pek. List Plapon Profil M' 195.55 - -
Sub total (F) -

HARGA (Rp.)
NO ANALISA URAIAN PEKERJAAN SATUAN VOLUME
SATUAN JUMLAH
G. PEKERJAAN ALAT-ALAT GANTUNG
1 0 Pasangan Kunci Tanam 2 Slag Buah 13.00 - -
2 0 Pasangan Engsel Pintu Kuningan Buah 42.00 - -
3 0 Pasangan Engsel Jendela Kuningan Buah 40.00 #REF! #REF!
4 0 Pasangan Grendel Pintu Buah 14.00 - -
5 0 Pasangan Grendel Jendela Buah 40.00 - -
6 #REF! Pasangan Kait Angin Buah 40.00 - -
Sub total (G) #REF!
H. PEKERJAAN MENGECAT DAN FINISHING
1 0 Pek. Plamur + Cat Tembok M2 387.00 #REF! #REF!
2 #REF! Pek. Cat Plapon M2 167.06 - -
3 0 Pek. Pengecatan Kusen M2 87.10 - -
4 0 Pengecatan Jalusi M2 5.37 - -
5 0 Pek. Vernis Daun Pintu M2 44.78 - -
6 0 Pek. Cat Kilap Listplank M2 38.50 - -
7 Pembersihan Kembali Sisa Pekerjaan Ls 1.00 350,000.00 350,000.00
Sub total (H) #REF!

Bau-Bau, April 2007


Diperiksa : Konsultan Perencana
Kepala Dinas Pekerjaan Umum dan CV. LAWERO Consultant
Prasarana Wilayah Kota Bau - Bau Pusat Bau-Bau

Ir. SUNARYO MULYO, MT Ir. LM JAMIL MIHI


NIP. 110 046 604 Direktur

Mengetahui :
Kepala Kantor Dinas Kesehatan
Kota Bau-Bau

Dr. H. LA ODE SUDIL BAENU, MM. M.KES


NIP. 140 239 847
CV. LAWERO Consultant
Pusat Bau-Bau
Kantor Jl. Yos Sudarso No. 7 Telp. (0402) 25363 Bau-Bau
Studio Jl. Imam Bonjol No. 12 F. Telp.(0402) 26373 HP. 0816 431 8609 Bau-Bau
Kantor Cabang Jl. Bahagia Lrg. Damai No.3 (0401) 395863 Kendari

ENGINEERING ESTIMATE
REKAPITULASI ANGGARAN BIAYA

Kegiatan #REF!
Pekerjaan #REF!
Lokasi : Kecamatan Murhum
Tahun Anggaran : 2007

NO URAIAN PEKERJAAN JUMLAH HARGA

A. PEKERJAAN PERSIAPAN Rp. 2,900,000.00


B. PEKERJAAN TANAH DAN PASIR Rp. -
C. PEKERJAAN PASANGAN DAN BETON Rp. #REF!
D. PEKERJAAN KUSEN, PINTU/JENDELA Rp. -
E. PEKERJAAN RANGKA ATAP DAN ATAP Rp. #REF!
F. PEKERJAAN RANGKA PLAPON DAN PLAPON Rp. -
G. PEKERJAAN ALAT-ALAT GANTUNG Rp. #REF!
H. PEKERJAAN MENGECAT DAN FINISHING Rp. #REF!

I Real Coast (A+B+C+D+E+F+G+H) Rp. #REF!


II PPn 10 % Rp. #REF!
III IMB 2 % Rp. #REF!
IV Total Cost Rp. #REF!
V Dibulatkan Rp. #REF!
Terbilang : Seratus Tujuh Puluh Empat Juta Rupiah

Bau-Bau, April 2007


Diperiksa : Konsultan Perencana
Kepala Dinas Pekerjaan Umum dan CV. LAWERO Consultant
Prasarana Wilayah Kota Bau - Bau Pusat Bau-Bau

Ir. SUNARYO MULYO, MT Ir. LM JAMIL MIHI


NIP. 110 046 604 Direktur

Mengetahui :
Kepala Kantor Dinas Kesehatan
Kota Bau-Bau

Dr. H. LA ODE SUDIL BAENU, MM. M.KES


NIP. 140 239 847
667.12

Ring Balok 10/15 R.b 10/12

#REF!
#REF!

30.60
30.60
174,000,000.00 TOTAL COST
#REF!

34,800,000
CV. LAWERO Consultant
Pusat Bau-Bau
Kantor Jl. Yos Sudarso No. 7 Telp. (0402) 25363 Bau-Bau
Studio Jl. Imam Bonjol No. 12 F. Telp.(0402) 26373 HP. 0816 431 8609 Bau-Bau
Kantor Cabang Jl. Bahagia Lrg. Damai No.3 (0401) 395863 Kendari

ENGINEERING ESTIMATE
RENCANA ANGGARAN BIAYA
( RAB )

Kegiatan #REF!
Pekerjaan #REF!
Lokasi : Kecamatan Wolio
Tahun Anggaran : 2007

HARGA (Rp.)
NO ANALISA URAIAN PEKERJAAN SATUAN VOLUME
SATUAN JUMLAH

A. PEKERJAAN PERSIAPAN
1 Administrasi, Dokumentasi dan P3K Ls 1.00 750,000.00 750,000.00
2 Pengukuran dan Pemasangan Bowplank Ls 1.00 300,000.00 300,000.00
3 Papan Nama Proyek Ls 1.00 250,000.00 250,000.00
4 Pek. Barak kerja Ls 1.00 750,000.00 750,000.00
5 Penyediaan Air Bersih Ls 1.00 750,000.00 750,000.00
Sub total (A) 2,800,000.00
B. PEKERJAAN TANAH DAN PASIR
1 0 Galian Tanah Pondasi M3 3.51 - -
Menggali 1 2
M3 Tanah Biasa Sedalam
Urugan Tanah
3 Meter
Kembali M3 0.88 - -
3 0 Timbunan Tanah Bawah Lantai M3 10.20 - -
4 0 Urugan Pasir Bawah Lantai M3 0.83 - -
5 0 Urugan Pasir Bawah Pondasi M3 0.36 - -
6 0 Pas. Batu Kosong M3 1.41 - -
Sub total (B) -
C. PEKERJAAN PASANGAN DAN BETON
1 0 Pasangan Pondasi Batu Gunung 1 : 5 M3 2.88 - -
2 0 Pas. Batu Bata 1 : 5 M2 45.61 - -
3 0 Pek. Beton Floor T = 7 Cm M2 16.64 - -
4 - Pas. Lantai Keramik 30/30 cm M2 16.64 - -
5 0 Pas. Lantai / Dinding Keramik 20/25 M2 44.14 - -
6 0 Pas. Sloop 12 x 15 Cm. 1 Pc : 2 Psr : 3 Krl M3 0.32 #REF! #REF!
7 0 Pek. Kolom 12 x 12 Cm 1 : 2 : 3 M3 0.27 - -
8 0 Pek. Kolom 20 x 20 Cm 1 : 2 : 3 M3 0.07 - -
9 0 Pek. Ring Balk 10 x 12 Cm, 1 : 2 : 3 M' 17.50 - -
10Jumlah Total Harga
Pek. Plesteran Dinding 1 Pc : 5 Psr M2 91.22 #REF! #REF!
11 0 Pek. Plesteran Kolom 1 Pc : 3 Psr M2 1.44 - -
12 0 Pek. Plesteran Pondasi 1 Pc : 3 Psr M2 1.45 - -
13 0 Pek. Meja Beton M3 0.33 - -
Sub total (C.) #REF!
D. PEKERJAAN KUSEN, PINTU/JENDELA
1 #REF! Pek. Kusen Pintu/Jendela M3 0.19 - -
2 0 Pas. Kaca Polos 5 mm Jendela M2 3.01 - -
3 0 Pek. Bingkai Jendela Kaca M2 2.21 - -
4 0 Pek. Daun Pintu Panil Kls 1 M2 1.93 - -
Sub total (D) -
E. PEKERJAAN RANGKA ATAP DAN ATAP
1 0 Pek. Kuda-Kuda/Nok Kayu 6/12 M3 0.17 - -
2 0 Pek. Gording, Balok Apit & Skoor Angin 6/12 M3 0.34 - -
3 0 Pek. List Plank 2x2/20 M' 26.60 - -
4 0 Pek. Pas. Atap Genteng Metal M2 42.40 - -
5Jumlah Total Harga
Pek. Pas. Kaso/Reng M2 42.00 #REF! #REF!
6 Angker/Mur/Baut Ls 1.00 300,000.00 300,000.00
Sub total (E) #REF!
F. PEKERJAAN RANGKA PLAPON DAN PLAPON
M3 Beton Mutu F'c =
1 12,2 Mpa ( K 150Pek.
), Slump
Rangka( 12Plapon
± 2 ) cm , W/C = 0.72 M2 40.81 - -
2 #REF! Pek. Plapon Tripleks 3 mm M2 40.81 - -
3 0 Pek. List Plapon Profil M' 61.16 - -
Sub total (F) -

HARGA (Rp.)
NO ANALISA URAIAN PEKERJAAN SATUAN VOLUME
SATUAN JUMLAH
G. PEKERJAAN ALAT-ALAT GANTUNG
1 0 Pasangan Kunci Tanam 2 Slag Buah 1.00 - -
2 0 Pasangan Engsel Pintu Kuningan Buah 3.00 - -
3 0 Pasangan Engsel Jendela Kuningan Buah 8.00 #REF! #REF!
4 0 Pasangan Grendel Pintu Buah 1.00 - -
5 0 Pasangan Grendel Jendela Buah 4.00 - -
6 #REF! Pasangan Kait Angin Buah 8.00 - -
Sub total (G) #REF!
H. PEKERJAAN SANITASI
1 Bekisting ) Pasangan Wastafel (Lengkap) Bh 1.00 - -
Sub total (H) -
I. PEKERJAAN INSTALASI LISTRIK
1 Pasangan Titik Lampu Bh 6.00 #REF! #REF!
2 Lampu TL 20 Watt Bh 2.00 #REF! #REF!
3 Lampu SL 40 Watt Bh 2.00 #REF! #REF!
4 Stop Kontak Bh 1.00 #REF! #REF!
5 Fitting Plafond Bh 2.00 #REF! #REF!
6 Saklar Ganda Bh 2.00 #REF! #REF!
Sub total (I) #REF!
K. PEKERJAAN MENGECAT DAN FINISHING
1 0 Pek. Plamur + Cat Tembok M2 92.66 #REF! #REF!
2 #REF! Pek. Cat Plapon M2 40.81 - -
3 0 Pek. Pengecatan Kusen M2 7.19 - -
4 0 Pek. Vernis Daun Pintu/Daun Jendela M2 3.86 - -
5 0 Pek. Cat Kilap Listplank M2 6.65 - -
ing Bata Merah Ukuran
6 ( 5 x 11 x 22 ) cm
Pek.Tebal
Residu
1 Bata
Rangka
, Campuran
Atap Spesi 1 PC : 3 PP M2 25.80 - -
7 Pek. Bak Resapan Ls 1.00 1,500,000.00 1,500,000.00
8 Pembersihan Kembali Sisa Pekerjaan Ls 1.00 350,000.00 350,000.00
Sub total (K) #REF!

PEMBUATAN PAGAR
B. PEKERJAAN TANAH DAN PASIR
1 0 Galian Tanah Pondasi M3 30.04 - -
Menggali 1 2
M3 Tanah Biasa Sedalam
Urugan Tanah
3 Meter
Kembali M3 7.51 - -
3 0 Urugan Pasir M3 3.78 - -
Sub total (B) -
C. PEKERJAAN PASANGAN DAN BETON
1 0 Pasangan Batu Kosong M3 10.92 - -
2 0 Pasangan Pondasi Batu Gunung 1 : 5 M3 22.45 - -
3 0 Pas. Dinding Batu Bata 1 : 5 M2 96.44 - -
4 0 Pas. Batu Gunung 5/7 M3 2.80 - -
5 0 Pas. Sloop 15 x 20 Cm. 1 Pc : 2 Psr : 3 Krl M3 2.18 #REF! #REF!
6 0 Pas. Sloop 20 x 20 Cm. 1 Pc : 2 Psr : 3 Krl M3 1.14 #REF! #REF!
7 0 Pek. Kolom 20 x 20 Cm 1 : 2 : 3 M3 1.91 - -
8 0 Pek. Kolom 20 x 40 Cm 1 : 2 : 3 M3 1.38 - -
Memasang 109 Kg Jaring KawatPek.
BajaRing
/ Wire
Balk
Mesh
8 x 26 Cm, 1 : 2 : 3 M3 0.52 - -
10 0 Pek. Ring Balk 10 x 15 Cm, 1 : 2 : 3 M' 72.80 - -
11Jumlah Total Harga
Pek. Plesteran Dinding Batu Bata 1 Pc : 5 Psr M2 192.88 #REF! #REF!
12 0 Pek. Plesteran Kolom 1 Pc : 3 Psr M2 91.16 - -
13 0 Pek. Plesteran Pondasi 1 Pc : 3 Psr M2 27.09 - -
14Jumlah Total Harga
Pek. Beton Tumbuk 1 : 3 : 5 M3 6.48 - -
15Jumlah Total Harga
Pek. Rabat Beton 1 : 3 : 5 M3 1.05 - -
16 Pek. Pasangan Paving Block M2 171.83 - -
Sub total (C) #REF!
J. PEKERJAAN PAGAR BESI
1 0 Pek. Pemasangan Pagar Besi 2" M' 30.24 - -
2Jumlah Total Harga
Pek. Pemasangan Pagar Besi 1" M' 49.76 - -
Sub total (J) -
K. PEKERJAAN MENGECAT DAN FINISHING
1 - Pek. Plamur + Cat Tembok M2 284.04 #REF! #REF!
2 - Pek. Cat Kilap Pagar M2 2.50 - -
Sub total (k) #REF!

PAPAN NAMA KANTOR


B. PEKERJAAN TANAH DAN PASIR
1 0 Galian Tanah Pondasi M3 1.50 - -
Menggali 1 2
M3 Tanah Biasa Sedalam
Urugan Tanah
3 Meter
Kembali M3 0.38 - -
3 0 Urugan Pasir M3 0.13 - -
Sub total (B) -
C. PEKERJAAN PASANGAN DAN BETON
1 0 Pasangan Batu Kosong M3 0.53 - -
2 0 Pasangan Pondasi Batu Gunung 1 : 5 M3 1.00 - -
3 0 Pas. Dinding Batu Bata 1 : 5 M2 3.73 - -
4 0 Pas. Batu Gunung 5/7 M3 0.28 - -
5 0 Pas. Sloop 20 x 20 Cm. 1 Pc : 2 Psr : 3 Krl M3 0.12 #REF! #REF!
6 0 Pek. Kolom 20 x 40 Cm 1 : 2 : 3 M3 0.36 - -
Memasang 107 Kg Jaring KawatPek.
BajaRing
/ Wire
Balk
Mesh
8 x 26 Cm, 1 : 2 : 3 M3 0.06 - -
8 0 Pek. Ring Balk 10 x 15 Cm, 1 : 2 : 3 M' 3.41 - -
9Jumlah Total Harga
Pek. Plesteran Dinding Batu Bata 1 Pc : 5 Psr M2 3.73 #REF! #REF!
10 0 Pek. Plesteran Kolom 1 Pc : 3 Psr M2 5.28 - -
11 0 Pek. Plesteran Pondasi 1 Pc : 3 Psr M2 2.31 - -
12 0 Pas. Lantai Dinding Tegel 20/25 M2 3.73 - -
Sub total (C) #REF!
K. PEKERJAAN MENGECAT DAN FINISHING
1 - Pek. Plamur + Cat Tembok M2 9.01 #REF! #REF!
2 Pek. Penulisan Nama dan Logo Ls 1.00 300,000.00 300,000.00
Sub total (K) #REF!

Bau-Bau, April 2007


Diperiksa : Konsultan Perencana
Kepala Dinas Pekerjaan Umum dan CV. LAWERO Consultant
Prasarana Wilayah Kota Bau - Bau Pusat Bau-Bau

Ir. SUNARYO MULYO, MT Ir. LM JAMIL MIHI


NIP. 110 046 604 Direktur

Mengetahui :
Kepala Kantor Dinas Kesehatan
Kota Bau-Bau

Dr. H. LA ODE SUDIL BAENU, MM. M.KES


NIP. 140 239 847
CV. LAWERO Consultant
Pusat Bau-Bau
Kantor Jl. Yos Sudarso No. 7 Telp. (0402) 25363 Bau-Bau
Studio Jl. Imam Bonjol No. 12 F. Telp.(0402) 26373 HP. 0816 431 8609 Bau-Bau
Kantor Cabang Jl. Bahagia Lrg. Damai No.3 (0401) 395863 Kendari

ENGINEERING ESTIMATE
REKAPITULASI ANGGARAN BIAYA

Kegiatan #REF!
Pekerjaan #REF!
Lokasi : Kecamatan Wolio
Tahun Anggaran : 2007

NO URAIAN PEKERJAAN JUMLAH HARGA

A. PEKERJAAN PERSIAPAN Rp. 2,800,000.00


B. PEKERJAAN TANAH DAN PASIR Rp. -
C. PEKERJAAN PASANGAN DAN BETON Rp. #REF!
D. PEKERJAAN KUSEN, PINTU/JENDELA Rp. -
E. PEKERJAAN RANGKA ATAP DAN ATAP Rp. #REF!
F. PEKERJAAN RANGKA PLAPON DAN PLAPON Rp. -
G. PEKERJAAN ALAT-ALAT GANTUNG Rp. #REF!
H. PEKERJAAN SANITASI Rp. -
I. PEKERJAAN INSTALASI LISTRIK Rp. #REF!
J. PEKERJAAN PAGAR BESI Rp. -
K. PEKERJAAN MENGECAT DAN FINISHING Rp. #REF!

I Real Coast (A+B+C+D+E+F+G+H+I+J) Rp. #REF!


II PPn 10 % Rp. #REF!
III IMB 2 % Rp. #REF!
IV Total Cost Rp. #REF!
V Dibulatkan Rp. #REF!

Terbilang : Seratus Empat Puluh Sembilan Juta

Bau-Bau, April 2007


Diperiksa : Konsultan Perencana
Kepala Dinas Pekerjaan Umum dan CV. LAWERO Consultant
Prasarana Wilayah Kota Bau - Bau Pusat Bau-Bau
Ir. SUNARYO MULYO, MT Ir. LM JAMIL MIHI
NIP. 110 046 604 Direktur

Mengetahui :
Kepala Kantor Dinas Kesehatan
Kota Bau-Bau

Dr. H. LA ODE SUDIL BAENU, MM. M.KES


NIP. 140 239 847
#REF!

667.12

#REF!

#REF!

#REF!
#REF!

#REF!

6.105

2.22
3.996
18

0.444

0.37 0.666

#REF!

70.2 0.675
85241719579

#REF!

#REF!
149,000,000.00 TOTAL COST
#REF!
CV. LAWERO Consultant
Pusat Bau-Bau
Kantor Jl. Yos Sudarso No. 7 Telp. (0402) 25363 Bau-Bau
Studio Jl. Imam Bonjol No. 12 F. Telp.(0402) 26373 HP. 0816 431 8609 Bau-Bau
Kantor Cabang Jl. Bahagia Lrg. Damai No.3 (0401) 395863 Kendari

ENGINEERING ESTIMATE
RENCANA ANGGARAN BIAYA
( RAB )

Kegiatan #REF!
Pekerjaan #REF!
Lokasi : Kecamatan Bungi
Tahun Anggaran : 2007

HARGA (Rp.)
NO ANALISA URAIAN PEKERJAAN SATUAN VOLUME
SATUAN JUMLAH

A. PEKERJAAN PERSIAPAN
1 Administrasi, Dokumentasi dan P3K Ls 1.00 750,000.00 750,000.00
2 Pengukuran dan Pemasangan Bowplank Ls 1.00 350,000.00 350,000.00
3 Papan Nama Proyek Ls 1.00 250,000.00 250,000.00
4 Pek. Barak kerja Ls 1.00 725,000.00 725,000.00
5 Penyediaan Air Bersih Ls 1.00 500,000.00 500,000.00
Sub total (A) 2,575,000.00
B. PEKERJAAN TANAH DAN PASIR
1 0 Galian Tanah Pondasi M3 20.69 - -
Menggali 1 2M3 Tanah Biasa Sedalam
Urugan Tanah
3 Meter
Kembali M3 5.17 - -
3 0 Urugan Tanah Didatangkan M3 23.04 - -
4 0 Urugan Pasir M3 1.78 - -
Sub total (B) -
C. PEKERJAAN PASANGAN DAN BETON
1 0 Pasangan Batu Kosong M3 7.10 - -
2 0 Pasangan Pondasi Batu Gunung 1 : 5 M3 15.73 - -
3 0 Pas. Dinding Batu Bata 1 : 5 M2 129.31 - -
4 0 Pas. Batu Gunung 5/7 M3 1.40 - -
5 0 Pas. Sloop 15 x 20 Cm. 1 Pc : 2 Psr : 3 Krl M3 2.32 #REF! #REF!
6 0 Pek. Kolom 20 x 20 Cm 1 : 2 : 3 M3 2.12 - -
7 0 Pek. Kolom 20 x 40 Cm 1 : 2 : 3 M3 1.10 - -
8 0 Pek. Ring Balk 8 x 26 Cm, 1 : 2 : 3 M3 0.30 - -
9 0 Pek. Ring Balk 10 x 15 Cm, 1 : 2 : 3 M' 63.00 - -
10Jumlah Total Harga
Pek. Plesteran Dinding Batu Bata 1 Pc : 5 Psr M2 258.62 #REF! #REF!
11 0 Pek. Plesteran Kolom 1 Pc : 3 Psr M2 39.81 - -
12 0 Pek. Plesteran Pondasi 1 Pc : 3 Psr M2 46.38 - -
Sub total (C) #REF!
D. PEKERJAAN PAGAR BESI
1 0 Pek. Pemasangan Pagar Besi 2" M' 13.12 - -
2Jumlah Total Harga
Pek. Pemasangan Pagar Besi 1" M' 24.66 - -
3 Pek. Pintu Pagar Besi Terpasang M2 14.00 375,000.00 5,250,000.00
Sub total (D) 5,250,000.00
E. PEKERJAAN MENGECAT DAN FINISHING
1 0 Pek. Plamur + Cat Tembok M2 298.43 #REF! #REF!
2 - Pek. Cat Kilap Pagar M2 2.70 - -
3 Pembersihan Kembali Sisa Pekerjaan Ls 1.00 350,000.00 350,000.00
Sub total (E) #REF!

Bau-Bau, April 2007


Diperiksa : Konsultan Perencana
Kepala Dinas Pekerjaan Umum dan CV. LAWERO Consultant
Prasarana Wilayah Kota Bau - Bau Pusat Bau-Bau

Ir. SUNARYO MULYO, MT Ir. LM JAMIL MIHI


NIP. 110 046 604 Direktur

Mengetahui :
Kepala Kantor Dinas Kesehatan
Kota Bau-Bau

Dr. H. LA ODE SUDIL BAENU, MM., M. KES


NIP. 140 234 847
CV. LAWERO Consultant
Pusat Bau-Bau
Kantor Jl. Yos Sudarso No. 7 Telp. (0402) 25363 Bau-Bau
Studio Jl. Imam Bonjol No. 12 F. Telp.(0402) 26373 HP. 0816 431 8609 Bau-Bau
Kantor Cabang Jl. Bahagia Lrg. Damai No.3 (0401) 395863 Kendari

ENGINEERING ESTIMATE
REKAPITULASI ANGGARAN BIAYA

Kegiatan #REF!
Pekerjaan #REF!
Lokasi : Kecamatan Bungi
Tahun Anggaran : 2007

NO URAIAN PEKERJAAN JUMLAH HARGA

A. PEKERJAAN PERSIAPAN Rp. 2,575,000.00


B. PEKERJAAN TANAH DAN PASIR Rp. -
C. PEKERJAAN PASANGAN DAN BETON Rp. #REF!
D. PEKERJAAN PAGAR BESI Rp. 5,250,000.00
E. PEKERJAAN MENGECAT DAN FINISHING Rp. #REF!

I Real Coast (A+B+C+D+E) Rp. #REF!


II PPn 10 % Rp. #REF!
III IMB 2% Rp. #REF!
IV Total Cost Rp. #REF!
V Dibulatkan Rp. #REF!

Terbilang : Tujuh Puluh Empat Juta Rupiah

Bau-Bau, April 2007


Diperiksa : Konsultan Perencana
Kepala Dinas Pekerjaan Umum dan CV. LAWERO Consultant
Prasarana Wilayah Kota Bau - Bau Pusat Bau-Bau

Ir. SUNARYO MULYO, MT Ir. LM JAMIL MIHI


NIP. 110 046 604 Direktur

Mengetahui :
Kepala Kantor Dinas Kesehatan
Kota Bau-Bau

Dr. H. LA ODE SUDIL BAENU, MM., M. KES


NIP. 140 234 847
#REF!
19.62
4.91
28.80
1.68

6.74
13.34
61.31 1.5 5.85 2.00 3.00 73.655
1.40
1.85
0.93
1.13
0.30
33.33
122.62
20.97
14.72
0.40 #REF!
TOTAL COST
74,000,000.00

#REF!
CV. LAWERO Consultant
Pusat Bau-Bau
Kantor Jl. Yos Sudarso No. 7 Telp. (0402) 25363 Bau-Bau
Studio Jl. Imam Bonjol No. 12 F. Telp.(0402) 26373 HP. 0816 431 8609 Bau-Bau
Kantor Cabang Jl. Bahagia Lrg. Damai No.3 (0401) 395863 Kendari

ENGINEERING ESTIMATE
RENCANA ANGGARAN BIAYA
( RAB )

Kegiatan #REF!
Pekerjaan #REF!
Lokasi : Kecamatan Wolio
Tahun Anggaran : 2007

HARGA (Rp.)
NO ANALISA URAIAN PEKERJAAN SATUAN VOLUME
SATUAN JUMLAH

A. PEKERJAAN PERSIAPAN
1 Administrasi, Dokumentasi dan P3K Ls 1.00 750,000.00 750,000.00
2 Pengukuran dan Pemasangan Bowplank Ls 1.00 250,000.00 250,000.00
3 Papan Nama Proyek Ls 1.00 250,000.00 250,000.00
4 Pek. Barak kerja Ls 1.00 550,000.00 550,000.00
5 Penyediaan Air Bersih Ls 1.00 400,000.00 400,000.00
Sub total (A) 2,200,000.00
B. PEKERJAAN TANAH DAN PASIR
1 0 Galian Tanah Pondasi M3 17.63 - -
Menggali 12M3 Tanah Biasa Sedalam
Urugan 3
Tanah
MeterKembali M3 4.41 - -
3 0 Urugan Pasir M3 1.60 - -
Sub total (B) -
C. PEKERJAAN PASANGAN DAN BETON
1 0 Pasangan Batu Kosong M3 6.38 - -
2 0 Pasangan Pondasi Batu Gunung 1 : 5 M3 18.12 - -
3 0 Pas. Dinding Batu Bata 1 : 5 M2 42.50 - -
4 0 Pas. Batu Gunung 5/7 M3 1.12 - -
5 0 Pas. Sloop 15 x 20 Cm. 1 Pc : 2 Psr : 3 Krl M3 0.93 #REF! #REF!
6 0 Pas. Sloop 20 x 20 Cm. 1 Pc : 2 Psr : 3 Krl M3 0.50 #REF! #REF!
7 0 Pek. Kolom 20 x 20 Cm 1 : 2 : 3 M3 0.78 - -
8 0 Pek. Kolom 20 x 40 Cm 1 : 2 : 3 M3 0.81 - -
9 0 Pek. Ring Balk 8 x 26 Cm, 1 : 2 : 3 M3 0.26 - -
10 0 Pek. Ring Balk 10 x 15 Cm, 1 : 2 : 3 M' 31.14 - -
11Jumlah Total Harga
Pek. Plesteran Dinding Batu Bata 1 Pc : 5 Psr M2 85.00 #REF! #REF!
12 0 Pek. Plesteran Kolom 1 Pc : 3 Psr M2 22.40 - -
13 0 Pek. Plesteran Pondasi 1 Pc : 3 Psr M2 25.65 - -
Sub total (C) #REF!
D. PEKERJAAN PAGAR BESI
1 0 Pek. Pemasangan Pagar Besi 2" M' 13.12 - -
2 Jumlah Total Harga
Pek. Pemasangan Pagar Besi 1" M' 22.64 - -
Sub total (D) -
F. PEKERJAAN MENGECAT DAN FINISHING
1 - Pek. Plamur + Cat Tembok M2 107.40 #REF! #REF!
2 - Pek. Cat Kilap Pagar M2 2.50 - -
3 Pembersihan Kembali Sisa Pekerjaan Ls 1.00 300,000.00 300,000.00
Sub total (F) #REF!

PEKERJAAN GAPURA
B. PEKERJAAN TANAH DAN PASIR
1 0 Galian Tanah Pondasi M3 9.45 - -
Menggali 12M3 Tanah Biasa Sedalam
Urugan 3Tanah
MeterKembali M3 2.36 - -
3 0 Urugan Pasir Bawah Pondasi M3 0.45 - -
Sub total (B) -
C. PEKERJAAN PASANGAN DAN BETON
1 Jumlah Total Harga
Beton Tumbuk 1 Ps : 3 Pc : 5 Krk M2 0.86 - -
2 0 Pek. Pondasi Poor dan Kolom 1 : 2 : 3 M3 0.78 - -
3 0 Pas. Sloop 12 x 15 Cm. 1 Pc : 2 Psr : 3 Krl M3 0.07 #REF! #REF!
4 0 Pek. Ring Balk 12 x 15 Cm, 1 : 2 : 3 M3 0.20 - -
5 0 Pek. Plesteran Kolom 1 Pc : 3 Psr M2 15.36 - -
Sub total (C) #REF!

HARGA (Rp.)
NO ANALISA URAIAN PEKERJAAN SATUAN VOLUME
SATUAN JUMLAH
E. PEKERJAAN RANGKA ATAP DAN ATAP
1 0 Pek. Kuda-Kuda/Nok Kayu 6/12 M3 0.23 - -
2 0 Pek. Gording & Skoor Angin 6/12 M3 0.40 - -
3 0 Pek. Konsol 6/12 M3 0.17 - -
4 - Pek. List Plank 2x2/20 M' 36.60 - -
5 0 Pek. Pas. Atap Genteng Metal M2 60.93 - -
6 0 Pek. Pas. Nok Atap Genteng metal M' 4.65 - -
7 Jumlah Total Harga
Pek. Pas. Kaso/Reng M2 60.93 #REF! #REF!
8 0 Pek. Pas. Papan Ampig M2 7.60 - -
9 Aksesories Atap Ls 1.00 200,000.00 200,000.00
10 Angker/Mur/Baut Ls 1.00 150,000.00 150,000.00
Sub total (E) #REF!
F. PEKERJAAN MENGECAT DAN FINISHING
1 0 Pek. Plamur + Cat Kolom M2 15.36 #REF! #REF!
2 0 Pek. Cat Kilap Listplank M2 12.81 - -
Sub total (F) #REF!

PAPAN NAMA KANTOR


B. PEKERJAAN TANAH DAN PASIR
1 0 Galian Tanah Pondasi M3 1.50 - -
Menggali 12M3 Tanah Biasa Sedalam
Urugan 3Tanah
MeterKembali M3 0.38 - -
3 0 Urugan Pasir M3 0.13 - -
Sub total (B) -
C. PEKERJAAN PASANGAN DAN BETON
1 0 Pasangan Batu Kosong M3 0.53 - -
2 0 Pasangan Pondasi Batu Gunung 1 : 5 M3 1.00 - -
3 0 Pas. Dinding Batu Bata 1 : 5 M2 3.73 - -
4 0 Pas. Batu Gunung 5/7 M3 0.28 - -
5 0 Pas. Sloop 20 x 20 Cm. 1 Pc : 2 Psr : 3 Krl M3 0.12 #REF! #REF!
6 0 Pek. Kolom 20 x 40 Cm 1 : 2 : 3 M3 0.36 - -
7 0 Pek. Ring Balk 8 x 26 Cm, 1 : 2 : 3 M3 0.06 - -
8 0 Pek. Ring Balk 10 x 15 Cm, 1 : 2 : 3 M' 3.41 - -
9 Jumlah Total Harga
Pek. Plesteran Dinding Batu Bata 1 Pc : 5 Psr M2 3.73 #REF! #REF!
10 0 Pek. Plesteran Kolom 1 Pc : 3 Psr M2 5.28 - -
11 0 Pek. Plesteran Pondasi 1 Pc : 3 Psr M2 2.31 - -
12 0 Pas. Lantai Dinding Tegel 20/25 M2 3.73 - -
Sub total (C) #REF!
F. PEKERJAAN MENGECAT DAN FINISHING
1 - Pek. Plamur + Cat Tembok M2 9.01 #REF! #REF!
2 Pek. Penulisan Nama dan Logo Ls 1.00 300,000.00 300,000.00
Sub total (J) #REF!
Bau-Bau, April 2007
Diperiksa : Konsultan Perencana
Kepala Dinas Pekerjaan Umum dan CV. LAWERO Consultant
Prasarana Wilayah Kota Bau - Bau Pusat Bau-Bau

Ir. SUNARYO MULYO, MT Ir. LM JAMIL MIHI


NIP. 110 046 604 Direktur

Mengetahui :
Kepala Kantor Dinas Kesehatan
Kota Bau-Bau

Dr. H. LA ODE SUDIL BAENU, MM., M.KES.


NIP. 140 239 847

CV. LAWERO Consultant


Pusat Bau-Bau
Kantor Jl. Yos Sudarso No. 7 Telp. (0402) 25363 Bau-Bau
Studio Jl. Imam Bonjol No. 12 F. Telp.(0402) 26373 HP. 0816 431 8609 Bau-Bau
Kantor Cabang Jl. Bahagia Lrg. Damai No.3 (0401) 395863 Kendari

ENGINEERING ESTIMATE
REKAPITULASI ANGGARAN BIAYA

Kegiatan #REF!
Pekerjaan #REF!
Lokasi : Kecamatan Wolio
Tahun Anggaran : 2007

NO URAIAN PEKERJAAN JUMLAH HARGA

A. PEKERJAAN PERSIAPAN Rp. 2,200,000.00


B. PEKERJAAN TANAH DAN PASIR Rp. -
C. PEKERJAAN PASANGAN DAN BETON Rp. #REF!
D. PEKERJAAN PAGAR BESI Rp. -
E. PEKERJAAN RANGKA ATAP DAN ATAP Rp. #REF!
F. PEKERJAAN MENGECAT DAN FINISHING Rp. #REF!

I Real Coast (A+B+C+D+E) Rp. #REF!


II PPn 10 % Rp. #REF!
III IMB 2 % Rp. #REF!
III Total Cost Rp. #REF!
IV Dibulatkan Rp. #REF!

Terbilang : Enam Puluh Empat Juta Rupiah

Bau-Bau, April 2007


Diperiksa : Konsultan Perencana
Kepala Dinas Pekerjaan Umum dan CV. LAWERO Consultant
Prasarana Wilayah Kota Bau - Bau Pusat Bau-Bau

Ir. SUNARYO MULYO, MT Ir. LM JAMIL MIHI


NIP. 110 046 604 Direktur

Mengetahui :
Kepala Kantor Dinas Kesehatan
Kota Bau-Bau

Dr. H. LA ODE SUDIL BAENU, MM., M.KES.


NIP. 140 239 847
#REF! 0.496
0.9342
1.4302
0.31
0.25792

#REF!
1.93

0.198

0.23
0.40

#REF!
60.94
TOTAL COST
64,000,000.00

#REF!
DAFTAR HARGA SATUAN UPAH DAN BAHAN

Nama Tugas : Quantity Harga Satuan Pembangunan Rumah Tinggal


Mata Kuliah : Anggaran Borongan
Fakultas : Teknik
Prog. Study : Teknik Sipil

No JENIS BAHAN/UPAH SATUAN HARGA (Rp)


1 2 3 4

I HARGA SATUAN UPAH


1 Kepala Tukang OH 65,000.00
2 Mandor OH 70,000.00
3 Pekerja OH 35,000.00
4 Tukang Batu OH 45,000.00
5 Tukang Besi OH 45,000.00
6 Tukang Cat OH 45,000.00
7 Tukang Kayu OH 45,000.00

II BAHAN MATERIAL LOKAL


1 Batu Bata Buah 500.00
2 Batu Gunung M3 187,500.00
3 Kapur Kg 750.00
4 Kerikil M3 187,500.00
5 Pasir Beton M3 108,000.00
6 Pasir Pasangan M3 108,000.00
7 Pasir Urug M3 46,000.00
8 Tanah Urug M3 40,000.00
III BAHAN/MATERIAL
1 Balok Klas I (Bayam, Jati) M3 2,300,000.00
2 Papan Klas I (Bayam, Jati) M3 2,350,000.00
4 Balok Kelas II (Nato, Ete, Uru, Bolongita) M3 930,000.00
5 Papan Klas II (Nato, Ete, Uru, Bolongita) M3 950,000.00
6 Papan Klas III M3 700,000.00
7 List Plafond Kayu M 2,000.00
8 Dolken dia. 8 Cm/4 m Btg 8,500.00
IV BAHAN/MATERIAL TOKO
1 Semen 50 Kg Zak 55,000.00
2 Semen Nat Kg 8,000.00
3 Besi Beton Kg 8,300.00
4 Kawat Bendrat Kg 9,500.00
5 Baut Buah 2,750.00
6 Besi Strip Kuda-Kuda Kg 9,500.00
7 Keramik 10/20 Buah 900.00
8 Keramik 20/25 Buah 2,250.00
9 Keramik 20/20 Buah 1,800.00
10 Keramik 30/30 Buah 4,050.00
11 Keramik 40/40 Buah 7,100.00
12 Tegel Plin Keramik 10/30 Buah 1,350.00
13 Tegel Plin Keramik 20/40 Buah 3,550.00
14 Glass Block (terpasang) Buah 35,000.00
V BAHAN/MATERIAL ATAP
1 Seng Gelombang 90 x 180 cm Lbr 34,000.00
2 Seng Plat 3" x 6 " Lbr 27,600.00
3 Genteng Metal Lbr 40,000.00
4 Nok Genteng Metal Lbr 32,500.00
5 Karet Talang M 6,500.00
VI BAHAN MATERIAL PAKU
1 Paku Campur Kg 10,000.00
2 Paku Seng Kg 13,500.00
3 Paku Tripleks Kg 13,500.00
VII BAHAN/MATERIAL PLAFOND
1 Pafond Gypsum Board 9 mm (Terpasang) M2 140,000.00
2 List Plafond Gypsum Board (Terpasang) M 20,000.00
3 Tripleks 3 mm (120 x 240) cm Lembar 42,000.00
4 Lem Fox Kg 12,500.00
5 Teakwood 4 mm (90 x 220) cm Lembar 35,000.00
6 Plywood Tebal 9 mm Lembar 135,000.00
No JENIS BAHAN/UPAH SATUAN HARGA (Rp)
1 2 3 4

VIII BAHAN/MATERIAL CAT


1 Cat Tembok Kg 7,600.00
2 Cat Kayu Gloteks Kg 30,000.00
3 Many Kayu/Besi Kg 8,500.00
4 Dempul Kayu Kg 7,500.00
5 Minyak Cat Kg 3,000.00
6 Ter Kg 4,500.00
7 Vernis Kg 15,000.00
8 Amplas Kayu Lembar 3,000.00
9 Plamir Tembok Kg 5,000.00
IX BAHAN/MATERIAL PINTU DAN JENDELA
1 Kunci Tanam Buah 95,000.00
2 Engsel Pintu Kuningan Buah 13,000.00
3 Engsel Jendela Kuningan Buah 7,500.00
4 Hak Angin Jendela Buah 5,000.00
5 Grendel Pintu Kuningan Buah 7,500.00
6 Grendel Jendela Kuningan Buah 7,000.00
7 Kaca Polos 5 mm (ASAHI) M2 100,000.00
8 Kaca Patri M2 450,000.00
X BAHAN/ MATERIAL SANITASI
1 Kloset Jongkok Merk INA Buah 95,000.00
2 Kloset Duduk Buah 475,000.00
3 Bak Mandi Fibreglass + Shower Buah 4,000,000.00
4 Wastavel Lengkap INA Buah 492,000.00
5 Bak. Cuci Piring Stainles Steel Buah 450,000.00
6 Water Drain + Asesories Buah 75,000.00
7 Septictank 3 M3 Unit 3,000,000.00
8 Pipa PVC dia. 3" Batang 65,000.00
9 Kran Bebek SUN EUI 1/2" Buah 23,400.00
10 Seal Tape Buah 2,500.00
XI BAHAN/MATERIAL ELEKTRIKAL
1 Pasangan Titik Lampu Ttk 70,000.00
2 Lampu Pijar Batang Philips 23 Watt Buah 45,000.00
3 Lampu Pijar Batang Philips 11 Watt Buah 35,000.00
4 Saklar Broco Tunggal Standard (1 Phase) Buah 10,000.00
5 Saklar Broco Seri Standard (1 Phase) Buah 10,000.00
6 Stop Kontak Broco Standard (1 Phase) Buah 12,500.00
7 Fitting Lampu Buah 5,000.00
8 MCB (terpasang) Buah 65,000.00

Bau-Bau, 27 Januari 2011

Dibuat Oleh :
Mahasiswa

KELOMPOK

Referensi : Harga Bahan Berdasarkan SK Walikota T.A. 2009


748,500,000.00

98,195,108.49

187,500.00

Target 748,500,000.00
98,195,108.49
DAFTAR ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSI
STANDAR NASIONAL INDONESIA ( SNI ) DT 91 - 0006 - 2007
BADAN STANDARISASI NASIONAL ( BSN )
( Konstruksi Bangunan Gedung dan Perumahan )

Nama Tugas : Quantity Harga Satuan Pembangunan Rumah Tinggal


Mata Kuliah : Anggaran Borongan
Fakultas : Teknik
Prog. Study : Teknik Sipil

I.6.1 Menggali 1 M3 Tanah Biasa Sedalam 1 Meter

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )

Pekerja OH 0.750 35,000.00 26,250.00


Tenaga Kerja
Mandor OH - - -
Jumlah Total Harga 26,250.00

I.6.2 Menggali 1 M3 Tanah Biasa Sedalam 2 Meter

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Pekerja OH 0.900 35,000.00 31,500.00
Tenaga Kerja
Mandor OH - -
Jumlah Total Harga 31,500.00

I.6.3 Menggali 1 M3 Tanah Biasa Sedalam 3 Meter

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Pekerja OH 1.050 35,000.00 36,750.00
Tenaga Kerja
Mandor OH - -
Jumlah Total Harga 36,750.00

I.6.4 Menggali 1 M3 Tanah Keras Sedalam 1 Meter

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Pekerja OH 1.000 35,000.00 35,000.00
Tenaga Kerja
Mandor OH - -
Jumlah Total Harga 35,000.00

I.6.5 Menggali 1 M3 Tanah Cadas Sedalam 1 Meter

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Pekerja OH 1.500 35,000.00 52,500.00
Tenaga Kerja
Mandor OH - -
Jumlah Total Harga 52,500.00

I.6.9 Mengurug Kembali 1 M3 Galian ( Dihitung 1/3 kali dari Indeks Pekerjaan Galian )

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Pekerja OH 0.250 35,000.00 8,750.00
Tenaga Kerja
Mandor OH - - -
Jumlah Total Harga 8,750.00

I.6.10 Memadatkan 1 M3 Tanah ( Per 20 cm )

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Pekerja OH 0.500 35,000.00 17,500.00
Tenaga Kerja
Mandor OH - -
Jumlah Total Harga 17,500.00

I.6.11 Mengurug 1 M3 Pasir Urug

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bahan Pasir Urug M3 1.200 46,000.00 55,200.00
Pekerja M3 0.300 35,000.00 10,500.00
Tenaga Kerja
Mandor OH - -
Jumlah Total Harga 65,700.00
I.6.14 Memasang 1 M2 Lapisan Ijuk Tebal 10 cm

Kebutuhan Satuan Indeks Jumlah Harga ( Rp )


Bahan Ijuk Kg 6.000 6,000.00 36,000.00
Pekerja OH 0.150 35,000.00 5,250.00
Tenaga Kerja
Mandor OH - -
Jumlah Total Harga 41,250.00

I.6.15 Mengurug 1 M3 Sirtu Padat Untuk Peninggian Lantai Bangunan

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bahan Pasir Batu M3 1.200 108,000.00 129,600.00
Pekerja OH 0.250 35,000.00 8,750.00
Tenaga Kerja
Mandor OH - -
Jumlah Total Harga 138,350.00

II.6.1 Memasang 1 M3 Pondasi Batu Belah , Campuran 1 PC : 3 PP

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Batu Belah 15/20 cm M3 1.200 187,500.00 225,000.00
Bahan Portland Cemen Zak 4.040 55,000.00 222,200.00
Pasir Pasang M3 0.485 108,000.00 52,380.00
Pekerja OH 1.500 35,000.00 52,500.00
Tukang Batu OH 0.750 45,000.00 33,750.00
Tenaga Kerja
Kepala Tukang OH 0.075 65,000.00 4,875.00
Mandor OH - -
Jumlah Total Harga 590,705.00

II.6.2 Memasang 1 M3 Pondasi Batu Belah , Campuran 1 PC : 4 PP

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Batu Belah 15/20 cm M3 1.200 187,500.00 225,000.00
Bahan Portland Cemen Zak 3.260 55,000.00 179,300.00
Pasir Pasang M3 0.520 108,000.00 56,160.00
Pekerja OH 1.500 35,000.00 52,500.00
Tukang Batu OH 0.750 45,000.00 33,750.00
Tenaga Kerja
Kepala Tukang OH 0.075 65,000.00 4,875.00
Mandor OH - - -
Jumlah Total Harga 225,000.00

II.6.3 Memasang 1 M3 Pondasi Batu Belah , Campuran 1 PC : 5 PP

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Batu Belah 15/20 cm M3 1.200 187,500.00 225,000.00
Bahan Portland Cemen Zak 2.720 55,000.00 149,600.00
Pasir Pasang M3 0.544 108,000.00 58,752.00
Pekerja OH 1.500 35,000.00 52,500.00
Tukang Batu OH 0.750 45,000.00 33,750.00
Tenaga Kerja
Kepala Tukang OH 0.075 65,000.00 4,875.00
Mandor OH - -
Jumlah Total Harga 524,477.00

II.6.9 Memasang 1 M3 Batu Kosong ( Aanstamping )

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Batu Belah 15/20 cm M3 1.200 187,500.00 225,000.00
Bahan
Pasir Urug M3 0.432 46,000.00 19,872.00
Pekerja OH 0.780 35,000.00 27,300.00
Tukang Batu OH 0.390 45,000.00 17,550.00
Tenaga Kerja
Kepala Tukang OH 0.039 65,000.00 2,535.00
Mandor OH - -
Jumlah Total Harga 292,257.00
II.6.11 Memasang 1 M3 Pondasi Sumuran , Diameter 100 cm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Batu Belah 15/20 cm M3 0.450 187,500.00 84,375.00
Portland Cemen Zak 3.880 55,000.00 213,400.00
Bahan
Pasir Beton M3 0.312 108,000.00 33,696.00
Kerikil M3 0.468 187,500.00 87,750.00
Pekerja OH 2.400 35,000.00 84,000.00
Tukang Batu OH 0.800 45,000.00 36,000.00
Tenaga Kerja
Kepala Tukang OH 0.080 65,000.00 5,200.00
Mandor OH - -
Jumlah Total Harga 544,421.00

III.6.2 Membuat 1 M3 Beton Mutu F'c = 9,8 Mpa ( K 125 ), Slump ( 12 ± 2 ) cm , W/C = 0,78

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Portland Cemen Zak 5.520 55,000.00 303,600.00
Pasir Beton Kg 828.000 108,000.00 89,424,000.00
Bahan
Kerikil (Maks. 30 mm) Kg ### 187,500.00 189,750,000.00
Air Liter 215.000 25.00 5,375.00
Pekerja OH 1.650 35,000.00 57,750.00
Tukang Batu OH 0.275 45,000.00 12,375.00
Tenaga Kerja
Kepala Tukang OH 0.028 65,000.00 1,820.00
Mandor OH - -
Jumlah Total Harga ###

III.6.3 Membuat 1 M3 Beton Mutu F'c = 12,2 Mpa ( K 150 ), Slump ( 12 ± 2 ) cm , W/C = 0.72

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Portland Cemen Zak 5.980 55,000.00 328,900.00
Pasir Beton Kg 799.000 108,000.00 86,292,000.00
Bahan
Kerikil (Maks. 30 mm) Kg ### 187,500.00 190,687,500.00
Air Liter 215.000 25.00 5,375.00
Pekerja OH 1.650 35,000.00 57,750.00
Tukang Batu OH 0.275 45,000.00 12,375.00
Tenaga Kerja
Kepala Tukang OH 0.028 65,000.00 1,820.00
Mandor OH - -
Jumlah Total Harga ###

III.6.5 Membuat 1 M3 Beton Mutu F'c = 14.5 Mpa ( K 175 ), Slump ( 12 ± 2 ) cm , W/C = 0.66

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Portland Cemen Zak 6.520 55,000.00 358,600.00
Pasir Beton Kg 760.000 108,000.00 82,080,000.00
Bahan
Kerikil (Maks. 30 mm) Kg ### 187,500.00 192,937,500.00
Air Liter 215.000 25.00 5,375.00
Pekerja OH 1.650 35,000.00 57,750.00
Tukang Batu OH 0.275 45,000.00 12,375.00
Tenaga Kerja
Kepala Tukang OH 0.028 65,000.00 1,820.00
Mandor OH - -
Jumlah Total Harga ###

III.6.6 Membuat 1 M3 Beton Mutu F'c = 16.9 Mpa ( K 200 ), Slump ( 12 ± 2 ) cm , W/C = 0.61

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Portland Cemen Zak 7.040 55,000.00 387,200.00
Pasir Beton Kg 731.000 108,000.00 78,948,000.00
Bahan
Kerikil (Maks. 30 mm) Kg ### 187,500.00 193,312,500.00
Air Liter 215.000 25.00 5,375.00
Pekerja OH 1.650 35,000.00 57,750.00
Tukang Batu OH 0.275 45,000.00 12,375.00
Tenaga Kerja
Kepala Tukang OH 0.028 65,000.00 1,820.00
Mandor OH - -
Jumlah Total Harga ###
III.6.7 Membuat 1 M3 Beton Mutu F'c = 19.3 Mpa ( K 225 ), Slump ( 12 ± 2 ) cm , W/C = 0.58

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Portland Cemen Zak 7.420 55,000.00 408,100.00
Pasir Beton Kg 698.000 108,000.00 75,384,000.00
Bahan
Kerikil (Maks. 30 mm) Kg ### 187,500.00 196,312,500.00
Air Liter 215.000 25.00 5,375.00
Pekerja OH 1.650 35,000.00 57,750.00
Tukang Batu OH 0.275 45,000.00 12,375.00
Tenaga Kerja
Kepala Tukang OH 0.028 65,000.00 1,820.00
Mandor OH - -
Jumlah Total Harga ###

III.6.8 Membuat 1 M3 Beton Mutu F'c = 21.7 Mpa ( K 250 ), Slump ( 12 ± 2 ) cm , W/C = 0.56

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Portland Cemen Zak 7.680 55,000.00 422,400.00
Pasir Beton Kg 692.000 108,000.00 74,736,000.00
Bahan
Kerikil (Maks. 30 mm) Kg ### 187,500.00 194,812,500.00
Air Liter 215.000 25.00 5,375.00
Pekerja OH 1.650 35,000.00 57,750.00
Tukang Batu OH 0.275 45,000.00 12,375.00
Tenaga Kerja
Kepala Tukang OH 0.028 65,000.00 1,820.00
Mandor OH - -
Jumlah Total Harga ###

III.6.9 Membuat 1 M3 Beton Mutu F'c = 24.0 Mpa ( K 275 ), Slump ( 12 ± 2 ) cm , W/C = 0.53

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Portland Cemen Zak 8.120 55,000.00 446,600.00
Pasir Beton Kg 684.000 108,000.00 73,872,000.00
Bahan
Kerikil (Maks. 30 mm) Kg ### 187,500.00 192,375,000.00
Air Liter 215.000 25.00 5,375.00
Pekerja OH 1.650 35,000.00 57,750.00
Tukang Batu OH 0.275 45,000.00 12,375.00
Tenaga Kerja
Kepala Tukang OH 0.028 65,000.00 1,820.00
Mandor OH - -
Jumlah Total Harga ###

III.6.13 Membuat 1 M3 Beton Kadap Air Dengan Strorox - 100

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Portland Cemen Zak 8.000 55,000.00 440,000.00
Pasir Beton M3 0.480 108,000.00 51,840.00
Bahan
Kerikil (2 cm / 3 cm ) M3 0.800 187,500.00 150,000.00
Strorox - 100 Zak 1.200 25.00 30.00
Pekerja OH 2.100 35,000.00 73,500.00
Tukang Batu OH 0.350 45,000.00 15,750.00
Tenaga Kerja
Kepala Tukang OH 0.035 65,000.00 2,275.00
Mandor OH - -
Jumlah Total Harga 733,395.00

III.6.19 Memasang 10 Kg Jaring Kawat Baja / Wire Mesh

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Jaring Kawat Baja dilas Kg 10.200 20,000.00 204,000.00
Bahan
Kawat Beton Kg 0.050 9,500.00 475.00
Pekerja OH 0.025 35,000.00 875.00
Tukang Besi OH 0.025 45,000.00 1,125.00
Tenaga Kerja
Kepala Tukang OH 0.025 65,000.00 1,625.00
Mandor OH - -
Jumlah Total Harga 208,100.00
III.6.2 Memasang 1 M2 Bekisting Untuk Pondasi

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kayu Kelas III M3 0.040 700,000.00 28,000.00
Bahan Paku 5 cm - 10 cm Kg 0.300 10,000.00 3,000.00
Minyak Bekisting Liter 0.100 2,000.00 200.00
Pekerja OH 0.520 35,000.00 18,200.00
Tukang Kayu OH 0.260 45,000.00 11,700.00
Tenaga Kerja
Kepala Tukang OH 0.026 65,000.00 1,690.00
Mandor OH - -
Jumlah Total Harga 62,790.00

III.6.21 Memasang 1 M2 Bekisting Untuk Sloof

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kayu Kelas III M3 0.045 700,000.00 31,500.00
Bahan Paku 5 cm - 10 cm Kg 0.300 10,000.00 3,000.00
Minyak Bekisting Liter 0.100 2,000.00 200.00
Pekerja OH 0.520 35,000.00 18,200.00
Tukang Kayu OH 0.260 45,000.00 11,700.00
Tenaga Kerja
Kepala Tukang OH 0.026 65,000.00 1,690.00
Mandor OH - -
Jumlah Total Harga 66,290.00

III.6.22 Memasang 1 M2 Bekisting Untuk Kolom

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kayu Kelas III M3 0.040 700,000.00 28,000.00
Paku 5 cm - 12 cm Kg 0.400 10,000.00 4,000.00
Minyak Bekisting Liter 0.200 2,000.00 400.00
Bahan
Balok Kayu Kelas II M3 0.015 930,000.00 13,950.00
Plywood Tebal 9 mm Lembar 0.350 135,000.00 47,250.00
Dolken Dia. (8-10) cm/ Batang 2.000 8,500.00 17,000.00
Pekerja OH 0.660 35,000.00 23,100.00
Tukang Kayu OH 0.330 45,000.00 14,850.00
Tenaga Kerja
Kepala Tukang OH 0.033 65,000.00 2,145.00
Mandor OH - -
Jumlah Total Harga 150,695.00

III.6.23 Memasang 1 M2 Bekisting Untuk Balok

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kayu Kelas III M3 0.040 700,000.00 28,000.00
Paku 5 cm - 12 cm Kg 0.400 10,000.00 4,000.00
Minyak Bekisting Liter 0.200 2,000.00 400.00
Bahan
Balok Kayu Kelas II M3 0.018 930,000.00 16,740.00
Plywood Tebal 9 mm Lembar 0.350 135,000.00 47,250.00
Dolken Dia. (8-10) cm/ Batang 2.000 8,500.00 17,000.00
Pekerja OH 0.660 35,000.00 23,100.00
Tukang Kayu OH 0.330 45,000.00 14,850.00
Tenaga Kerja
Kepala Tukang OH 0.033 65,000.00 2,145.00
Mandor OH - -
Jumlah Total Harga 153,485.00

III.6.24 Memasang 1 M2 Bekisting Untuk Lantai

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kayu Kelas III M3 0.040 700,000.00 28,000.00
Paku 5 cm - 12 cm Kg 0.400 10,000.00 4,000.00
Minyak Bekisting Liter 0.200 2,000.00 400.00
Bahan
Balok Kayu Kelas II M3 0.015 930,000.00 13,950.00
Plywood Tebal 9 mm Lembar 0.350 135,000.00 47,250.00
Dolken Dia. (8-10) cm/ Batang 6.000 8,500.00 51,000.00
Pekerja OH 0.660 35,000.00 23,100.00
Tukang Kayu OH 0.330 45,000.00 14,850.00
Tenaga Kerja
Kepala Tukang OH 0.033 65,000.00 2,145.00
Tenaga Kerja

Mandor OH - -
Jumlah Total Harga 184,695.00

III.6.26 Memasang 1 M2 Bekisting Untuk Tangga

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kayu Kelas III M3 0.030 700,000.00 21,000.00
Paku 5 cm - 12 cm Kg 0.400 10,000.00 4,000.00
Minyak Bekisting Liter 0.150 2,000.00 300.00
Bahan
Balok Kayu Kelas II M3 0.015 930,000.00 13,950.00
Plywood Tebal 9 mm Lembar 0.350 135,000.00 47,250.00
Dolken Dia. (8-10) cm/ Batang 2.000 8,500.00 17,000.00
Pekerja OH 0.660 35,000.00 23,100.00
Tukang Kayu OH 0.330 45,000.00 14,850.00
Tenaga Kerja
Kepala Tukang OH 0.033 65,000.00 2,145.00
Mandor OH - -
Jumlah Total Harga 143,595.00

III.6.28 Membuat 1 M3 Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting )

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kayu Kelas III M3 0.200 700,000.00 140,000.00
Paku 5 cm - 12 cm Kg 1.500 10,000.00 15,000.00
Minyak Bekisting Liter 0.400 2,000.00 800.00
Besi Beton Polos Kg 157.500 8,300.00 1,307,250.00
Bahan
Kawat Beton Kg 2.250 9,500.00 21,375.00
Portland Cement Zak 6.720 55,000.00 369,600.00
Pasir Beton M3 0.540 108,000.00 58,320.00
Kerikil M3 0.810 187,500.00 151,875.00
Pekerja OH 5.300 35,000.00 185,500.00
Tukang Batu OH 0.275 45,000.00 12,375.00
Tukang Kayu OH 1.300 45,000.00 58,500.00
Tenaga Kerja
Tukang Besi OH 1.050 45,000.00 47,250.00
Kepala Tukang OH 0.262 65,000.00 17,030.00
Mandor OH - -
Jumlah Total Harga 2,384,875.00

III.6.29 Membuat 1 M3 Sloof Beton Bertulang ( 200 Kg Besi + Bekisting )

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kayu Kelas III M3 0.270 700,000.00 189,000.00
Paku 5 cm - 12 cm Kg 2.000 10,000.00 20,000.00
Minyak Bekisting Liter 0.600 2,000.00 1,200.00
Besi Beton Polos Kg 210.000 8,300.00 1,743,000.00
Bahan
Kawat Beton Kg 3.000 9,500.00 28,500.00
Portland Cement Zak 6.720 55,000.00 369,600.00
Pasir Beton M3 0.540 108,000.00 58,320.00
Kerikil M3 0.810 187,500.00 151,875.00
Pekerja OH 5.650 35,000.00 197,750.00
Tukang Batu OH 0.275 45,000.00 12,375.00
Tukang Kayu OH 1.560 45,000.00 70,200.00
Tenaga Kerja
Tukang Besi OH 1.400 45,000.00 63,000.00
Kepala Tukang OH 0.323 65,000.00 20,995.00
Mandor OH - -
Jumlah Total Harga 2,925,815.00

III.6.3 Membuat 1 M3 Kolom Beton Bertulang ( 300 Kg Besi + Bekisting )

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kayu Kelas III M3 0.400 700,000.00 280,000.00
Paku 5 cm - 12 cm Kg 4.000 10,000.00 40,000.00
Minyak Bekisting Liter 2.000 2,000.00 4,000.00
Besi Beton Polos Kg 315.000 8,300.00 2,614,500.00
Kawat Beton Kg 4.500 9,500.00 42,750.00
Bahan
Portland Cement Zak 6.720 55,000.00 369,600.00
Pasir Beton M3 0.540 108,000.00 58,320.00
Bahan

Kerikil M3 0.810 187,500.00 151,875.00


Plywood Tebal 9 mm Lembar 0.150 135,000.00 20,250.00
Dolken Dia. (8-10) cm/ Batang 20.000 8,500.00 170,000.00

Pekerja OH 7.050 35,000.00 246,750.00


Tukang Batu OH 0.275 45,000.00 12,375.00
Tukang Kayu OH 1.650 45,000.00 74,250.00
Tenaga Kerja
Tukang Besi OH 2.100 45,000.00 94,500.00
Kepala Tukang OH 0.403 65,000.00 26,195.00
Mandor OH - -
Jumlah Total Harga 4,205,365.00

III.6.31 Membuat 1 M3 Balok Beton Bertulang ( 200 Kg Besi + Bekisting )

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kayu Kelas III M3 0.320 700,000.00 224,000.00
Paku 5 cm - 12 cm Kg 3.200 10,000.00 32,000.00
Minyak Bekisting Liter 1.600 2,000.00 3,200.00
Besi Beton Polos Kg 210.000 8,300.00 1,743,000.00
Kawat Beton Kg 3.000 9,500.00 28,500.00
Bahan Portland Cement Zak 6.720 55,000.00 369,600.00
Pasir Beton M3 0.540 108,000.00 58,320.00
Kerikil M3 0.810 187,500.00 151,875.00
Kayu Balok Kelas II M3 0.140 930,000.00 130,200.00
Plywood Tebal 9 mm Lembar 2.800 135,000.00 378,000.00
Dolken Dia. (8-10) cm/ Batang 16.000 8,500.00 136,000.00
Pekerja OH 6.350 35,000.00 222,250.00
Tukang Batu OH 0.275 45,000.00 12,375.00
Tukang Kayu OH 1.650 45,000.00 74,250.00
Tenaga Kerja
Tukang Besi OH 1.400 45,000.00 63,000.00
Kepala Tukang OH 0.333 65,000.00 21,645.00
Mandor OH - -
Jumlah Total Harga 3,648,215.00

III.6.32 Membuat 1 M3 Kolom Beton Bertulang ( 150 Kg Besi + Bekisting )

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kayu Kelas III M3 0.320 700,000.00 224,000.00
Paku 5 cm - 12 cm Kg 3.200 10,000.00 32,000.00
Minyak Bekisting Liter 1.600 2,000.00 3,200.00
Besi Beton Polos Kg 157.500 8,300.00 1,307,250.00
Kawat Beton Kg 2.250 9,500.00 21,375.00
Bahan Portland Cement Zak 6.720 55,000.00 369,600.00
Pasir Beton M3 0.540 108,000.00 58,320.00
Kerikil M3 0.810 187,500.00 151,875.00
Kayu Balok Kelas II M3 0.120 930,000.00 111,600.00
Plywood Tebal 9 mm Lembar 2.800 135,000.00 378,000.00
Dolken Dia. (8-10) cm/ Batang 32.000 8,500.00 272,000.00
Pekerja OH 5.300 35,000.00 185,500.00
Tukang Batu OH 0.275 45,000.00 12,375.00
Tukang Kayu OH 1.300 45,000.00 58,500.00
Tenaga Kerja
Tukang Besi OH 1.050 45,000.00 47,250.00
Kepala Tukang OH 0.265 65,000.00 17,225.00
Mandor OH - -
Jumlah Total Harga 3,250,070.00

III.6.33 Membuat 1 M3 Dinding Beton Bertulang ( 150 Kg Besi + Bekisting )

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kayu Kelas III M3 0.240 700,000.00 168,000.00
Paku 5 cm - 12 cm Kg 3.200 10,000.00 32,000.00
Minyak Bekisting Liter 1.600 2,000.00 3,200.00
Besi Beton Polos Kg 157.500 8,300.00 1,307,250.00
Kawat Beton Kg 2.250 9,500.00 21,375.00
Bahan
Bahan Portland Cement Zak 6.720 55,000.00 369,600.00
Pasir Beton M3 0.540 108,000.00 58,320.00
Kerikil M3 0.810 187,500.00 151,875.00
Kayu Balok Kelas II M3 0.160 930,000.00 148,800.00
Plywood Tebal 9 mm Lembar 2.800 135,000.00 378,000.00
Dolken Dia. (8-10) cm/ Batang 24.000 8,500.00 204,000.00

Pekerja OH 5.300 35,000.00 185,500.00


Tukang Batu OH 0.275 45,000.00 12,375.00
Tukang Kayu OH 1.300 45,000.00 58,500.00
Tenaga Kerja
Tukang Besi OH 1.050 45,000.00 47,250.00
Kepala Tukang OH 0.262 65,000.00 17,030.00
Mandor OH - -
Jumlah Total Harga 3,163,075.00

III.6.34 Membuat 1 M3 Dinding Beton Bertulang ( 200 Kg Besi + Bekisting )

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kayu Kelas III M3 0.250 700,000.00 175,000.00
Paku 5 cm - 12 cm Kg 3.000 10,000.00 30,000.00
Minyak Bekisting Liter 1.200 2,000.00 2,400.00
Besi Beton Polos Kg 210.000 8,300.00 1,743,000.00
Kawat Beton Kg 3.000 9,500.00 28,500.00
Bahan Portland Cement Zak 6.720 55,000.00 369,600.00
Pasir Beton M3 0.540 108,000.00 58,320.00
Kerikil M3 0.810 187,500.00 151,875.00
Kayu Balok Kelas II M3 0.150 930,000.00 139,500.00
Plywood Tebal 9 mm Lembar 2.500 135,000.00 337,500.00
Dolken Dia. (8-10) cm/ Batang 14.000 8,500.00 119,000.00
Pekerja OH 5.650 35,000.00 197,750.00
Tukang Batu OH 0.275 45,000.00 12,375.00
Tukang Kayu OH 1.560 45,000.00 70,200.00
Tenaga Kerja
Tukang Besi OH 1.400 45,000.00 63,000.00
Kepala Tukang OH 0.323 65,000.00 20,995.00
Mandor OH - -
Jumlah Total Harga 3,519,015.00

III.6.35 Membuat 1 M' Kolom Praktis Beton Bertulang ( 11 x 11 ) cm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kayu Kelas III M3 0.002 700,000.00 1,400.00
Paku 5 cm - 12 cm Kg 0.010 10,000.00 100.00
Minyak Bekisting Liter 1.200 2,000.00 2,400.00
Besi Beton Polos Kg 3.000 8,300.00 24,900.00
Bahan
Kawat Beton Kg 0.450 9,500.00 4,275.00
Portland Cement Zak 0.080 55,000.00 4,400.00
Pasir Beton M3 0.006 108,000.00 648.00
Kerikil M3 0.009 187,500.00 1,687.50
Pekerja OH 0.180 35,000.00 6,300.00
Tukang Batu OH 0.020 45,000.00 900.00
Tukang Kayu OH 0.020 45,000.00 900.00
Tenaga Kerja
Tukang Besi OH 0.020 45,000.00 900.00
Kepala Tukang OH 0.006 65,000.00 390.00
Mandor OH - -
Jumlah Total Harga 49,200.50

III.6.36 Membuat 1 M' Ring Balok Beton Bertulang ( 10 x 15 ) cm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kayu Kelas III M3 0.003 700,000.00 2,100.00
Paku 5 cm - 12 cm Kg 0.020 10,000.00 200.00
Minyak Bekisting Liter 1.200 2,000.00 2,400.00
Besi Beton Polos Kg 3.600 8,300.00 29,880.00
Bahan
Kawat Beton Kg 0.050 9,500.00 475.00
Portland Cement Zak 0.110 55,000.00 6,050.00
Bahan

Pasir Beton M3 0.009 108,000.00 972.00


Kerikil M3 0.015 187,500.00 2,812.50

III.6.36 Membuat 1 M' Ring Balok Beton Bertulang ( 10 x 15 ) cm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Pekerja OH 0.297 35,000.00 10,395.00
Tukang Batu OH 0.033 45,000.00 1,485.00
Tukang Kayu OH 0.033 45,000.00 1,485.00
Tenaga Kerja
Tukang Besi OH 0.033 45,000.00 1,485.00
Kepala Tukang OH 0.010 65,000.00 650.00
Mandor OH - -
Jumlah Total Harga 60,389.50

IV.6.1 Memasang 1 M2 Dinding Bata Merah Ukuran ( 5 x 11 x 22 ) cm Tebal 1 Bata , Campura

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bata Merah Buah 140.000 500.00 70,000.00
Bahan Portland Cement Zak 0.870 55,000.00 47,850.00
Pasir Pasang M3 0.080 108,000.00 8,640.00
Pekerja OH 0.600 35,000.00 21,000.00
Tukang Batu OH 0.200 45,000.00 9,000.00
Tenaga Kerja
Kepala Tukang OH 0.020 65,000.00 1,300.00
Mandor OH - -
Jumlah Total Harga 157,790.000

IV.6.2 Memasang 1 M2 Dinding Bata Merah Ukuran ( 5 x 11 x 22 ) cm Tebal 1 Bata , Campura

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bata Merah Buah 140.000 500.00 70,000.00
Bahan Portland Cement Zak 0.659 55,000.00 36,245.00
Pasir Pasang M3 0.091 108,000.00 9,828.00
Pekerja OH 0.600 35,000.00 21,000.00
Tukang Batu OH 0.200 45,000.00 9,000.00
Tenaga Kerja
Kepala Tukang OH 0.020 65,000.00 1,300.00
Mandor OH - -
Jumlah Total Harga 147,373.00

IV.6.3 Memasang 1 M2 Dinding Bata Merah Ukuran ( 5 x 11 x 22 ) cm Tebal 1 Bata , Campura

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bata Merah Buah 140.000 500.00 70,000.00
Bahan Portland Cement Zak 0.531 55,000.00 29,205.00
Pasir Pasang M3 0.093 108,000.00 10,044.00
Pekerja OH 0.600 35,000.00 21,000.00
Tukang Batu OH 0.200 45,000.00 9,000.00
Tenaga Kerja
Kepala Tukang OH 0.020 65,000.00 1,300.00
Mandor OH - -
Jumlah Total Harga 140,549.00

IV.6.4 Memasang 1 M2 Dinding Bata Merah Ukuran ( 5 x 11 x 22 ) cm Tebal 1 Bata , Campura

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bata Merah Buah 140.000 500.00 70,000.00
Bahan Portland Cement Zak 0.444 55,000.00 24,420.00
Pasir Pasang M3 0.102 108,000.00 11,016.00
Pekerja OH 0.600 35,000.00 21,000.00
Tukang Batu OH 0.200 45,000.00 9,000.00
Tenaga Kerja
Kepala Tukang OH 0.020 65,000.00 1,300.00
Mandor OH - -
Jumlah Total Harga 136,736.00

IV.6.7 Memasang 1 M2 Dinding Bata Merah Ukuran ( 5 x 11 x 22 ) cm Tebal 1/2 Bata , Campur

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bata Merah Buah 70.000 500.00 35,000.00
Bahan Portland Cement Zak 0.379 55,000.00 20,845.00
Pasir Pasang M3 0.038 108,000.00 4,104.00
Pekerja OH 0.300 35,000.00 10,500.00
Tukang Batu OH 0.100 45,000.00 4,500.00
Tenaga Kerja
Kepala Tukang OH 0.010 65,000.00 650.00
Mandor OH - -
Jumlah Total Harga 75,599.00

IV.6.8 Memasang 1 M2 Dinding Bata Merah Ukuran ( 5 x 11 x 22 ) cm Tebal 1/2 Bata , Campur

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bata Merah Buah 70.000 500.00 35,000.00
Bahan Portland Cement Zak 0.287 55,000.00 15,807.00
Pasir Pasang M3 0.040 108,000.00 4,320.00
Pekerja OH 0.300 35,000.00 10,500.00
Tukang Batu OH 0.100 45,000.00 4,500.00
Tenaga Kerja
Kepala Tukang OH 0.010 65,000.00 650.00
Mandor OH - -
Jumlah Total Harga 70,777.00

IV.6.9 Memasang 1 M2 Dinding Bata Merah Ukuran ( 5 x 11 x 22 ) cm Tebal 1/2 Bata , Campur

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bata Merah Buah 70.000 500.00 35,000.00
Bahan Portland Cement Zak 0.230 55,000.00 12,650.00
Pasir Pasang M3 0.043 108,000.00 4,644.00
Pekerja OH 0.300 35,000.00 10,500.00
Tukang Batu OH 0.100 45,000.00 4,500.00
Tenaga Kerja
Kepala Tukang OH 0.010 65,000.00 650.00
Mandor OH - -
Jumlah Total Harga 67,944.00

IV.6.1 Memasang 1 M2 Dinding Bata Merah Ukuran ( 5 x 11 x 22 ) cm Tebal 1/2 Bata , Campur

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bata Merah Buah 70.000 500.00 35,000.00
Bahan Portland Cement Zak 0.194 55,000.00 10,648.00
Pasir Pasang M3 0.045 108,000.00 4,860.00
Pekerja OH 0.300 35,000.00 10,500.00
Tukang Batu OH 0.100 45,000.00 4,500.00
Tenaga Kerja
Kepala Tukang OH 0.010 65,000.00 650.00
Mandor OH - -
Jumlah Total Harga 66,158.00

IV.6.24 Memasang 1 M2 Dinding Bata Berongga Ekspose Ukuran ( 5 x 11 x 24 ) cm , Campuran

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bata Berongga Ekspose Buah 70.000 500.00 35,000.00
Bahan Portland Cement Zak 0.280 55,000.00 15,400.00
Pasir Pasang M3 0.032 108,000.00 3,456.00
Pekerja OH 0.300 35,000.00 10,500.00
Tukang Batu OH 0.150 45,000.00 6,750.00
Tenaga Kerja
Kepala Tukang OH 0.015 65,000.00 975.00
Mandor OH - -
Jumlah Total Harga 72,081.00

V.6.1 Memasang 1 M2 Plesteran 1 PC : 1 PP, Tebal 15 mm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Portland Cement Zak 0.310 55,000.00 17,054.40
Bahan
Pasir Pasang M3 0.016 108,000.00 1,728.00
Pekerja OH 0.300 35,000.00 10,500.00
Tukang Batu OH 0.150 45,000.00 6,750.00
Tenaga Kerja
Tenaga Kerja
Kepala Tukang OH 0.015 65,000.00 975.00
Mandor OH - -
Jumlah Total Harga 37,007.40

V.6.2 Memasang 1 M2 Plesteran 1 PC : 2 PP, Tebal 15 mm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Portland Cement Zak 0.204 55,000.00 11,246.40
Bahan
Pasir Pasang M3 0.020 108,000.00 2,160.00
Pekerja OH 0.300 35,000.00 10,500.00
Tukang Batu OH 0.150 45,000.00 6,750.00
Tenaga Kerja
Kepala Tukang OH 0.015 65,000.00 975.00
Mandor OH - -
Jumlah Total Harga 31,631.40

V.6.3 Memasang 1 M2 Plesteran 1 PC : 3 PP, Tebal 15 mm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Portland Cement Zak 0.156 55,000.00 8,553.60
Bahan
Pasir Pasang M3 0.023 108,000.00 2,484.00
Pekerja OH 0.300 35,000.00 10,500.00
Tukang Batu OH 0.150 45,000.00 6,750.00
Tenaga Kerja
Kepala Tukang OH 0.015 65,000.00 975.00
Mandor OH - -
Jumlah Total Harga 29,262.60

V.6.4 Memasang 1 M2 Plesteran 1 PC : 4 PP, Tebal 15 mm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Portland Cement Zak 0.125 55,000.00 6,864.00
Bahan
Pasir Pasang M3 0.026 108,000.00 2,808.00
Pekerja OH 0.300 35,000.00 10,500.00
Tukang Batu OH 0.150 45,000.00 6,750.00
Tenaga Kerja
Kepala Tukang OH 0.015 65,000.00 975.00
Mandor OH - -
Jumlah Total Harga 27,897.00

V.6.5 Memasang 1 M2 Plesteran 1 PC : 5 PP, Tebal 15 mm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Portland Cement Zak 0.104 55,000.00 5,702.40
Bahan
Pasir Pasang M3 0.026 108,000.00 2,808.00
Pekerja OH 0.300 35,000.00 10,500.00
Tukang Batu OH 0.150 45,000.00 6,750.00
Tenaga Kerja
Kepala Tukang OH 0.015 65,000.00 975.00
Mandor OH - -
Jumlah Total Harga 26,735.40

V.6.22 Memasang 1 M2 Plesteran Teraso 1 PC : 2 Batu Teraso, Tebal 10 mm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Portland Cement Zak 0.200 55,000.00 11,000.00
Bahan
Batu Tersaso Kg 15.000 600.00 9,000.00
Pekerja OH 0.450 35,000.00 15,750.00
Tukang Batu OH 0.225 45,000.00 10,125.00
Tenaga Kerja
Kepala Tukang OH 0.023 65,000.00 1,495.00
Mandor OH - -
Jumlah Total Harga 47,370.00

V.6.24 Memasang 1 M2 Finishing Siar Pasangan Dinding Bata Merah ( = 20 m' )

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bahan Portland Cement Zak 0.062 55,000.00 3,418.80
Pekerja OH 0.150 35,000.00 5,250.00
Tukang Batu OH 0.075 45,000.00 3,375.00
Tenaga Kerja
Kepala Tukang OH 0.008 65,000.00 520.00
Mandor OH - - -
Jumlah Total Harga 12,563.80
V.6.26 Memasang 1 M2 Finishing Siar Pasangan Batu Kali Adukan 1 PC : 2 PP

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Portland Cement Zak 0.127 55,000.00 6,974.00
Bahan
Pasir Pasang M3 0.012 108,000.00 1,296.00
Pekerja OH 0.300 35,000.00 10,500.00
Tukang Batu OH 0.150 45,000.00 6,750.00
Tenaga Kerja
Kepala Tukang OH 0.015 65,000.00 975.00
Mandor OH - -
Jumlah Total Harga 26,495.00

V.6.27 Memasang 1 M2 Acian

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bahan Portland Cement Zak 0.065 55,000.00 3,575.00
Pekerja OH 0.200 35,000.00 7,000.00
Tukang Batu OH 0.100 45,000.00 4,500.00
Tenaga Kerja
Kepala Tukang OH 0.010 65,000.00 650.00
Mandor OH - -
Jumlah Total Harga 15,725.00

VI.6.1 Membuat Dan Memasang 1 M3 Kusen Pintu Dan Kusen Jendela, Kayu Kelas 1

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Balok Kayu M3 1.100 2,300,000.00 2,530,000.00
Bahan Paku 10 cm Kg 1.250 10,000.00 12,500.00
Lem Kayu Kg 1.000 12,500.00 12,500.00
Pekerja OH 7.000 35,000.00 245,000.00
Tukang Kayu OH 21.000 45,000.00 945,000.00
Tenaga Kerja
Kepala Tukang OH 2.100 65,000.00 136,500.00
Mandor OH - -
Jumlah Total Harga 3,881,500.00

VI.6.2 Membuat Dan Memasang 1 M3 Kusen Pintu Dan Kusen Jendela, Kayu Kelas II Atau III

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Balok Kayu M3 1.200 930,000.00 1,116,000.00
Bahan Paku 10 cm Kg 1.250 10,000.00 12,500.00
Lem Kayu Kg 1.000 12,500.00 12,500.00
Pekerja OH 6.000 35,000.00 210,000.00
Tukang Kayu OH 18.000 45,000.00 810,000.00
Tenaga Kerja
Kepala Tukang OH 1.800 65,000.00 117,000.00
Mandor OH - -
Jumlah Total Harga 2,278,000.00

VI.6.3 Membuat Dan Memasang 1 M2 Pintu Klamp Standar, Kayu Kelas II

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Papan Kayu M3 0.040 950,000.00 38,000.00
Bahan
Paku 5 cm - 7 cm Kg 0.050 10,000.00 500.00
Pekerja OH 0.350 35,000.00 12,250.00
Tukang Kayu OH 1.050 45,000.00 47,250.00
Tenaga Kerja
Kepala Tukang OH 0.105 65,000.00 6,825.00
Mandor OH - -
Jumlah Total Harga 104,825.00

VI.6.5 Membuat Dan Memasang 1 M2 Daun Pintu Panel, Kayu Kelas I Atau II

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Papan Kayu M3 0.040 950,000.00 38,000.00
Bahan
Lem Kayu Kg 0.500 12,500.00 6,250.00
Pekerja OH 1.000 35,000.00 35,000.00

Tenaga Kerja
Tukang Kayu OH 3.000 45,000.00 135,000.00
Tenaga Kerja
Kepala Tukang OH 0.300 65,000.00 19,500.00
Mandor OH - -
Jumlah Total Harga 233,750.00

VI.6.6 Membuat Dan Memasang 1 M2 Pintu Dan Jendela Kaca, Kayu Kelas I Atau II

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Papan Kayu M3 0.024 2,350,000.00 56,400.00
Bahan
Lem Kayu Kg 0.300 12,500.00 3,750.00
Pekerja OH 0.800 35,000.00 28,000.00
Tukang Kayu OH 2.400 45,000.00 108,000.00
Tenaga Kerja
Kepala Tukang OH 0.040 65,000.00 2,600.00
Mandor OH - -
Jumlah Total Harga 198,750.00

VI.6.7 Membuat Dan Memasang 1 M2 Pintu Dan Jendela Jalusi, Kayu Kelas I Atau II

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Papan Kayu M3 0.064 2,350,000.00 150,400.00
Bahan
Lem Kayu Kg 0.500 12,500.00 6,250.00
Pekerja OH 1.000 35,000.00 35,000.00
Tukang Kayu OH 3.000 45,000.00 135,000.00
Tenaga Kerja
Kepala Tukang OH 0.300 65,000.00 19,500.00
Mandor OH - -
Jumlah Total Harga 346,150.00

VI.6.1 Memasang 1 M2 Jalusi Kusen, Kayu Kelas I Atau II

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Papan Kayu M3 0.060 2,350,000.00 141,000.00
Bahan
Paku 1 cm - 2,5 cm Kg 0.150 13,500.00 2,025.00
Pekerja OH 0.670 35,000.00 23,450.00
Tukang Kayu OH 2.000 45,000.00 90,000.00
Tenaga Kerja
Kepala Tukang OH 0.200 65,000.00 13,000.00
Mandor OH - -
Jumlah Total Harga 269,475.00

VI.6.11 Memasang 1 M2 Teakwood Rangkap, Rangka Exspose Kayu Kelas I

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Papan Kayu M3 0.025 2,300,000.00 57,500.00
Paku 1 cm - 2,5 cm Kg 0.030 13,500.00 405.00
Bahan Lem Kayu Kg 0.300 12,500.00 3,750.00
Teakwood Tebal 4 mm
Lembar 1.000 35,000.00 35,000.00
Ukuran ( 90 x 220 ) cm
Pekerja OH 0.800 35,000.00 28,000.00
Tukang Kayu OH 2.400 45,000.00 108,000.00
Tenaga Kerja
Kepala Tukang OH 0.240 65,000.00 15,600.00
Mandor OH - -
Jumlah Total Harga 248,255.00

VI.6.13 Memasang 1 M3 Konstruksi Kuda-Kuda Konvensional, Kayu Kelas I , II Dan III Bentan

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Balok Kayu M3 1.100 2,300,000.00 2,530,000.00
Bahan Besi Strip Tebal 5 mm Kg 15.000 9,500.00 142,500.00
Paku 12 cm Kg 5.600 10,000.00 56,000.00
Pekerja OH 4.000 35,000.00 140,000.00
Tukang Kayu OH 12.000 45,000.00 540,000.00
Tenaga Kerja
Kepala Tukang OH 1.200 65,000.00 78,000.00
Mandor OH - -
Jumlah Total Harga 3,486,500.00

VI.6.14 Memasang 1 M3 Konstruksi Kuda-Kuda Expose, Kayu Kelas II


Kebutuhan Satuan IndeksHarga Satuan ( Rp
Jumlah
) Harga ( Rp )
Balok Kayu M3 1.200 930,000.00 1,116,000.00
Bahan Besi Strip Tebal 5 mm Kg 15.000 9,500.00 142,500.00
Paku 12 cm Kg 5.600 10,000.00 56,000.00
Pekerja OH 4.000 35,000.00 140,000.00
Tukang Kayu OH 12.000 45,000.00 540,000.00
Tenaga Kerja
Kepala Tukang OH 1.200 65,000.00 78,000.00
Mandor OH - -
Jumlah Total Harga 2,072,500.00

VI.6.15 Memasang 1 M3 Konstruksi Gordeng, Kayu Kelas II

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Balok Kayu M3 1.100 930,000.00 1,023,000.00
Bahan Besi Strip Tebal 5 mm Kg 15.000 9,500.00 142,500.00
Paku 12 cm Kg 3.000 10,000.00 30,000.00
Pekerja OH 2.400 35,000.00 84,000.00
Tukang Kayu OH 7.200 45,000.00 324,000.00
Tenaga Kerja
Kepala Tukang OH 0.720 65,000.00 46,800.00
Mandor OH - -
Jumlah Total Harga 1,650,300.00

VI.6.16 Memasang 1 M2 Rangka Atap Genteng Keramik, Kayu Kelas II

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kaso-Kaso ( 5 x 7 ) cm M3 0.014 930,000.00 13,020.00
Bahan Reng ( 2 x 3 ) cm M3 0.036 930,000.00 33,480.00
Paku 5 cm Dan 10 cm Kg 0.250 10,000.00 2,500.00
Pekerja OH 0.100 35,000.00 3,500.00
Tukang Kayu OH 0.100 45,000.00 4,500.00
Tenaga Kerja
Kepala Tukang OH 0.010 65,000.00 650.00
Mandor OH - -
Jumlah Total Harga 57,650.00

VI.6.33 Memasang 1 M2 Pek. Kaso 5/7 + Reng 2/3

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kaso-Kaso ( 5 x 7 ) cm M3 0.014 930,000.00 13,020.00
Bahan Reng ( 2 x 3 ) cm M3 0.006 930,000.00 5,580.00
Paku 5 cm Dan 10 cm Kg 0.150 10,000.00 1,500.00
Pekerja OH 0.100 35,000.00 3,500.00
Tukang Kayu OH 0.100 45,000.00 4,500.00
Tenaga Kerja
Kepala Tukang OH 0.010 65,000.00 650.00
Mandor OH - -
Jumlah Total Harga 28,750.00

VI.6.2 Memasang 1 M2 Rangka Langit-Langit ( 60 x 120 ), Kayu Kelas II Atau III

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kaso-Kaso ( 5 x 7 ) cm M3 0.008 930,000.00 7,579.50
Bahan
Paku 7 cm - 10 cm Kg 0.125 10,000.00 1,250.00
Pekerja OH 0.200 35,000.00 7,000.00
Tukang Kayu OH 0.300 45,000.00 13,500.00
Tenaga Kerja
Kepala Tukang OH 0.030 65,000.00 1,950.00
Mandor OH - -
Jumlah Total Harga 31,279.50

VI.6.21 Memasang 1 M' Listplank Ukuran ( 3 x 20 ) cm, Kayu Kelas I Atau Kelas II

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Papan Kayu M3 0.011 950,000.00 10,260.00
Bahan
Paku 5 cm - 7 cm Kg 0.100 10,000.00 1,000.00
Pekerja OH 0.100 35,000.00 3,500.00
Tukang Kayu OH 0.200 45,000.00 9,000.00
Tenaga Kerja
Kepala Tukang OH 0.020 65,000.00 1,300.00
Mandor OH - -
Jumlah Total Harga 25,060.00

VI.6.22 Memasang 1 M' Listplank Ukuran ( 3 x 30 ) cm, Kayu Kelas I Atau Kelas II
Kebutuhan Satuan IndeksHarga Satuan ( Rp
Jumlah
) Harga ( Rp )
Papan Kayu M3 0.011 950,000.00 10,450.00
Bahan
Paku 5 cm - 7 cm Kg 0.050 10,000.00 500.00
Pekerja OH 0.100 35,000.00 3,500.00
Tukang Kayu OH 0.200 45,000.00 9,000.00
Tenaga Kerja
Kepala Tukang OH 0.020 65,000.00 1,300.00
Mandor OH - -
Jumlah Total Harga 24,750.00

VI.6.23 Memasang 1 M2 Rangka Dinding Pemisa ( 60 x 120 ) cm, Kayu Kelas II Atau Kelas III

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Balok Kayu M3 0.028 950,000.00 26,600.00
Bahan
Paku 5 cm - 7 cm Kg 0.150 10,000.00 1,500.00
Pekerja OH 0.150 35,000.00 5,250.00
Tukang Kayu OH 0.450 45,000.00 20,250.00
Tenaga Kerja
Kepala Tukang OH 0.045 65,000.00 2,925.00
Mandor OH - -
Jumlah Total Harga 56,525.00

VII.6.2 Memasang 1 M2 Lantai Ubin Pc Abu-abu Ukuran (30x30) cm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Ubin Abu-abu Buah 11.870 3,750.00 44,512.50
Bahan Portland cemen Zak 0.200 55,000.00 11,000.00
Pasir Pasang M3 0.045 108,000.00 4,860.00
Pekerja OH 0.260 35,000.00 9,100.00
Tukang Batu OH 0.130 45,000.00 5,850.00
Tenaga Kerja
Kepala Tukang OH 0.013 65,000.00 845.00
Mandor OH - -
Jumlah Total Harga 76,167.50

VII.6.32 Memasang 1 M2 Lantai Keramik Artistik Ukuran (10x20) cm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Ubin Keramik Aristik Buah 53.000 900.00 47,700.00
Portland cemen Zak 0.164 55,000.00 9,009.00
Bahan
Pasir Pasang M3 0.045 108,000.00 4,860.00
Semen Warna Kg 2.750 8,000.00 22,000.00
Pekerja OH 0.700 35,000.00 24,500.00
Tukang Batu OH 0.350 45,000.00 15,750.00
Tenaga Kerja
Kepala Tukang OH 0.035 65,000.00 2,275.00
Mandor OH - -
Jumlah Total Harga 126,094.00

VII.6.35 Memasang 1 M2 Lantai Keramik Ukuran (30x30) cm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Ubin Keramik Buah 11.870 4,050.00 48,073.50
Portland cemen Zak 0.200 55,000.00 11,000.00
Bahan
Pasir Pasang M3 0.045 108,000.00 4,860.00
Semen Warna Kg 1.500 8,000.00 12,000.00
Pekerja OH 0.700 35,000.00 24,500.00
Tukang Batu OH 0.350 45,000.00 15,750.00
Tenaga Kerja
Kepala Tukang OH 0.035 65,000.00 2,275.00
Mandor OH - -
Jumlah Total Harga 118,458.50

VII.6.36 Memasang 1 M2 Lantai Keramik Ukuran (20x20) cm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Ubin Keramik Buah 26.500 1,800.00 47,700.00
Portland cemen Zak 0.208 55,000.00 11,440.00
Bahan
Pasir Pasang M3 0.045 108,000.00 4,860.00
Semen Warna Kg 1.620 8,000.00 12,960.00
Pekerja OH 0.700 35,000.00 24,500.00
Tukang Batu OH 0.350 45,000.00 15,750.00
Tenaga Kerja
Kepala Tukang OH 0.035 65,000.00 2,275.00
Mandor OH - -
Jumlah Total Harga 119,485.00

XIII.6.68 Memasang 1 M2 Dinding Keramik (20x20) cm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Ubin Keramik Buah 25.000 1,800.00 45,000.00
Portland cemen M3 0.186 55,000.00 10,230.00
Bahan
Pasir Pasang M3 0.018 108,000.00 1,944.00
Semen Warna Kg 1.500 8,000.00 12,000.00
Pekerja OH 0.600 45,000.00 27,000.00
Tukang Batu OH 0.100 65,000.00 6,500.00
Tenaga Kerja
Kepala Tukang OH 0.045 65,000.00 2,925.00
Mandor OH - -
Jumlah Total Harga 105,599.00

Tukang Batu OH 0.090 45,000.00 4,050.00


Tenaga Kerja
Kepala Tukang OH 0.009 65,000.00 585.00
Mandor OH - -
Jumlah Total Harga 119,659.00

VII.6.68 Memasang 1 M2 Dinding Batu Tempel Hitam

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Batu Tempel Hitam M2 1.100 80,500.00 88,550.00
Bahan Portland cemen Zak 0.235 65,000.00 15,275.00
Pasir Pasang M3 0.035 - -
Pekerja OH 0.700 - -
Tukang Batu OH 0.350 45,000.00 15,750.00
Tenaga Kerja
Kepala Tukang OH 0.035 65,000.00 2,275.00
Mandor OH - -
Jumlah Total Harga 121,850.00

VIII.6.4 Memasang 1 M2 Rangka Langit-langit Ukuran (60x120) cm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Balok 4/6 M3 0.009 930,000.00 8,035.20
Bahan
Paku 5 cm - 7 cm Kg 0.050 10,000.00 500.00
Pekerja OH 0.100 - -
Tukang Kayu OH 0.100 45,000.00 4,500.00
Tenaga Kerja
Kepala Tukang OH 0.010 65,000.00 650.00
Mandor OH - -
Jumlah Total Harga 13,685.20

VIII.6.5 Memasang 1 M2 Langit-langit Tripleks Ukuran (120x240) cm, Tebal 3 mm, 4 mm dan

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Tripleks Lembar 0.375 42,000.00 15,750.00
Bahan
Paku Tripleks Kg 0.030 13,500.00 405.00
Pekerja OH 0.100 - -
Tukang Kayu OH 0.100 45,000.00 4,500.00
Tenaga Kerja
Kepala Tukang OH 0.010 65,000.00 650.00
Mandor OH - -
Jumlah Total Harga 21,305.00

VIII.6.5 Memasang 1 M List Langit-langit Kayu Profil 1/4 cm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
List Kayu Profil M 1.050 20,000.00 21,000.00
Bahan
Paku Kg 0.010 13,500.00 135.00
Pekerja OH 0.050 - -
Tukang Kayu OH 0.050 45,000.00 2,250.00
Tenaga Kerja
Kepala Tukang OH 0.005 65,000.00 325.00
Mandor OH - -
Jumlah Total Harga 23,710.00

IX.6.18 Memasang 1 M' Talang Datar/Jurai Seng BJLS 28 Lebar 90 Cm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Seng Plat M' 1.050 27,600.00 28,980.00
Bahan Paku 1 cm - 2,5 cm Kg 0.015 10,000.00 150.00
Papan Kayu Kelas II Dan M' 0.019 950,000.00 18,050.00
Pekerja OH 0.200 - -
Tukang Besi OH 0.400 45,000.00 18,000.00
Tenaga Kerja
Kepala Tukang OH 0.010 65,000.00 650.00
Mandor OH - -
Jumlah Total Harga 65,830.00

IX.6.19 Memasang 1 M' Talang 1/2 Lingkaran D-15 cm, Seng Plat BJLS 30 Lebar 45 cm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Seng Plat M' 1.050 27,600.00 28,980.00
Bahan Paku 1 cm - 2,5 cm Kg 0.010 10,000.00 100.00
Besi Strip Kg 0.500 9,500.00 4,750.00
Pekerja OH 0.150 - -
Tukang Besi OH 0.300 45,000.00 13,500.00
Tenaga Kerja
Kepala Tukang OH 0.010 65,000.00 650.00
Mandor OH - -
Jumlah Total Harga 47,980.00

IX.6.32 Memasang 1 M2 Pasangan Atap Genteng Metal

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
GentengMetal M2 1.650 40,000.00 66,000.00
Bahan
Paku 1 cm - 2,5 cm Kg 0.200 10,000.00 2,000.00
Pekerja OH 0.200 - -
Tukang Kayu OH 0.100 45,000.00 4,500.00
Tenaga Kerja
Kepala Tukang OH 0.010 65,000.00 650.00
Mandor OH - -
Jumlah Total Harga 73,150.00

IX.6.36 Memasang 1 M Pasangan Nok Genteng Metal

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Genteng Decra Bond M2 1.100 32,500.00 35,750.00
Bahan
Paku 1 cm - 2,5 cm Kg 0.200 10,000.00 2,000.00
Pekerja OH 0.250 - -
Tukang Kayu OH 0.150 45,000.00 6,750.00
Tenaga Kerja
Kepala Tukang OH 0.015 65,000.00 975.00
Mandor OH - -
Jumlah Total Harga 45,475.00

IX.6.38 Memasang 1 M2 Pasangan Atap Seng Gelombang

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Seng Gelombang BJLS 0 M2 1.650 34,000.00 56,100.00
Bahan
Paku 1 cm - 2,5 cm Kg 0.200 13,500.00 2,700.00
Pekerja OH 0.200 - -
Tukang Kayu OH 0.100 45,000.00 4,500.00
Tenaga Kerja
Kepala Tukang OH 0.010 65,000.00 650.00
Mandor OH - -
Jumlah Total Harga 63,950.00

IX.6.36 Memasang 1 M Pasangan Nok Seng Gelombang

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Seng Plat M2 1.100 27,600.00 30,360.00
Bahan
Paku 1 cm - 2,5 cm Kg 0.200 13,500.00 2,700.00
Pekerja OH 0.250 - -
Tukang Kayu OH 0.150 45,000.00 6,750.00
Tenaga Kerja
Tenaga Kerja
Kepala Tukang OH 0.015 65,000.00 975.00
Mandor OH - -
Jumlah Total Harga 40,785.00

XII.6.5 Memasang 1 Buah Erngsel Pintu

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bahan Engsel Pintu Bh 1.000 13,000.00 13,000.00
Pekerja OH 0.015 35,000.00 525.00
Tukang Kayu OH 0.150 45,000.00 6,750.00
Tenaga Kerja
Kepala Tukang OH 0.015 65,000.00 975.00
Mandor OH - -
Jumlah Total Harga 21,250.00

XII.6.5 Memasang 1 Buah Erngsel Jendela

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bahan Engsel Jendela Bh 1.000 7,500.00 7,500.00
Pekerja OH 0.015 35,000.00 525.00
Tukang Kayu OH 0.150 45,000.00 6,750.00
Tenaga Kerja
Kepala Tukang OH 0.015 65,000.00 975.00
Mandor OH - -
Jumlah Total Harga 15,750.00

XII.6.17 Memasang 1 M² Kaca Polos Tebal 5 mm

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bahan Kaca Polos M2 1.100 100,000.00 110,000.00
Pekerja OH 0.015 35,000.00 525.00
Tukang Kayu OH 0.150 45,000.00 6,750.00
Tenaga Kerja
Kepala Tukang OH 0.015 65,000.00 975.00
Mandor OH - -
Jumlah Total Harga 118,250.00

XII.6.11 Memasang 1 Buah Grendel Jendela

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bahan Grendel Jendela Bh 1.000 7,000.00 7,000.00
Pekerja OH 0.020 35,000.00 700.00
Tukang Kayu OH 0.200 45,000.00 9,000.00
Tenaga Kerja
Kepala Tukang OH 0.020 65,000.00 1,300.00
Mandor OH - -
Jumlah Total Harga 18,000.00

XII.6.11 Memasang 1 Buah Kait Angin

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bahan Kait Angin Bh 1.000 5,000.00 5,000.00
Pekerja OH 0.015 35,000.00 525.00
Tukang Kayu OH 0.150 45,000.00 6,750.00
Tenaga Kerja
Kepala Tukang OH 0.015 65,000.00 975.00
Mandor OH - -
Jumlah Total Harga 13,250.00

XII.6.2 Memasang 1 Buah Kunci Tanam 2x Slaag

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Bahan Kunci Tanam 2x Slaag Bh 1.000 95,000.00 95,000.00
Pekerja OH 0.010 35,000.00 350.00
Tukang Kayu OH 0.500 45,000.00 22,500.00
Tenaga Kerja
Kepala Tukang OH 0.010 65,000.00 650.00
Mandor OH - -
Jumlah Total Harga 118,500.00

XIV.6.13 1 M2 Pelaburan Bidang Kayu Dengan Vernis

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Vernis Kg 0.150 15,000.00 2,250.00
Dempul Kg 0.050 7,500.00 375.00
Bahan
Amplas Lmbr 0.100 3,000.00 300.00
Kuas Bh 1.000 95,000.00 95,000.00
Pekerja OH 0.010 35,000.00 350.00
Tukang Kayu OH 0.500 45,000.00 22,500.00
Tenaga Kerja
Kepala Tukang OH 0.010 65,000.00 650.00
Mandor OH - -
Jumlah Total Harga 121,425.00

XIV.6.8 1 M2 Pengecatan Bidang Kayu Baru

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Cat Meny Kayu Kg 0.2 8,500.00 1,700.00
Plamir Kg 0.15 5,000.00 750.00
Bahan
Cat Dasar Lmbr 0.17 30,000.00 5,100.00
Cat Penutup Bh 0.26 30,000.00 7,800.00
Pekerja OH 0.07 46,000.00 3,220.00
Tukang Cat OH 0.009 2,300,000.00 20,700.00
Tenaga Kerja
Kepala Tukang OH 0.006 108,000.00 648.00
Mandor OH - -
Jumlah Total Harga 39,918.00

X.6.2 Memasang 1 Bh Kloset Duduk

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Kloset Duduk Bh
0.17 475,000.00 80,750.00
Perlengkapan 60% x Ha Ls1.000 285,000.000 285,000.00
Pekerja OH3.300 35,000.00 115,500.00
Tukang Batu OH1.100 45,000.00 49,500.00
Tenaga Kerja
Kepala Tukang OH0.001 65,000.00 65.00
Mandor OH - -
Jumlah Total Harga 530,815.00
X.6.8 Membuat 1 Bh Bak Mandi Batu Bata Vol. 0.3 m3

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Batu Bata Bh 200.000 500.00 100,000.00
Portland Cement Zak 2.400 55,000.000 132,000.00
Pekerja OH 6.000 35,000.00 210,000.00
Tukang Batu OH 3.000 45,000.00 135,000.00
Tenaga Kerja
Kepala Tukang OH 0.300 65,000.00 19,500.00
Mandor OH - -
Jumlah Total Harga 596,500.00

X.6.3.6 Memasang 1 Bh Floor Drain

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Floor Drain Bh 1.000 35,000.00 35,000.00
Pekerja OH 0.010 2,000.00 20.00
Tukang Batu OH 0.100 8,500.00 850.00
Tenaga Kerja
Kepala Tukang OH 0.010 950,000.00 9,500.00
Mandor OH - -
Jumlah Total Harga 45,370.00

XIV.6.2.4 1 M Pasang Pipa PVC Dia. 4"

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Pipa PVC Dia.4" M 1.200 65,000.00 78,000.00
Pekerja OH 0.135 35,000.00 4,725.00
Tukang Batu OH 0.225 45,000.00 10,125.00
Tenaga Kerja
Kepala Tukang OH 0.0225 65,000.00 1,462.50
Mandor OH - -
Jumlah Total Harga 94,312.50
X.6.5 Memasang 1 Buah Washtafel

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Washtafel Bh 1.000 492,000.00 492,000.00
Zak Portland Cement Zak 0.120 55,000.00 6,600.00
Pasir Pasang M3 0.010 108,000.00 1,080.00
Pekerja OH 0.135 35,000.00 4,725.00
Tukang Batu OH 0.225 45,000.00 10,125.00
Tenaga Kerja
Kepala Tukang OH 0.0225 65,000.00 1,462.50
Mandor OH - -
Jumlah Total Harga 515,992.50

VII.6.1 1 M3 Membuat Beton Tumbuk 1 : 3 : 5

Kebutuhan Satuan IndeksHarga Satuan ( Rp


Jumlah
) Harga ( Rp )
Portland Cement Zak 4.360 55,000.00 239,800.00
Pasir Beton M3 0.520 108,000.00 56,160.00
Krikil M3 0.870 187,500.00 163,125.00
Pekerja OH 1.650 35,000.00 57,750.00
Tukang Batu OH 0.250 45,000.00 11,250.00
Tenaga Kerja
Kepala Tukang OH 0.0250 65,000.00 1,625.00
Mandor OH - -
Jumlah Total Harga 529,710.00

Bau-Bau, 27 Januari 2011

Diperiksa Oleh : Disusun Oleh :


Dosen Pembimbing Mahasiswa

NOOR DHANI, S.T KELOMPOK


26,250.000

31,500.000

36,750.000

35,000.000

52,500.000

8,750.000

17,500.000

65,700.000
41,250.000

138,350.000

590,705.000

225,000.000

524,477.000

292,257.000
544,421.000

279,554,920.000

277,385,720.000

275,453,420.000

272,725,020.000
272,181,920.000

270,048,220.000

266,770,920.000

733,395.000

208,100.000
62,790.000

150,695.000

153,485.000
184,695.000

143,595.000

2,384,875.000

2,925,815.000
4,205,365.000

3,648,215.000

3,250,070.000
3,163,075.000

3,519,015.000

49,200.500
60,389.500

157,790.000

147,373.000

140,549.000 140,549.000
136,736.000

75,599.000

70,777.000

67,944.000

66,158.000

72,081.000
37,007.400

31,631.400

29,262.600

27,897.000

26,735.400

47,370.000

12,563.800
26,495.000

15,725.000

3,881,500.000

2,278,000.000

104,825.000
233,750.000

198,750.000

346,150.000

269,475.000

248,255.000

3,486,500.000
2,072,500.000

1,650,300.000

57,650.000

28,750.000

31,279.500

25,060.000
24,750.000

56,525.000

76,167.500

126,094.000

118,458.500
119,485.000

105,599.000

119,659.000

121,850.000

13,685.200

21,305.000
23,710.000

65,830.000

47,980.000

73,150.000

45,475.000

63,950.000
40,785.000

21,250.000

15,750.000

118,250.000

18,000.000

13,250.000

118,500.000
121,425.000

39,918.000

530,815.000

596,500.000

45,370.000

94,312.500

515,992.500
529,710.000
ESTIMATE ENGINEERING
RENCANA ANGGARAN BIAYA
( RAB )

Nama Tugas : Quantity Harga Satuan Pembangunan Rumah Tinggal


Mata Kuliah : Anggaran Borongan
Fakultas : Teknik
Prog. Study : Teknik Sipil

HARGA (Rp.)
NO ANL SNI URAIAN PEKERJAAN SATUAN QUANTITY
SATUAN JUMLAH
A. PEKERJAAN PERSIAPAN
1 Pek. Persiapan Lokasi Ls 1.00 300,000.00 300,000.00
2 Pek. Pembersihan Lahan Ls 1.00 200,000.00 200,000.00
3 Pek. Pengukuran / Pemasangan Bowplank Ls 1.00 200,000.00 200,000.00
4 Pek. Persiapan Air Pelaksanaan Ls 1.00 300,000.00 300,000.00
Sub total (A) 1,000,000.00
B. PEKERJAAN TANAH DAN PONDASI
1 II.6.1 Pek. Galian Tanah Biasa M3 48.00 26,250.00 1,260,000.00
2 II.6.11 Pek. Urugan Pasir Bawah Pondasi, T= 5 cm. M3 4.37 65,700.00 286,977.60
3 II.6.9 Pek. Pasangan Batu Kosong M3 18.43 292,257.00 5,386,881.02
4 II.6.3 Pek. Pasangan Batu Gunung, 1 Pc : 5 Pp M3 46.80 524,477.00 24,545,523.60
5 I.6.9 Pek. Urugan Tanah Kembali M3 8.40 8,750.00 73,500.00
6 V.6.3 Pek. Plesteran Pondasi, 1 Pc : 3 Pp M2 21.62 29,262.60 632,657.41
7 V.6.27 Pek. Acian Air Semen M2 21.62 15,725.00 339,974.50
Sub total (B) 32,525,514.14
C. PEKERJAAN KONSTRUKSI BETON BERTULANG
1 III.6.29 Pek. Sloof 15 / 20 cm, 1 Pc : 2 Pp : 3 Kr M3 2.88 2,925,815.00 8,426,347.20
2 III.6.32 Pek Kolom Utama 15/15, 1 Pc : 2 Pp : 3 Kr M3 2.13 3,250,070.00 6,907,048.76
3 III.6.35 Pek. Kolom Praktis 12/12, 1 Pc : 2 Pp : 3 Kr M' 95.00 49,200.50 4,674,047.50
4 III.6.29 Pek. Ringbalk 12/15, 1 Pc : 2 Pp : 3 Kr M3 1.73 2,925,815.00 5,055,808.32
6 III.6.29 Pek. Atap Beton 1 Pc : 2 Pp : 3 Kr M3 1.24 2,925,815.00 3,641,761.93
7 III.6.29 Pek. Meja Beton 1 Pc : 2 Pp : 3 Kr M3 0.10 2,925,815.00 294,922.15
Sub total (C) 28,999,935.87
D. PEKERJAAN DINDING
1 IV.6.1 Pek. Dinding Bata Merah 1/2 Batu, 1 Pc : 5 Pp M2 197.69 66,158.00 13,078,642.70
2 IV.6.1 Pek. Dinding Bata Merah 1/2 Batu, 1 Pc : 2 Pp M2 43.11 75,599.00 3,259,072.89
3 V.6.3 Pek. Plesteran Dinding, 1 Pc : 5 Pp M2 395.38 26,735.40 10,570,535.51
4 V.6.2 Pek. Plesteran Dinding, 1 Pc : 2 Pp M2 86.22 31,631.40 2,727,259.31
5 VII.6.36 Pek. Pasangan Dinding Keramik 20 x 25 cm M2 38.70 119,485.00 4,624,069.50
6 V.6.27 Pek. Acian Dinding M2 481.60 15,725.00 7,573,097.10
Sub total (D) 41,832,677.01
E. PEKERJAAN PASANGAN KUSEN DAN PERLENGKAPAN
1 VI.6.1 Pek. Pas. Kusen Pintu, Jendela dan Ventilasi M3 0.94 3,881,500.00 3,653,500.69
2 VI.6.6 Pek. Pas. Daun Jendela Kaca, Kayu Type Klas I M2 5.02 198,750.00 996,930.00
3 XII.6.6 Pek. Pas. Engsel Jendela Bh 30.00 15,750.00 472,500.00
4 XII.6.17 Pek. Pas. Kaca Bening, T = 5 mm M2 7.66 118,250.00 905,558.50
5 XII.6.11 Pek. Pas. Grendel Jendela Bh 15.00 18,000.00 270,000.00
6 XII.6.9 Pek. Pas. Kait Angin Bh 30.00 13,250.00 397,500.00
7 VI.6.5 Pek. Daun Pintu Panil, Kayu Type Klas I M2 19.68 233,750.00 4,600,200.00
8 VI.6.1 Pek. Pas.Papan Jalusi Mati Kayu Klas II M2 3.62 269,475.00 975,499.50
9 XII.6.5 Pek. Pas.Engsel Pintu Bh 39.00 15,750.00 614,250.00
10 XII.6.2 Pek. Pas. Kunci Tanam 2 x Slaag Bh 12.00 118,500.00 1,422,000.00
11 XIV.6.8 Pek.Pengecatan Kusen M2 31.78 39,918.00 1,268,594.04
12 XIV.6.13 Pek.Pelaburan Vernis Daun Pintu M2 39.36 121,425.00 4,779,288.00
13 XIV.6.8 Pek. Pengecatan Daun Jendela M2 10.12 39,918.00 403,970.16
14 XIV.6.8 Pek. Pengecatan Jalusi M2 8.46 39,918.00 337,706.28
Sub total (E) 20,759,790.89
HARGA (Rp.)
NO ANALISA URAIAN PEKERJAAN SATUAN VOLUME
SATUAN JUMLAH
F. PEKERJAAN RANGKA ATAP DAN ATAP
1 VI.6.14 Pek Pas. Kuda-Kuda 8/12, Kayu Klas Ii M3 1.82 2,072,500.00 3,774,669.12
2 VI.6.15 Pek.Pas. Gording 6/12,Nok,Balok Apit & Ikatan Angin Kayu Klas II M3 1.93 1,650,300.00 3,182,042.45
4 Pek. Residu Rangka Atap Ls 1.00 250,000.00 250,000.00
5 VI.6.33 Pek. Pas. Kaso 5/7 + Reng 2/3 M2 218.13 28,750.00 6,271,237.50
6 IX.6.18 Pek. Pas. Talang Patahan Atap M' 34.24 65,830.00 2,254,019.20
7 VI.6.21 Pek. Pas. Lisplank 2x 2/20 M' 21.36 25,060.00 535,281.60
8 IX.6.32 Pek. Pas. Atap Genteng Metal M2 218.13 73,150.00 15,956,209.50
9 IX.6.36 Pek. Pas. Nok Atap Genteng Metal M2 53.78 45,475.00 2,445,645.50
10 XIV.6.8 Pek. Pengecatan Lisplank M2 13.38 39,918.00 534,262.51
Sub total (F) 35,203,367.38
G. PEKERJAAN RANGKA PLAFOND DAN PLAFOND
1 VIII.6.4 Pek. Pas. Rangka Plafond Tripleks 4/6 M2 140.12 13,685.20 1,917,570.22
2 VIII.6.5 Pek. Pas. Plafond Tripleks 3 mm M2 140.12 21,305.00 2,985,256.60
3 VIII.6.5 Pek. Pas. List Plafond Profil 1/4 cm M' 259.9 23,710.00 6,162,229.00
4 XIV.6.8 Pek Pengecatan Plafond M2 140.12 39,918.00 5,593,310.16
Sub total (G) 16,658,365.98
H. PEKERJAAN LANTAI
1 I.6.10 Pek. Urugan Tanah Bawah Lantai M3 57.68 17,500.00 1,009,338.75
2 I.6.11 Pek. Urugan Pasir Bawah Lantai M3 10.79 65,700.00 708,640.20
3 VII.6.1 Pek. Lantai Floor, Tebal = 7 cm M2 107.86 529,710.00 57,134,520.60
4 VII.6.2 Pek. Pasangan Tegel Keramik 30 x30 cm M2 96.66 76,167.50 7,362,350.55
5 VII.6.36 Pek. Pasangan Tegel Keramik 20 x 20 cm M2 11.20 119,485.00 1,338,232.00
6 XIII.6.68 Pek. Pasangan Dinding Keramik 20 x 25 cm M2 38.70 105,599.00 4,086,681.30
Sub total (H)
I. PEKERJAAN SANITASI
1 X.6.2 Pas. Kloset Duduk Bh 4.00 530,815.00 2,123,260.00
2 X.6.8 Pas. Bak Mandi Batu Bata 0.3 M3 Bh 5.00 596,500.00 2,982,500.00
3 X.6.3.6 Pas. Saringan Pembuangan Dia. 2,5" Bh 5.00 45,370.00 226,850.00
4 XIV.6.2.4 Pasang Pipa Air Kotor PVC 3" Sal. Pemb. M 35.16 94,312.50 3,316,027.50
5 Pekerjaan Septick Tank 1 Unit Unit 3.00 3,000,000.00 9,000,000.00
6 Pekerjaan Sal. Air Hujan
II.6.1 Galian Tanah M3 3.19 26,250.00 83,632.50
II.6.3 Pas. Batu Gunung 1 : 5 M3 2.89 524,477.00 1,515,214.05
VII.6.1 Rabat Beton 1 : 3 : 5 M3 2.65 529,710.00 1,401,612.66
V.6.3 Plasteran 1 : 3 M2 62.10 29,262.60 1,817,207.46
V.6.27 Acian Air Semen M2 62.10 15,725.00 976,522.50
Sub total (I) 23,442,826.67
I. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Instalasi Listrik Unit 1.00 3,000,000.00 3,000,000.00
2 Pemasangan Lampu Philips 23 Watt Bh 3.00 25,000.00 75,000.00
3 Pemasangan Lampu Pijar Philips 11 Watt Bh 6.00 35,000.00 210,000.00
4 Pemasangan Lampu Philips 5 Watt Bh 8.00 25,000.00 200,000.00
5 Pemasangan Saklar Ganda Bh 6.00 18,500.00 111,000.00
6 Pemasangan Saklar Tunggal Bh 5.00 15,000.00 75,000.00
7 Pemasangan Stop Kontak Bh 9.00 15,000.00 135,000.00
8 Pemasangan Fitting Plafond Bh 17.00 10,000.00 170,000.00
9 Pemasangan Titik Lampu Titik 26.00 75,000.00 1,950,000.00
10 Pemasangan Box MCB Bh 1.00 250,000.00 250,000.00
Sub total (I) 6,176,000.00

Bau-Bau, 27 Januari 2011

Diperiksa Oleh : Disusun Oleh :


Dosen Pembimbing Mahasiswa

NOOR DHANI, S.T KELOMPOK

Referensi : SNI DT 91-0006-2007


ESTIMATE ENGINEERING
REKAPITULASI ANGGARAN BIAYA

Nama Tugas : Quantity Harga Satuan Pembangunan Rumah Tinggal


Mata Kuliah : Anggaran Borongan
Fakultas : Teknik
Prog. Study : Teknik Sipil

NO URAIAN PEKERJAAN JUMLAH HARGA

A. PEKERJAAN PERSIAPAN Rp. 1,000,000.00


B. PEKERJAAN TANAH DAN PONDASI Rp. 32,525,514.14
C. PEKERJAAN KONSTRUKSI BETON BERTULANG Rp. 28,999,935.87
D. PEKERJAAN DINDING Rp. 41,832,677.01
E. PEKERJAAN PASANGAN KUSEN DAN PERLENGKAPAN Rp. 20,759,790.89
F. PEKERJAAN RANGKA ATAP DAN ATAP Rp. 35,203,367.38
G. PEKERJAAN RANGKA PLAFOND DAN PLAFOND Rp. 16,658,365.98
H. PEKERJAAN LANTAI Rp. 23,442,826.67
I. PEKERJAAN INSTALASI LISTRIK Rp. 6,176,000.00

I Real Coast (A+B+C+D+E+F+G+H+I) Rp. 206,598,477.94


II IMB 1 % Rp. 2,065,984.78
III Total Cost Rp. 208,664,462.72
IV Dibulatkan Rp. 208,664,000.00

Terbilang : Dua Ratus Delapan Juta Enam Ratus Enam Puluh Empat Ribu Rupiah .-

Bau-Bau, 27 Januari 2011

Diperiksa Oleh : Disusun Oleh :


Dosen Pembimbing Mahasiswa

NOOR DHANI, S.T KELOMPOK

Referensi : SNI DT 91-0006-2007


8
12
96

0.10
0.50 0.50
10

0.0375
0.15
0.25
7

1.059

0.0121

#VALUE!
87.52

157790 0.15
0.25
7.00
0.26
BACK UP DATA
Nama Tugas : Quantity Harga Satuan Pembangunan Rumah Tinggal
Mata Kuliah : Anggaran Borongan
Fakultas : Teknik
Prog. Study : Teknik Sipil
Luas Lantai

KALKULASI/PERHITUNGAN
No. Uraian Pekerjaan/Sketsa SAT
Luas Penampang (M²) Panjang (M¹) Quantity

1 2 3 4 5 6
A PEKERJAAN PERSIAPAN

1 Pek. Persiapan Lokasi Ls - - 1


2 Pek. Pembersihan Lahan Ls - - 1
3 Pek. Pengukuran / Pemasangan Bowplank Ls - - 1
4 Pek. Persiapan Air Pelaksanaan Ls - - 1

B PEKERJAAN TANAH DAN FONDASI

1 Pek. Galian Tanah Biasa M³ ((1,1 + 0,9) x 0,5) / 2 = 0.5 96 48

Muka Tanah
50

90

110

2 Pek.Urugan Pasir Bawah Fondasi M³ ((0,92 + 0,9) x 0,05) / 2 = 0.0455 96 4.368

Muka Tanah
0.5 m

0.9 m

0.92 m

3 Pek. Pasangan Batu Kosong M³ ((1 + 0,92) x 0,2) / 2 = 0.192 96 18.432

Muka Tanah
0.2 m

0.92 m

1m

4 Pek. Pas. Batu Gunung 1Pc : 5Pp M³ ((0.8 + 0.25) x 0.7) / 2 = 0.4875 96 46.8

0.25 m
0.7 m

0.8 m
1 2 3 4 5 6

5 Pekerjaan Urugan Tanah Kembali M³ (((0.25 + 0.1) x 0.25) / 2) x 2 = 0.0875 96 8.4

0.25 m
0.25 m

0.1 m

5 Pekerjaan Plasteran Fondasi 1Pc : 3Pp M² (0.07 + 0.4) x 46 = 21.62 - 21.62

0.07 m

5 Pekerjaan Acian Air Semen M² (0.07 + 0.4) x 46 = 21.62 - 21.62

0.07 m

C PEKERJAAN KONSTRUKSI BETON BERTULANG

1 Pek. Sloof 15 / 20 cm, 1 Pc : 2 Pp : 3 Kr M³ 0.15 x 0.2 = 0.03 96 2.88


0.2 m

0.15 m

2 Pek. Kolom Utama 15 x 15; 1Pc : 2Pp : 3Kr M³


a. Tinggi Kolom = 4.2 m 0.15 x 0.15 = 0.022 25.2 0.5544

Banyaknya Kolom = 6 Bh
Panjang Total :
= 6 x 4.2
= 25.2 m
4 .2 m
1 2 3 4 5 6

b. Tinggi Kolom = 3.4 m M³ 0.15 x 0.15 = 0.022 71.4 1.5708

Banyaknya Kolom = 21 Bh
Panjang Total :
= 21 x 3.4
= 71.4 m

3 .4 m

Jumlah 2.1252

3 Pek. Kolom Praktis 12 x 12; 1Pc : 2Pp : 3Kr


a. Tinggi Kolom = 4.2 m M' 16.8 16.8

Banyaknya Kolom = 4 Bh
Panjang Total :
= 4 x 4.2
= 16.8m
4 .2 m

b. Tinggi Kolom = 3.4 m M' 78.2 78.2

Banyaknya Kolom = 23 Bh
Panjang Total :
= 23 x 3.4
= 78.2 m
3 .4 m

Jumlah 95

4 Pek. Ring Balk 12/15; 1Pc : 2Pp : 3Kr M³ 0.12 x 0.15 = 0.018 96 1.728
0.15 m

0.12 m

5 Pek. Plat Beton T = 10 cm & Meja Beton T = 8 cm ; 1Pc : 2Pp : 3 Kr


M³ a) (1.13 x 0.63) x 2 = 1.42 0.1 0.142
a. Plat A (2 buah) M³ b) ((1.41 + 0.75) x 0.1) x 2 = 0.432 0.15 0.0648
1.13 m
0.63 m

Ø10-10
0.75 m

Ø10-10
Ø10-10

Ø10-10

A
1.41 m

0.1 m
0.15 m
0.1 m

0.63 m
Potongan A
1 2 3 4 5 6
b. Plat B (2 buah)

M³ a) ((1.36 + 1.38) x 1.63) x 2 = 8.93 0.1 0.893


2.98 m M³ b) ((2.98 + 1.85) x 0.1) x 2 = 0.966 0.15 0.1449
1.38 m 1.36 m

B
1.85 m
1.63 m

0.1 m

0.15 m
0.1 m

1.63 m

Potongan B

c. Pek.Meja Beton M³ 1.26 0.08 0.1008

71
Luas Penampang 1.26 m²
Tebal = 8 cm
50
34

85
1. 26 m²

213

50

D PEKERJAAN DINDING

1 Pekerjaan Dinding Bata Merah Tebal 1/2 Bata; 1Pc : 5Pp M² 197.688 197.688 197.688
a. Tinggi 3.4 m

Panjang = 75 m
Luas = 75 x 3.4 = 255 m²
3.6 m

0.1 m

b. Tinggi 4.2 m
Panjang = 6.6 m
Luas = 6.6 x 4.2 = 27.72 m²
4.2 m

0.1 m

c. Tinggi 3.3 m
Panjang = 4.6 m
Luas = 4.6 x 3.3 = 15.18 m²
3.3 m

0.1 m

Jumlah Total Luas Pasangan (termasuk luas kusen) = 297.9 m²

Luas Kusen
1.3 m

(1) 2.05 x 1.3 = 2.665 m²


2.05 m

DETAIL PJ (1 buah)
1 2 3 4 5 6

0.9 m

(2) (0.9 x 2.05) x 7 = 12.915 m²


2.05 m

DETAIL P1 (7 buah)

(3) (0.27 x 0.36) x 42 = 4.082 m²


0.27 m
0.36 m

DETAIL VENTILASI (42 buah)

0.7 m (4) (0.7 x 1.8) x 4 = 12.24 m²


1.8 m

DETAIL J1 (4 buah)

0.45 m (4) (0.45 x 1.8) x 15 = 21.6 m²


1.8 m

DETAIL J2 (15 buah)


Total Luas Kusen = 53.502 m²
Luas Pas. Batu Bata 1 Pc : 2Pp = 46.71 m²
Total Luasan Pasangan Batu Bata 1Pc : 5Pp =
297.9 - 53.502 - 46.71 = 197.688 m²

2 Pekerjaan Dinding Bata Merah Tebal 1/2 Bata; 1Pc : 2Pp M² 43.11 43.11
a. Tinggi 1.5 m
Panjang = 24.44 m
Luas = 1.5 x 27.64 = 36.66 m²
1.5 m

0.1 m

b. Tinggi 0.3 m
Panjang = 21.5 m
Luas = 21.5 x 0.3 = 6.45 m²
0 .3 m

0.1 m

Jadi Luas Pas Bata Merah Tebal 1/2 Bata; 1Pc : 2Pp =
36.66 + 6.45 = 43.11 m²

3 Pekerjaan Plasteran Dinding Bata Merah; 1Pc : 2Pp M² 86.22 86.22


Luas Pasangan : 43.11 m²
Luas Plasteran = 43.11 x 2 = 86.22 m²

4 Pekerjaan Plasteran Dinding Bata Merah; 1Pc : 5Pp M² 395.376 395.376


Luas Pasangan : 197.688 m²
Luas Plasteran = 197.688 x 2 = 395.376 m²
1 2 3 4 5 6
5 Pekerjaan Pas. Dinding Keramik 20/25 M² 38.7 38.7

Panjang = 5.16 m
Luas = 5.16 x 1.5 = 7.74 m²

1.35 m Jumlah Wc + Ruang Cuci = 5 Bh


Jadi Total Pasangan Dinding
0 .8 3 m

Keramik = 7.74 x 5 = 38.7 m²


1 .6 m

WC/KM A

-0.10

1.38 m
1 .5 m

6 Pekerjaan Acian Dinding M² 481.596 481.596


Plasteran Dinding
Potongan A Bata Merah; 1Pc : 5Pp = 395.376 m²
Plasteran Dinding Bata Merah; 1Pc : 2Pp = 86.22 m²
Total Acian Dinding Bata = 395.376 + 86.22 = 481.596 m²

E PEKERJAAN PASANGAN KUSEN DAN PERLENGKAPAN

1 Perkerjaan Pasangan Kusen Pintu, Jendela & Ventilasi M³ 0.005 156.5 0.7825
M³ 0.003 52.92 0.15876
Panjang Kusen :
1.3 +(1.95 x 2) = 5.2 m
1.3 m
1.95 m

Panjang Kusen :
DETAIL P1 (1 buah)
(0.9 +(1.95 x 2)) x 7 = 33.6 m
0.9 m
1.95 m

DETAIL P2 (7 buah) Panjang Kusen :


(0.8 +(1.95 x 2)) x 4 = 18.8 m
0.8 m
1.95 m

DETAIL P3 (4 buah)
Panjang Kusen :
((0.7 x 5) + (1.8 x 2)) x 4 = 28.4 m
0.7 m
1.80 m

DETAIL J1 (4 buah)
1 2 3 4 5 6

Panjang Kusen :
0.55 m
((0.55 x 2) + (1.8 x 2)) x 15 = 70.5 m
1.8 m

DETAIL J2 (15 buah)


Panjang Kusen :
0.27 m ((0.27 x 2) + (0.36 x 2)) x 42 = 52.92 m
0.36 m

DETAIL VENTILASI (42 buah)

Luas Penampang Kusen : 0.05 x 0.1 = 0.005 m²


0.05 m
0.1 m

Luas Penampang Kusen : 0.03 x 0.1 = 0.003 m²


(ventilasi)
0.03 m
0.1 m

2 Pek. Pas. Daun Jendela Kaca, Kayu Type Klas I M² 5.016 5.016

Panjang
0.37 m (0.37x 2) + (1.72 x 2) x 15 = 62.7 m

Luas Penampang = 62.7x 0.08 = 5.016


1.72 m

0.08 m

3 Pek.DETAIL
Pas. Engsel
J2 (15 buah) Jendela Bh 30
Jumlah Daun Jendela = 15 Bh
Jumlah Engsel = 15 x 2 = 30 Bh

4 Pek. Pas. Kaca Bening, T = 5 mm M² 2.207 + 5.451 = 7.658 7.658

Luas Kaca :
0.62 m [4 x ((0.62 x 0.32) x 2) + ((0.5 x 0.62)
x 2)] = 2.207 m²
0.32 m
0.5 m

DETAIL J1 (4 buah)
Luas Kaca :
(1.58 x 0.23) x 15 = 5.451 m²
0.23 m
1.58 m

DETAIL J2 (15 buah)


5 Pek. Pas. Grendel Jendela Bh 15
Jumlah Daun Jendela = 15 Bh
Jumlah Engsel = 15 Bh

6 Pek. Pas. Kait Angin Bh 30


Jumlah Daun Jendela = 15 Bh
Jumlah Kait Angin = 15 x 2 = 30 Bh
1 2 3 4 5 6

7 Pek. Daun Pintu Panil, Kayu Type Klas I M² 2.44 + 11.48 + 5.76 = 19.68 19.68

Luas = 1.22 x 2 = 2.44 m²

1.22 m
2m

Luas = (0.82 x 2) x 7 = 11.48 m²


DETAIL P1 (1 buah) 0.82 m
2m

0.72 m

Luas = (0.72 x 2) x 4 DETAIL


= 5.76 P2 (7 buah)

2m

8 Pas. Jalusi Mati Kayu Klas II M² 0.12 x 30.24 = 3.62 3.62

DETAIL P3(4 buah)


3
30
3

12 POT.1
12

Lebar Jalusi 12 cm
3 21 3
Panjang JalusiPOT.2
= (0.36 x 2) x 42 Bh = 30.24 m
DETAIL VENTILASI (42 buah)
9 Pek. Pas.Engsel Pintu Bh 39
Jumlah Daun Pintu = 13
Jumlah Engsel = 13 x 3 = 39 Bh

10 Pek. Pas. Kunci Tanam 2 x Slaag Bh 12


Jumlah Pintu = 12 Bh
Jumlah Kunci Tanam = 12 Bh

11 Pek.Pengecatan Kusen
(a) Pengecatan Kusen Pintu & Jendela M² 25.62 + 6.16 = 31.78 31.78

Panjang = 156.5 - 28.4 (Panjag Kusen J1) = 128.1 m

Lebar Pengecatan =(0.05 x 2) + 0.1 = 0.2 m


Luas Pengecatan = 128.1 x 0.2 = 25.62 m²
0.05 m

Untuk J1 Luas Pengecatannya =


0.1 m

Lebar Pengecatan 30 cm
(0.6 x 3) x 0.3 = 0.54 m²
Lebar Pengecatan 20 cm
60 cm
(1.8 + 1.8 + 0.7 + 0.7) x 0.2 = 1 m²

Total Pengecatan untuk J1 =


(0.54 + 1) x 4 Bh = 6.16 m²
180 cm

(b) Pengecatan Kusen Ventilasi M² 16.38 16.38

70 cm Panjang = 0.57 m
Lebar = (0.3 x 2) + 0.1 = 0.7 m
Luas = 0.57 x 0.7 =0.39 m²
27 cm
Total Luas =
0.39 x 42 Bh = 16.38 m²
3
30 cm

30
3

12
12

3 21 3
30 cm

30
3
12

12
3 21 3

1 2 3 4 5 6

12 Pengecatan daun Pintu M² 39.36


Luas Daun Pintu =19.68 m²
Luas Pengecatan = 19.68 x 2 =39.36 m²

12 Pek. Pengecatan Daun Jendela M² 10.12


Luas Daun Jendela = 5.06 m²
Luas Pengecatan = 5.06 x 2 = 10.12 m²

13 Pek.Pengecatan Jalusi M² 8.46


3
30
3

12 POT.1
12

3 21 3
POT.2

DETAIL VENTILASI (42 buah)


Luas Penampang Pengecatan :
(((0.02 x 0.36) x 4) + ((0.12 x 0.36) x 4)) x 42 Bh Ventilasi = 8.46 m²

F PEKERJAAN RANGKA ATAP DAN ATAP

1 Pek Pas. Kuda-Kuda 8/12/,6/12, Kayu Klas II M³ 0.012 x 0.08 = 0.0096 189.72 1.821312
a.) Kuda-kuda 1 (2 Bh) 0.06 x 0.12 = 0.0072 15.98 0.115056
278
1.6 m

100

461

Panjang 8/12 = ((2 x (5.09 + 1 +4.61 + 2.21)) + 1 +2.78) x 2 = 59.2 m


Panjang 6/12 = (4 x 1.6) x 2 = 12.8 m

b.) Kuda-kuda 1 (1/2) = 2 Bh


1.59 m

4.34 m

Panjang = 2 x (4.34 + 5.74 + 2.09 + 1 + 0.53) = 27.4 m


Panjang 6/12 = 1.59 2 =3.18 m
1.28 m

m
2.9 0.7
6 m

1.85 m

Panjang 8/12 = ((2 x (1.85 + 2.9 +076)) + 1.28) x 2 = 24.6 m

d.) Kuda-kuda 2 (1/2) = 2 Bh

1.74 m

Panjang = 2 x (2.74 + 1.74 + 0.59 + 0.53) = 11.2 m


1 2 3 4 5 6

e.) Balok jurai K1 = 4 Bh

7.6
2 m

1m
0.65 m

Panjang = 4 x (1 +7.62 +0.65) = 33.08 m

e.) Balok jurai K2 = 8 Bh


0.56 m

Panjang = 8 x (0.56 + 3.72) = 34.24 m

Total panjang kayu 8/12 :


59.2 + 27.4 + 24.6 + 11.2 + 33.08 + 34.24 = 189.72 m
Total panjang kayu 6/12 :
12.8 + 3.18 = 15.98 m

Luas penampang = 0.08 x 0.12 = 0.0096 m²


0.08 m
0.12 m

Luas penampang = 0.06 x 0.12 = 0.0072 m²


0.06 m
0.12 m

2 Pekerjaan Pas. Gording 6/12, Ikatan Angin 6/12 & Nok 8/12 M³ 0.06 X 0.12 = 0.0072 251.82 1.813104
a. Gording

5.07 m

4.07 m

2.33 m
3.27 m 3.27 m
2.82 m

2.82 m
2.82 m

2.82 m

0.59 m
2.4 m 2.4 m
2.82 m
2.82 m

2.28 m 2.28 m
2.82 m

2.82 m

2.28 m 2.28 m

2.28 2.28

3.42 m
10.12 m
10.12 m

6.64 m

3.16 m

8.38 m
8.38 m

3.16 m

6.64 m
4.9 m

4.9 m
1.3 m
1.3 m

3.42 m

2.28 2.28

2.28 m 2.28 m
2.82 m

2.82 m

2.28 m 2.28 m
2.82 m
2.82 m

2.4 m 2.4 m
2.82 m

2.82 m

0.59 m
2.82 m

2.82 m

3.27 m 2.33 m 3.27 m

4.07 m

5.07 m

Panjang Gording : 238.32 m

b. Ikatan angin

Panjang = 2.54 x 2 = 5.08 m


1 2 3 4 5 6

c. Nok 3m

2.42 m
3m

Panjang = 2.42 + 3 + 3 = 8.42 m

Panjang total Pas. Gording 6/12, Ikatan Angin 6/12 & Nok 8/12
= 238.32 + 5.08 + 8.42 = 251.82 m

Luas penampang = 0.06 x 0.12 = 0.0072 m²


0.06 m
0.12 m

3 Pek. Pas. Kaso 5/7 + Reng 2/3 M² 218.13

8.77 M²

9.31 M² 9.31 M²

35.1 M²
32.88 M² 32.88 M²
35.1 M²

9.31 M² 9.31 M²

8.77 M²

Luas Pas Reng & Kasau :


8.77 + 9.31 + 9.31 + 35.1 + 35.1 + 32.8 + 32.8 + 9.31 + 9.31
+ 9.31 + 8.77 = 218.13 m²

2 Pek. Pas. Talang Patahan Atap M' 34.24 34.24


Panjang Jurai Dalam = 34.24 m

3 Pek. Pas. List Plank 2.2/20 M' 0.4 53.4 21.36

5.55 m

1.49 m 1.49 m
2.82 m

2.82 m
10.75 m

10.75 m
2.82 m

2.82 m

3.27 m 3.27 m

5.55 m
Panjang List Plank :
5.55 + 2.82 + 2.82 + 3.27 + 3.27 + 10.75 + 10.75 + 1.49 +
1.49 + 2.82 + 2.82 + 5.55 = 53.4 m

4 Pek. Pas. Atap Genteng Metal M² 218.13


Luas Atap = Luas Kaso Dan Reng = 218.13 m²
1 2 3 4 5 6

5 Pek. Pas. Nok Atap Genteng Metal M' 53.78


3M

2.42 M
3M

Panjang Nok Genteng Metal :


(2 x (3.72 + 3.72 + 3)) + (7.62 x 4) + 2.42 = 53.78 m

6 Pek. Pengecatan Lisplank 13.384


Panjang List Plank = 53.4 m

Lebar = 0.25 + 0.1 = 0.26m²

7 Pek. Pas. Rangka Plafond Tripleks 4/6 M² 140.12

7.23 m²

2.24 m² 2.24 m² 2.24 m² 2.24 m²

13.43 m²

9.1 m²
1.69 m²

1.9 m²
29.5 m²
8.9 m²

8.9 m²

2.24 m²
2.24 m²

12.1 m² 9.9 m² 12.1 m²

4.7 m²

7.23 + 4.7 + (12.1 x 2) + (2.24 x 7.23


6) +m²29.5 + 1.69 + 1.9 + 9.1
+ 13.43 + 7.23 + (8.9 x 2) = 140.12 m²

8 Pek. Pas. Plafond Tripleks 3 mm M² 140.12

9 Pek. Pas. List Plafond Profil 1/4 cm M 259.9

22.86 m

6.02 m 6.02 m 6.02 m 6.02 m

14.68 m

12.18 m
5.62 m

5.6 m
30.78 m
27.69 m
27.69 m

6.02 m 6.02 m

16 m 12.68 m 16 m

9.68 m

22.86 m

Panjang List Plafon :


(2 x 22.68) + 9.68 + (2 x 16) + 12.68 + (6.02 x 6) + 5.62 +
5.6 + 30.78 + 12.18 + 14.68 + (2 x 27.6) = 259.9 m

10 Pek Pengecatan Plafond M² 140.12


Luas Pengecatan = Luas Plafon = 140.12 m²

H PEKERJAAN LANTAI

1 Pek. Urugan Tanah Bawah Lantai M³

2.24 m² 2.24 m² 2.24 m² 2.24 m²


t = 45 cm t = 45 cm t = 50 cm
t = 45 cm

13.43 m²
t = 55 cm

9.1 m²
t = 55 cm
1.69 m²
t = 50 cm

1.9 m²
29.5 m² t = 50 cm
t = 55 cm

2.24 m²
2.24 m² t = 45 cm
t = 45 cm

a) Tebal12.1
Lapisan
m² 55 cm
9.9 m² 12.1 m²
t = 55 cm

t = 55 cm t = 55 cm
86.13 0.55 47.3715
Luas Lantai = 9.9 + (2 x 12.1) + 29.5 + 9.1 + 13.43 = 86.13 m²
b) Tebal Lapisan 50 cm
4.7 m²
t = 50 cm
M³ 10.53 0.5 5.265
Luas Lantai = 4.7 + 1.69 + 1.9 + 2.24 = 10.53 m²
c) Tebal Lapisan 45 cm M³ 11.2 0.45 5.04
Luas lantai = 2.24 x 5 = 11.2 m²

2 Pek. Urugan Pasir Bawah Lantai M³ 107.86 0.1 10.786


Luas lantai = 86.13 + 10.53 + 11.2 = 107.86 m²
Tebal Lapisan = 10 cm

3 Pekerjaan Lantai Floor Tebal 7 cm M² 107.86 107.86


Luas Lantai = 107.86 m²

4 Pek. Pasangan Tegel Keramik 40 x 40 cm M² 96.66 96.66

2.24 m²
t = 50 cm

13.43 m²

9.1 m²
1.69 m²

1.9 m²
29.5 m²

Luas Tegel 40m²x 40 : 9.9 m²


12.1 12.1 m²
4.7 + (12.1 x 2) + 9.9 + 29.5 + 1.69 + 1.9 + 9.1 + 2.24 +
13.43 = 96.66 m²
4.7 m²

5 Pek. Pasangan Tegel Keramik 20 x 20 cm M² 11.2 11.2

2.24 m² 2.24 m² 2.24 m²

Luas Tegel 20 x 20 : 2.24 X 5 = 11.2 m²


2.24 m² 2.24 m²
1 2 3 4 5 6
I PEKERJAAN SANITASI

Peresapan Septick Tank

Peresapan
Peresapan

0.62 m

0.66 m
3.99 m
3.67 m

Septick Tank
Septick Tank
1.72 m
1.7 m
3.1 m
1 Pasang Klosed Duduk Bh 4
Jumlah Wc/Km = 4
Jumlah Kloset Duduk = 4 Bh

2 Pasang Bak Mandi Batu Bata Vol. 0.3 m³ Bh 5


Jumlah Wc/Km = 4 ruangan
R.Cuci 1 ruangan
Jadi Jumlah Bak Air = 4 + 1 = 5 Bh

3 Pasang saringan Pembuangan Bh 5


Jumlah Wc/Km = 4 ruangan
R.Cuci 1 ruangan
Jadi jumlah saringan pembungan = 4 + 1 = 5 Bh

4 Pasang Pipa Air Kotor PVC 3" Sal. Pembuangan M 35.16 35.16
Panjang Pipa = 3.25 + 4.46 + 3.01 + 4.68 + 0.62 + 3.9 +
1.72 + 3.1 + 1.7 + 3.67 + 0.6 + 4.45 = 35.16 m

5 Pasangan Washtafel Bh 1
Jumlah Wastafel = 1 unit

6 Pas. Kran Air Dia 3/4" Bh 5

7 Pekerjaan Septick Tank 1 Unit Unit 3

8 Pekerjaan saluran air hujan M³ 0.35 x 0.17 = 0.059 54 3.186


(a) Galian Tanah

Panjang saluran = 54 m
17 cm

(b) Pasangan Trisik Batu Gunung 1 : 5 M³ 0.0535 54 2.889


35 cm
Luas Penampang = 0.0535 m²
Panjang 54 m
43

(c) Rabat Beton 1:3:5


0.0535 m² M³ 0.049 54 2.646
20 30 20

Rabat Beton
1Pc : 3Ps : 5Kr

0.049 m²
Rabat Beton
1Pc : 3Ps : 5Kr

Luas Penampang
0.049 m²
= 0.049 m²
Panjang Rabat = 54 m

(d) Plasteran 1 : 3 M² 1.15 54 62.1

Lebar = (0.1 x 3) + 0.15 + 0.07 = 1.15 m


Panjang Plasteran = 54 m

10 10
7
10

15

I PEKERJAAN ELEKTRIKAL