Professional Documents
Culture Documents
viewNitPdf 2792504
viewNitPdf 2792504
TENDER DOCUMENT
Tender No: C-130-MechClean-BKSC-19 Closing Date/Time: 04/07/2019 15:00
Sr.DCM/ADRA acting for and on behalf of The President of India invites E-Tenders against Tender No C-130-MechClean-BKSC-19
Closing Date/Time 04/07/2019 15:00 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only.
Manual offers are not allowed against this tender, and any such manual offer received shall be ignored.
Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only
payment modes available on IREPS portal like net banking, debit card, credit card etc. Manual payments through Demand draft, Banker
cheque, Deposit receipts, FDR etc. are not allowed.
1. NIT HEADER
Regular Mechanized Cleaning and upkeep of BOKARO STEEL CITY Station including Rag
Name of Work picking (Station to Home Signal both Side) and final disposal of garbage for a period of 4
(Four) years.
Bidding type Normal Tender
Tender Type Open Bidding System Two Packet System
Tender Closing Date Time 04/07/2019 15:00 Date Time Of Uploading Tender 08/06/2019 11:05
Pre-Bid Required No Pre-Bid Query Date Time Not Applicable
Advertised Value 44518388.40 Tendering Section CLEANING
Bidding Style Single Rate for Each Schedule Bidding Unit
Earnest Money (Rs.) 372600.00 Validity of Offer ( Days) 60
Tender Doc. Cost (Rs.) 10000.00 Period of Completion 48 Months
Contract Type Service Contract Category Expenditure
Are Joint Venture (JV) firms
Bidding Start Date 20/06/2019 Yes
allowed to bid
Ranking Order For Bids Lowest to Highest Expenditure Type Revenue
2. SCHEDULE
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding
Unit
Above/
Schedule NS1-Unskilled Labour 25655718.60
Below/Par
UnSkillled 39420.00 Numbers 650.83 25655718.60 AT Par 25655718.60
Item Description:- Unskilled Labour Rate. This schedule is completely dependent upon the Labour Rates by
Ministry of Labour, and there is special condition in the Tender which takes care of Increase/Decrease in rate for
1 this schedule. Since, the rate mentioned in NS1 is constant, it is recommended as non-biddable. However if any
tenderer bids for the same the rate quoted by the tenderer will not be considered and the rates for the item given
in the NS1 & NS2 shall be taken " AT PAR" . The tenderers should offer their rates for NS3, NS4, NS5 & NS6 only
(Rate including GST @ 18%). Note: - Rate for 27 nos of unskilled labour for 1460 days @ Rs. 650.83/-
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding
Unit
Above/
Schedule NS2-Semi Skilled Labour+ Semi Skilled(Supervisor) 9671302.80
Below/Par
SemiSuperV 13140.00 Numbers 736.02 9671302.80 AT Par 9671302.80
Item Description:- Rate (Including GST@ 18%) for semi skilled labour(Supervisor). This schedule is completely
dependent upon the Labour Rates by Ministry of Labour, and there is special condition in the Tender which takes
1 care of Increase/Decrease in rate for this schedule. Since, the rate mentioned in NS2 is constant, it is
recommended as non-biddable. However if any tenderer bids for the same the rate quoted by the tenderer will not
be considered and the rates for the item given in the NS1 & NS2 shall be taken " AT PAR" . The tenderers should
offer their rates for NS3, NS4, NS5 & NS6 only (Rate including GST @ 18%). Note: - Rate for 9 nos of Semiskilled
labour (8) & Supervisor (1) for 1460 days @ Rs. 736.02/-
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding
Unit
Schedule NS3-Cost of Consumable Material & Dress of Labours 2339174.00 Rs.
ConsDressL 1.00 Numbers 2339174.00 2339174.00 AT Par 2339174.00
1 Item Description:- Consumable Cleaning Materials like- Brooms, Phenyl, Bleaching and dress of labours
etc(including GST @ 18%). Note: - Details are in Tender Documents Pg No-13(Attached in Document).
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding
Unit
Schedule NS4-Cost of Garbage Disposal 2450020.00 Rs.
GarbDispos 1.00 Numbers 2450020.00 2450020.00 AT Par 2450020.00
1 Item Description:- Cost of Disposal of Garbage.(including GST @ 18%). Note: - Details are in Tender Documents
Pg No-11(Attached in Document).
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding
Unit
Schedule NS5-Cost of Machineries 2317879.00 Rs.
MachCost 1.00 Numbers 2317879.00 2317879.00 AT Par 2317879.00
1 Item Description:- Cost of Machineries Including GST@ 18%. Note: - Details are in Tender Documents Pg No-11
& 12(Attached in Document).
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding
Unit
Schedule NS6-Management Cost 2084294.00 Rs.
ManagCost 1.00 Numbers 2084294.00 2084294.00 AT Par 2084294.00
1 Item Description:- Management Cost Including GST@ 18%. Note: - Details are in Tender Documents Pg No-
12(Attached in Document).
3. ITEM BREAKUP
4. ELIGIBILITY CONDITIONS
Submission of Affidavit
5. COMPLIANCE
Commercial-Compliance
Allowed
11.1 Permanent Account Number card. Yes Yes
(Mandatory)
Allowed
11.2 Provident Fund Registration Number and all related documents. Yes Yes
(Mandatory)
Allowed
11.3 E.S.I registration number with all related documents. Yes Yes
(Mandatory)
Allowed
11.4 AADHAR Card Yes Yes
(Mandatory)
Allowed
11.5 I.T declaration , 3 years Audited Balance Sheet Yes Yes
(Mandatory)
Allowed
11.6 labour Department Registration Number with all related documents. Yes Yes
(Mandatory)
Allowed
11.7 G.S.T number and all related documents. Yes Yes
(Mandatory)
Please enter the percentage of local content in the material being offered.
Please enter 0 for fully imported items, and 100 for fully indigenous items. The Allowed
12 No Yes
definition and calculation of local content shall be in accordance with the Make (Optional)
in India policy as incorporated in the tender conditions.
General Instructions
Offers shall be as per the Indian Railways General Conditions of Contract for
5 services and the Special Conditions of Contract, which are a part of the tender No No Not Allowed
paper.
In case of any deviation from the requirement of tender specifications,
6 instructions to tenderers or General & Special Conditions of contract, the same No No Not Allowed
should be brought out by the tenderer.
All the copies of Annexures enclosed with the tender paper should be duly
7 filled in by the tenderer and submitted along with the tender duly signed and No No Not Allowed
stamped on each page.
The standard payment terms subject to recoveries of any amount under the
8 No No Not Allowed
liquidated damages clause of contract will be as under:-
The contractor shall submit their monthly bills containing each item of list 1(a-
b) duly certified by the Railway Administration representative (SMR/of the
station), for the purpose of settlement and payments. The first monthly
payment shall be released only after the contractor has fulfilled his
responsibility of submitting labour license and other necessary documents and
8.1 No No Not Allowed
maintaining records in compliance with labour laws, rules and regulations and
as required by us. The payment will be made to the firm/contractor on
completion of satisfactory work. Bills in four copies accompanied with challan,
inspection certificate should be submitted to Sr. Divisional Commercial
Manager office/Adra for arranging payment through Accounts Department.
A sum equal to the contractual amount per month for the entire cleaning
8.2 No No Not Allowed
contract as detailed in LIST-1 (a-b) will be paid as per agreement.
Payments, as in clause 8 (8.1 & 8.2) above, shall be subject to deductions of
any amount for which the contractor is liable under the contract against this
9 No No Not Allowed
tender or any other contract in respect of which the President of India is the
contracting authority.
The Rly. Administration may accept a tender, reject any tender without
10 No No Not Allowed
assigning any reason and may not accept the lowest rate of any tender.
Acceptance of tender will be communicated by a formal acceptance letter (by
11 registered post) of the tender direct to the contractor, which may be deemed No No Not Allowed
to conclude the contract.
The volume of cleaning work and disposal of garbage required to be handled
as shown in the enclosed statement is approximate and it should be clearly
understood that this information is furnished to the tenderers without prejudice
and without commitment on the part of the Railway Administration. The volume
12 of work is likely to fluctuate (increase or decrease). The tenderer(s) should No No Not Allowed
note that no change in the rate tendered and accepted, or any claim for
compensation arising directly or indirectly out of such fluctuations in the
volume of work to be handled, shall be entertained during the currency of the
agreement.
Tenderer(s) should inspect the site of work at the station and satisfy
13 themselves regarding local conditions, nature and volume of work to be dealt No No Not Allowed
with to enable them to quote the rate.
Tenderer(s) further is/are advised in his/their own interest to inspect the place
14 of work at the station in question to acquaint himself/themselves of local No No Not Allowed
conditions applicable.
The agency should ensure the availability of Four cleaning staff for attending
15 emergency services ( on station or on train ) during night time at BOKARO No No Not Allowed
STEEL CITY Station.
The tenderers must ensure that the conditions laid down for submission of
offers detailed in the preceding pares are completely and correctly fulfilled.
16 No No Not Allowed
Tenders which are not complete in all respects, as stipulated above, may be
summarily rejected.
(i) All the workers or labour employed directly or indirectly by the contractor
must be enrolled under the Pradhan Mantri Jan Dhan Yojana ( PMJDY). (ii) All
the workers or labour employed directly or indirectly by the contractor between
the ages 18-70 years must be enrolled under the Pradhan Mantri Suraksha
Bima Yojona(PMSBY). The contractor will be responsible to pay the premium
per annum per member for all her / his workers during the contract period. (iii)
29 All the workers or labour employed directly or indirectly by the contractor No No Not Allowed
between the ages 18-50 years must be enrolled under the Pradhan Mantri
Jeevan Jyoti Bima Yojona. The contractor will be responsible to pay the
premium per annum per member for all her / his workers during the contract
period. The contractor must submit documentary evidence to show the
coverage of all her/his workers or labour under the above mentioned schemes
at all times during the contract period on an annual basis.
(a) The contractor should have GST registration number and the GST amount
shall be borne by the Railways. The amount will be paid by the contractor and
will be reimbursed, on production of documents. (b) Contractor Should have to
maintain a Data Base of all workers including their attendance data and salary
30 details in "Digital Management Labour System". and all its time to time No No Not Allowed
amendments. (c) Contractor should have to maintain 2 types of Dustbins ie
Bio-Degradable and Non- Bio degradable. (d) Cleaning of drain in station
premises should be done in presence of PWI /staff . Drain cover should be
uncovered, clean and then properly placed back.
The contractor shall abide by the clauses of GCC for services 2018 as
31 No No Not Allowed
amended from time to time.
Special Conditions
(v) In case tenderer opts for payment through LC, following shall be the
procedure to deal release of payment through LC: .(a) The LC shall be a sight
LC (b) The contractor shall select his Advising/Negotiating bank for LC The
incidental cost towards issue of LC and its operation thereof shall be borne by
the contractor.(c) SBI, New Delhi, Main Branch will be the nodal branch for
issue of LCs based on online requests received from Railway Accounts Units
for tenders opened in financial year 2018-19. SBI branches where the
respective Railway Accounts Office has its Account (local SB1 branch) will be
the issuance/reimbursing branch for LC issued under this arrangement. The
Bank shall remain same for this tender till completion of contract. The
incidental cost @ 0.15% per annum of LC value, towards issue of LC and
operation thereof shall be borne by the contractor and shall be recovered from
his bills. (d) The LC shall be opened initially for duration of 180 to 365 days in
3 consultation with contractor. The LC shall be extended time to time as per the No No Not Allowed
progress of the contract, on the request of the contractor. The value of LC to
be opened initially as well as extended thereafter shall be finalised by the
engineer in consultation with the contractor on the basis of expected progress
of work. (e) The LC terms and conditions shall inter-alia indemnify and save
harmless the Railway from and against all losses, claims and demands of
every nature and description brought or recovered against the Railways by
reason of any act or omission of the contractor, his ,agents or employees, in
relation to the Letter of Credit (LC). All sums payable/borne by Railways on
this account shall be considered as reasonable compensation and paid by
contractor. (f) The LC terms and conditions shall inter-alia provide that
Railways will issue a Document of Authorisation (format enclosed as Annexure
2) after passing the bill for completed work, to enable contractor to claim the
authorized amount from their bank
g) The acceptable, agreed upon document for payments to be released under
the LC shall be the Document of Authorisation. (h) The Document of
Authorisation shall be issued by Railway Accounts Office against each bill
passed by Railways. (i) On issuance of Document of Authorisation, a copy of
Document of Authorisation shall be posted on IREPS for download by the
contractor. A digitally signed copy of Document of Authorisation shall also be
sent by Railway Accounts Office to Railway's bank (Local SBI Branch). (j) The
contractor shall take print out of the Document of Authorisation available on
IREPS and present his claim to his bank (advising Bank) for necessary
payments as per LC terms and conditions. Their claim shall comprise of copy
of Document of Authorisation, Bill of Exchange and Bill. (k) The payment
4 against LC shall be subject to verification from Railway's Bank (Local SBI No No Not Allowed
Branch). (I) The contractor's bank (advising bank) shall submit the documents
to the Railway's Bank (Local SBI Branch). (m) The railway's bank (issuing
bank) shall, after verifying the claim so received w.r.t. the digitally signed
Document of Authorisation received from Railway Accounts Office, release the
payment to contractor's bank (advising bank) for crediting the same to
contractor's account. (n) Any number of bills can be dealt within one I.C,
provided the sum total of payments to contractor is within the amount for which
LC has been opened. (0) The LC shall be closed after the release of final
payment including P VC amount, if any, to the contractor. (p) The release of
performance guarantee or security deposit shall be dealt directly by railway
with the contractor i.e., not through LC
5 The quoted rate should be with GST. No No Not Allowed
No compensation towards any accident what so ever will be paid by the
6 No No Not Allowed
Railway.
Contractor Should have to maintain a Data Base of all workers including their
7 attendance data and salary details in " Digital Management Labour System" as No No Not Allowed
per GCC for services 4.44.
The bidder shall submit an affidavit on a stamp paper to the effect that all the
documents submitted by her along with her bid are true. This shall be
8 No No Not Allowed
mandatory in all bids. The bid shall be summarily rejected if the bidder fail to
submit this undertaking along with the bid as per GCC for services 2.6.2.1.3.
9 tenderer may kindly go through with GCC for services 2018 No No Not Allowed
The contractor shall provide the minimum wage with EPF & ESI to the
10 appointee. The police verification of the staff employed will be got done by the No No Not Allowed
contractor.
This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued by
Department of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.
2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017.
Designation : DCM