Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

DPWH
OFFICE OF THE BUILDING OFFICIAL
MUNICIPALITY OF SAN FERNANDO

RECOMMENDING APPROVAL:

HEAD, STRUCTURAL SECTION DATE

APPROVED:

BUILDING OFFICIAL DATE

A B C

10.15 1.20

5.00 5.16

1.73 3.27 2.04 3.11

WF1 WF2 WF3 WF4


2
F1-C1 F2-C2 F3-C3
WF2
T&B 1 WF6
3.35

WF8 LIVING &


WF7 DINNING RM
WF5
5.00

5.00
OFFICE RM
WF11 WF9

WF10
1.65

WF12
WF13
1
F4-C4 WF14 F5-C5 WF15 WF16 F6-C6
5.00 5.15

FOUNDATION PLAN
SCALE 1:100 METERS

IT SHALL BE UNLAWFUL OF
UNDER THE DIRECT SUPERVISION OF: REG. NO. : SEAL: ANY PERSON, W/O WRITTEN PROJECT TITLE: APPROVED BY: SHEET CONTENT: REVISION : SHEET NO.:
CONSENT OF THE ARCHITECT
OR AUTHOR OF THE SAID
DATE : DOCUMENTS TO DUPLICATE
AS SHOWN DATE :
OR TO MAKE COPIES FOR USE
A PROPOSED TWO STOREY RESIDENCE GELLA, LANCE JED
LICENSED CIVIL ENGINEER
PTR NO. :
DATE :
IN THE REPETITION OF AND
OR OTHER PROJECT OR
BUILDING, WEATHER
EXECUTED PARTLY OR IN A
WHOLE.
OWNER
REF. DWG. :
CADD BY :
S1
ADDRESS: TIN : REPUBLIC ACT 545
LOCATION: POBLACION, ARGAO, CEBU ADDRESS: POBLACION, ARGAO, CEBU CHECKED BY:

You might also like