Professional Documents
Culture Documents
073 Endorsement Letter
073 Endorsement Letter
MSC-ITOWER3-LET-074
Good day,
In connection with above mentioned project, we would like to inform you that the attached plan
was revised proposal regarding to the first lift concreting of tank walls. The pouring of tank
walls and shear wall will be done separately due to difference in their required strength
(5000psi and 7000psi for tanks and shear, respectively). Approved waterproofing and
crystallization will be applied at the connection of tank wall and shear wall.
Thank you.