ABSTRACT OF COST

SECURITY WATCH TOWER

CIVIL WORKS
e Measurements (ft.)
m Description No. Quantities
N L B H
1.0 EXCAVATION
Excavation For Foundations in all 44.098668
kinds of soil,dry or wet, hard or
soft,including backfillingof ecavated
earth in plinth i/c breaking
clods,dressing watering
&consolidatingby ramming in layers
not exceeding150mmdepth to
obtain95% modified AASHTO
density including lifting,shifting or 1 4.26 4.26 2.4 2.439024
1 BACKFILLING
as per instruction&specification of 1 4.26 4.26 2.1 38.654388 M3
###the consultant
STONE SOLING&approval of
client(project engineer) . Contractor
providing
will carryout&laying
compaction300
testmm
as per
thick stone .soling of approved
specification
quality under
foundations,floor&plinth
including hand packing
vertically&filling voids with
spawels, consolidating&
compacting with mechanical
means as per
drawings,specification&instru
ction of consultant&approvel
client(project engineer) .

3.734756
2 Watch Tower area upto PCC 1 3.73 3.73 ### 1.829268
1 Watch Tower area upto Floor 1 1.83 1.83 ###
2 Stair case area 1 2.28 1.83 ###
3 PLAIN CEMENT CONCRETE (1:4:8)
1 Watch tower Base 1 ### ### ### 1.39 Cft
2 Watch Tower Floor 1 1.83 1.83 ### 0.52 3.31E+09
3 Stair case area 1 2.28 2.28 ### #REF! 3.5E+09
3.2 PLAIN CEMENT CONCRETE (1:3:6) 0.00 Cft
3.2.1SITU (1:3:6) 4 1.83 ### ### 0.19
3.3 RCC For Column(1:2:4)
3.3.1Upto Plinth 4
6 Situ (1:3:6) ### ### ### 48.06 Cft
4
7 RCC For Plinth Beam ### ### ### 28.13 Cft
2 ### ### ### 22.50 Cft
2
8 Bitumin Coats ### ### 36.00 Sft
Inside Bed 1 ### ### 120.00 Sft
Inside Wall 4 ### ### 150.00 Sft
Outside Wall 4 ### ### 199.75 Sft
Outside Bed 4 ### ### ### 980.00 Cft
Back Filling 1 ### ### 70.50
Bed Side 4
8 Stone Soling On compacted Soil ### ### ### 18.00 Cft
Watch Tower Area 1 ### ### ### 18.00 Cft
Stair Case Area 1 0.00
9 PCC (1:4: 8 ) ### ### ### 11.88 Cft
Watch Tower Area 1 ### ### ### 11.88 Cft
STAir Case Area 1
10 Floor Finshing ### ### ### 11.88
Watch Tower Area 1 ### ### ### 11.88 Cft
Stair Case Area 1
11 RCC For Column ### ### ### 18.00 Cft
4
Bracing Beam ### ### ### 8.44 Cft
2 ### ### ### 6.75
2
12 RCC For Column ### ### ### 5.06 Cft
4 0.00
13 Drop Bam ### ### ### 17.78
2 ### ### ### 14.22 Cft
2
14 RCC Slab ### ### ### 28.13 Cft
1
15 First Floor Columns ### ### ### 16.88 Cft
4
16 RCC Lintel ### ### ### 18.00
4

17 First Floor Drop Beam ### ### ### 17.78 Cft


2 ### ### ### 14.22 Cft
2 Cft
18 First Floor RCC Slab ### ### ### 57.78 Cft
1
19 Roof Screeding ### ### ### 18.49 Cft
1 0.00
20 PCC Around Stair Case ### ### ### 6.68 Cft
4 0.00
Plaster Around Stair Case B/W ### ### 13.50 Sq.Ft
3
20 Block Masonary
First Floor ### ### ### 117.00 Cft
4
Around Stair Case ### ### ### 31.46 Cft
Front Step 3 ### ### ### 5.63 Cft
1 `
Deduction For Door ### ### ### -12.19 Cft
21 Deduction For Opning (w) 1 ### ### ### -27.00 Cft
Total Deduction 3 -39.19

22 Plaster Work Ground Floor Ceiling ### ### 36.00 Sq. Ft


1
23 Drop Beam insideGF ### ### 37.92 Sq. Ft
4
24 First Floor Ceiling Plaster ### ### 36.00 Sq. Ft
1
First Floor Inside Plaster ### ### 216.00 Sq. Ft
26 4 ### ### 270.00 Sq. Ft
First Floor Outside Plaster 4 0.00
27 Deduction ### ### -36.00 Sq. Ft
window 3 ### ### -16.25 Sq. Ft
Door 1 -52.25
Total Deduction 0.00
28 Bitumin 3 Coats On Roof ### ### 115.56 Sq.Ft
1
2 Layers Roofing Felt Sheet ### ### 231.13 Sq.Ft
2 0.00
2 Layer Pea Gravelling On Bitumin ### ### 231.13 Sq.Ft
2 0.00
0.00
0.00
0.00

Total 0.00 Cft


25.32148

2.134146
3.734756
0.304878 1.829268
0.152439

2.286585
3.734756
2.1 Watch Tower area upto PCC 1 3.73 3.73 0.30 4.2295216
2.2 Watch Tower area upto Floor 1 0.83 0.83 0.15 0.104460632
2.3 Stair case area 1 2.28 0.83 0.15 0.28729824
4.621280472
3 PLAIN CEMENT CONCRETE (1:4:8) 0
3.1 Watch tower Base 1 3.73 3.73 0.10 1.39129
3.2 Watch Tower Floor 1 0.83 0.83 0.10 0.0687241
3.3 Stair case area 1 2.28 2.28 0.10 0.51984
1.9798541