Cleveland Controls AFS-262

Division of UniControl Inc.


Installation
Air Pressure Sensing Switch with Auxiliary Blower
Figure 1: Typical Application Set Up.

This bulletin is intended to be used only as a guide to installation. If you require in-depth
assistance, please consult an electrician or installation contractor.
Are you

Cleveland Controls reading a FAX or a


COPY of this bulletin?
Tel: 216-398-0330 DOWNLOAD the full-
DIVISION OF UNICONTROL INC. color PDF version of
1111 Brookpark Rd Fax: 216-398-8558 this and other
Cleveland OH 44109 literature at our
website!
Email:saleshvac@unicontrolinc.com
Bulletin AFS262-AXB.03 Web page: http://www.clevelandcontrols.com
Figure 2: Approved Mounting
Figure 3: Inlet Positions
Positions.

Instructions
1. Make a small hole in the vent pipe to installing Model #9460, proceed to Step 6. open” terminals of the air switch. Be sure
allow the insertion of the probe for the air If installing model #9450, complete steps to follow all applicable codes when wiring
flow switch. This hole should be located in 3, 4, and 5. or consult your local electrician.
a straight run of the vent pipe. Do not make
the hole close to any sharp bends or elbows 3. Mount the air flow switch in a conve- 6. Locate the set point adjusting screw
where the air flow is turbulent. nient location, free from vibration. The (marked "INC") on the air switch. Turn the
switch must be mounted vertically, with the screw in the direction of the arrow (clock-
2. Insert the tip of the probe so that it is sample line connections facing either to the wise) approximately 10 turns. Turn on the
perpendicular to the air flow within the vent side or down. See Figure 2. dryer, making sure the lint vent is clean.
pipe, as close to the center of the airstream Slowly turn the adjusting screw counter-
as possible. Three feet of tubing is provided: 4. Use tubing to connect the probe to the clockwise until the auxiliary blower motor
trim excess length to prevent kinking or “H” side of the air flow switch. Refer to comes on. Next, shut the dryer off and see
crimping of the tubing. Use a six-foot length Figure 3 to identify the “H” side of the if the auxiliary blower motor shuts off as
of ¼" OD hardwall tubing if dryer jet is switch. Refer to Bulletin AFS262.05 for well. If it does not shut off after a moment,
located 10 feet or more from the dryer. If additional information on tubing. turn the adjusting screw clockwise until the
5. Remove the cover from the air switch auxiliary blower motor shuts off after the
and connect the wiring as shown in Figure dryer shuts off. Be sure to check the opera-
1. Locate the “common” and “normally tion of the entire system.
7. Replace the cover of the air flow switch
and tighten the screws. The air flow switch
is now ready to control the dryer jet.

Bulletin AFS262-AXB.02