Professional Documents
Culture Documents
Post Exam IATF Awareness
Post Exam IATF Awareness
Please Write Your Full Name: ___________________________________________ Venue: Basement Auditorium Date of Training / Exam: ______________________
3. Goal of IATF 16949:2016 is 4. You can only have customer defined special characteristics to monitor for SPC
a) Defect prevention
b) Reduction in variation & elimination of waste a. Yes that is what IATF indicates
c) Continual improvement
b. Additional characteristics may come from PFMEA exercise
d) All of the above
c. a. only
d. a. and b. both
5. IATF talks of monitoring of 6. The organization need not conform to customer defined special characteristics.
a. number of occurrences of premium freight. a. True
b. Premium freight incurred b. False
7. The organization shall ensure that the planned arrangements to verify that 8. Review regarding engineering should be completed within _____________of receipt of
the product and service requirements have been met encompass the notification of engineering standards/specifications changes.
control plan and are documented. The organization shall ensure that the a. Two working weeks
planned arrangements for initial release of products and service b. 10 working days
encompass product & service approval: c. As much time as needed
a. True d. None of the above
b. False
9. According to IATF 16949, external/commercial/independent laboratory 10. Additional core tools like APQP, PFMEA, SPC, MSA, PPAP must be implemented for
facilities used for inspection, test or calibration services by the automotive specific customer product related manufacturing processes.
organization shall have a defined a laboratory scope that includes the a. True
capability to perform the required inspection, test or calibration b. False
a. True b. False