OUTSTANDING MATERIAL PT LAUTAN ORGANO WATER

Project Name WTP Expantion (BWRO Project) Starting Date


No. Job 1903-MPR01 Finish Date
Leader Delivery Schedule
Team Delivery Date

No Unit Description Description of Material Size Qty Req't Date Remark/Status

1 LOW-1903-MPR04-RO-002 Skid #1, BWRO "G" B/V ss (fitting lengkap) 401 1/2" 1 HP Pump
B/V ss (fitting lengkap) 402 1/2" 1 Interstage
B/V ss (fitting lengkap) 403 1/2" 1 Concentrate
B/V ss (fitting lengkap) 1/2" 2 Drain Filter CTR
Filter Cartridge Tank 1
HP Pump 1
Actuator AV-403, 402 3" 2
B/V ss Header Udara 1/2" 1
PI 2 1/2" x 1/4" 6