This inspection test record documents the inspection of a transmission line project. Key points include:
1) Documents such as layout drawings and pole installation details were reviewed to ensure construction was completed as specified.
2) Grounding, lightning protection, and pole installations were confirmed to meet specifications and drawings.
3) Checklists for poles and line sags were completed, and line joints were tested for integrity. Electrical equipment was verified to be clean internally and externally.
This inspection test record documents the inspection of a transmission line project. Key points include:
1) Documents such as layout drawings and pole installation details were reviewed to ensure construction was completed as specified.
2) Grounding, lightning protection, and pole installations were confirmed to meet specifications and drawings.
3) Checklists for poles and line sags were completed, and line joints were tested for integrity. Electrical equipment was verified to be clean internally and externally.
This inspection test record documents the inspection of a transmission line project. Key points include:
1) Documents such as layout drawings and pole installation details were reviewed to ensure construction was completed as specified.
2) Grounding, lightning protection, and pole installations were confirmed to meet specifications and drawings.
3) Checklists for poles and line sags were completed, and line joints were tested for integrity. Electrical equipment was verified to be clean internally and externally.
Project No. Project Title Facilities INFORMATION Conductor size System / Sub System no. From To Location Operating Voltage Ref. Drawing nos. INSPECTION / TEST OK N/A P/L No. Documents required: 1 a) Layout drawings b) Pole installation details Verify to ensure that all construction / installation activities have been 2 completed. Confirm the grounding and lightning protection are completed as per 3 specifications and drawings. 4 Pole Check list completed 5 Line sag check list completed 6 Line Joints integrity tested. 7 Verify space heaters, instruments, indication lamps, control switches, Verify no dust inside Enclosure /Cabinet / Panel and insulation surfaces 8 are clean. Verify Instruments & its Accessories /Electrical equipment/Panel 9 externally clean. COMMENT(S) AND ADDITIONAL INFORMATION