Item Original Cost of work as per Amt. of work executed till Estimated Cost of
Sr.No. Section Remarks
No. BOQ date (IPC-19) Balance Work
1.02 (d) Kilometre/5th km. Stones including foundation Concrete . Nr. 0 250 0
Page 2 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
Total 50000
2 Earthwork
Page 3 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
Total 14084560
Page 4 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
Total 12240000
4 Bituminous Works
4.02(a) On granular surface treated with primer @2.75Kg/10 sqm Sq.m 25100 4 100400
Page 5 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
Total 11314240
Back filling behind abutments, wing walls and reurn walls with
selected granular material of approved quality including all
5.02 Cum. 325 0
material, labour, equipment carriage etc. all complete as per
drawing and Technical Specification Clause 505.
Back filling with filter media behind abutments, wing walls &
return walls, including all material, labour, equipment carriage
5.03 Cum. 5800.0 500 2900000
etc. all complete as per drawing and Technical Specification
Clause 305 & 309.
Page 6 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
(a) Bridges 0
(a) I M-25 grade in base slab for open foundation Cum. 2400 0
(a) (III) M-35 grade in substructure for ROB Cum. 770 3000 2310000
(a) (IV) M-40 grade in superstructure for ROB Cum. 665 5000 3325000
Page 7 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
5.07(b)
M20- grade concrte in sub-structure Cum. 2500 0
(I)
5.07 (b)
RCC M-25 in bed block Cum. 3000 0
(IV)
Page 8 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
Page 9 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
1200 mm RM 4000 0
1000 mm RM 3200 0
Page 10 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
Page 11 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
Page 12 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
Page 13 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
6 Drainage
Page 14 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
Page 15 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
Brick on edge paving with first class bricks laid dry including
excavation, refilling, consolidating, hand packing and sand
6.11 Sqm. 2816 130 366080
filling in joints with all leads and lifts as per Technical
Specifications Clause 1300.
Total 366080
7 Junctions/Footpath
Total 896750
Page 16 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
(I) Boundary stones as per Technical Specifications Clause 806. Nr. 20 300 6000
Page 17 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
(c) Mandatory signs,size octagonal 900 mm height (for "STOP") Nr. 8 5000 40000
Fixing 200 dia H.P NP2 type guard post @ every 50m on
either side, 70 cm above ground and 80 cm below ground
8.07 Nr. 300 0
filled with sand and capping with cement concrete M-10 on top
20cm depth.
8.08 Painting 2 coats over one coat of primer with synthetic enamel Sqm. 2000 35 70000
paint on new cement concrete surface, on road side kerbs as
per drawing and Technical Specifications Clause 803.
Page 18 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
Total 3322350
9 Miscellaneous Item
Page 19 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
Total 0
10 Maintenance Work
Page 20 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED EXCEPT ROB
Estimated
Item Cost of
Description Unit BOQ Qty. BOQ Rate Remarks
No. balance
works
Page 21 of 35
CONTRACT COMPARISON
1.01 Clearing & Grubbing HCT 18 10000 3.9 0.0 1 4.9 -13.1 -131080 38920.0 0 10000
Dismantling works-Birck/Stone
1.02 (a) Cum 120 200 0.00 0.0 0 0 -120 -24000 0.0 0 0
structures
Plain Concrete/Reinforced
1.02 (b) concrete/prestressed concrete Cum 137 200 0.0 0.0 0 0 -137 -27400 0.0 0 0
structures
1.02 (c) Stone/Brick pitching Cum 1167 50 0.0 0.0 0 0 -1167 -58350 0.0 0 0
1.03 (a) Tree cutting 300 mm to 600 mm girth Nr. 13 500 0.0 0.0 0 0 -13 -6500 0.0 0 0
1.03 (b) 600 mm to 900 mm Nr. 44 1000 0.0 0.0 0 0 -44 -44000 0.0 0 0
2 Earthwork 0 0 0
Page 22 of 35
CONTRACT COMPARISON
2.08 Loosening & Recompacting Subgrade Cum. 15000 20 1432 3550 0 4982 -10018 -200360 28640.0 71000 0
3.01 Constructing Granular sub-base Cum 34017 775 19151.1 3966.0 6000 29117 -4900 -3797399 14842126 3073650 4650000
3.02 Constructing wet mix macaam base Cum 41251 925 32295.5 5800.0 6000 44095 2844 2631153 29873328 5365000 5550000
Page 23 of 35
CONTRACT COMPARISON
4 Bituminous Works 0 0
4.04 P&L Dense Bituminous Macadam(DBM) Cum 49555 2700 33985 11353.0 1670 47008 -2547 -6877413 91758987 30653100 4509000
4.07 P & L of Bituminous macadam Cum 1771 2500 768 0.0 1900 2668 897 2242250 1919750 0 4750000
Page 24 of 35
CONTRACT COMPARISON
5.03 Back filling with filter media Cum. 639.0 500 264 0 5600 5864 5225 2612636 132136 0 2800000
(a) Bridges 0 0
(a) (III) M-35 grade in substructure for ROB Cum. 752 3000 0 0 829 829 77 231000 0 0 2487000
(a) (IV) M-40 grade in superstructure for ROB Cum. 234 5000 0 0 660 660 426 2130000 0 0 3300000
5.07(b)
M20- grade concrte in sub-structure Cum. 240 2500 325 0 0 325 85 211270 811270 0 0
(I)
(b) (II) M-25 in super sturcture Cum. 29 3500 18 0 0 18 -11 -37975 63525 0 0
5.07 (b)
RCC M-25 in bed block Cum. 8 3000 8 0 0 8 0 -609 23391 0 0
(IV)
Page 25 of 35
CONTRACT COMPARISON
5.09 RCC M-30 grade in approach slab Cum. 192 5000 74 91 43.05 208 16 82430 372180 455000 215250
5.11 HYSD / TMT Bar Reinforcement M.T. 81 24000 2 5 0 7 -74 -1769448 54552 120000 0
5.12 HYSD Bar Reinforcement for Bridge M.T. 670 23500 102 10 541.33 654 -16 -384014 2404732 235000 12721255
5.21 a Stone boulder apron 300mm thick cum 618 750 0 0 0 0 -618 -463500 0 0 0
Page 26 of 35
CONTRACT COMPARISON
(I) CC Flooring M10 Cum. 194 1900 127 173 0 300 106 202094 241994 328700 0
(II) CC Flooring M15 Cum. 577 1980 239 341 0 580 3 6354 473634 675180 0
5.23 Stone pitching 300mm thick on slopes cum 1583 750 0 361 0 361 -1222 -916500 0 270750 0
5.25 P/L filling of Granular Material cum 252 600 30 0 0 30 -222 -133184 18016 0 0
5.27 Cutoff Wall M15 cum 200 2300 70 113 0 183 -17 -38808 161292 259900 0
5.30 pile concrete at ROB RM 1380 4500 812 0 1000 1812 432 1944000 3654000 0 4500000
5.32 Sand fiiling in well /under box etc. cum 128 400 1207 40 0 1247 1119 447534 482734 16000 0
Page 27 of 35
CONTRACT COMPARISON
5.35 Well cap M-30 grade cum 140 2800 163 0 0 163 23 64735 456735 0 0
Payments held=3309636
Total 0 -4398742 20475191 4969446 69898668 Net Paid=17165556
Page 28 of 35
CONTRACT COMPARISON
6 Drainage 0 0 0
Page 29 of 35
CONTRACT COMPARISON
7 Junctions/Footpath 0 0 0
Total 0 0 0 0 896750
Payments of some of
29695 150 12363 6135 0 18498 -11198 -1679625 1854375 920250 0 the executed kerbs
8.01(a) PCC Kerb M20 m were held up due to
pending repairs to the
damaged/broken kerb
17047 305 1255 2865 3812 7932 -9115 -2780075 382775 873825 1162660 portions.
8.01 (b) Channel Kerb m
Providing & laying cement concrete M-
8.02 (a) 10 for foundations of Kerbs m 16834 140 1060 230 0 1290 -15544 -2176151 148400 32209 0
8.02 (b) m 16360 200 210 215 3812 4237 -12123 -2424625 42000 42975 762400
Channel Kerb
Page 30 of 35
CONTRACT COMPARISON
8.10 Providing and fixing metal road Nr. 3200 350 0 0 200 200 -3000 -1050000 0 0 70000
studs/cats
8.11 Providing and fixing M.S railing for L.m 400 1000 0 0 0 0 -400 -400000 0 0 0
traffic islands/median
Page 31 of 35
CONTRACT COMPARISON
9 Miscellaneous Item 0 0 0
Total 0 0 0 0 0
10 Maintenance Work 0 0 0
10.02 Providing renewal coat with SDBC 25 cum 385 3300 1360 0 0 1360 975 3217335 4487835 0 0
mm thick @4.75% bitumen on existing
carriageway as per Clause 508.
Page 32 of 35
ESTIMATED BALANCE WORK TO BE EXECUTED FOR BRIDGES EXCLUDING ROB
Qty. Estimated
Item BOQ Balance
Description Unit executed as Balance Rate
No. Qty. Amount
on date Qty.
Earth Work in excavation of
5.01 (a) Cum. 8511 1314.27 600 50 30000
foundation of Structure
Back filling behind abutments,
5.02 Cum. 749 893.78 0 325 0
wing wall and reurn wall
5.03 Back filling with filter media Cum. 639.0 264.272 0 500 0
5.04 Cement Concrete M-10 Grade Cum. 213.0 53.021 28 1900 53200
Cement concrete M-20 grade in
5.05 Cum. 394 71.167 0 2350 0
curtain wall
Cement concrete M-15 grade in
5.06 bedding of subsurface drain Cum. 354 0.00 45 2000 90000
pipes
RCC including shuttering but
5.07
excluding reinforcement: -
(a) Bridges
M-25 grade in base slab for open
(a) I Cum. 230 0 165 2400 396000
foundation
M-30 grade in piers, abutment ,
(a) (II) Cum. 552 240.544 255 3000 765000
pier cap & abutment caps
M-35 grade in substructure for
(a) (III) Cum. 752 0 0 3000 0
ROB
M-35 grade in superstructure for
(a) (IV) Cum. 234 0 0 5000 0
ROB
5.07(b) M20- grade concrte in sub-
Cum. 240 324.508 0 2500 0
(I) structure
(b) (II) M-25 in super sturcture Cum. 29 18.150 0 3500 0
(b) (III) M-25 in parapets Cum. 10 4.388 0 3000 0
5.07 (b)
RCC M-25 in bed block Cum. 8 7.797 0 3000 0
(IV)
Pre-stressed cement concrte T-
5.08 Cum. 2623 240.185 0 5200 0
Girder/Box girder in M-40
RCC M-30 grade in approach
5.09 Cum. 192 74.436 91 5000 455000
slab
RCC M-30 grade for railing in
5.10 m 633 157.3 192 1000 192000
bridge & ROB
5.11 HYSD / TMT Bar Reinforcement M.T. 81 2.273 5 24000 120000
HYSD Bar Reinforcement for
5.12 M.T. 670 102.329 10 23500 235000
Bridge
High Tensile Steel stands
5.13 M.T. 93 0 0 80000 0
including stressing of strands
Supplying,fitting and fixing in
5.14 Cu.cm. 69182 124354 0 0.75 0
position ,Elastomemetric bearing
5.15 Supplying and fixing POT- PITE 0 0
capacity 200mt Nr. 48 0 0 8500 0
capacity 170mt Nr. 16 0 0 7500 0
P/L PVC seal in the longitudinal
5.16 m 51 0 51 500 25500
joint
P/L strip seal type expansion joint
5.17 M.T. 238 0 36 6000 216000
complete
ESTIMATED BALANCE WORK TO BE EXECUTED FOR BRIDGES EXCLUDING ROB
Qty. Estimated
Item BOQ Balance
Description Unit executed as Balance Rate
No. Qty. Amount
on date Qty.
Providing & Laying Tar paper on
5.18 Sqm. 44.00 27.66 7.08 200 1416
Abutments / Piers.
65 mm thick Butuminous wearing
5.19 Sqm. 4295 0 1540 375 577500
course
Providing & fixing drainage
5.20 Nr. 91 5 14 1000 14000
spouts for bridge
5.21 a stone boulder apron 300mm thick cum 618 0 723 750 542250
Cement Concrete Flooring with
5.21(b)
M15
(I) CC Flooring M10 Cum. 194 127.365 173 1900 328700
(II) CC Flooring M15 Cum. 577 239.209 341 1950 664950
5.22 P/L & Jointing of NP-4 pipe
1200 mm RM 60 0 0 4000 0
1000 mm RM 740 59 0 3200 0
Stone pitching 300mm thick on
5.23 cum 1583 0 361 750 270750
slopes
Fitler media underneath stone
5.24 cum 812 0 146 500 73000
pitching on slope
5.25 P/L filling of Grangular Material cum 252 30.026 0 600 0
5.26 Weep Holes RM 754 52 80 75 6000
5.27 Cutoff Wall M15 cum 200 70.127 113 2300 259900
Construction of footpaths along
5.28 Sqm. 3920 0 0 350 0
service roads
Provoiding buried type
5.29(a) expansion joints in new & m 190 0 19 2500 47500
existing bridges
Provoiding 20 mm thick
5.29(B) m 85 0 67 400 26800
copressible fiber board type
5.30 pile concrete at ROB RM 1380 0 0 4500 0
RCC M-35 grade in pile capa
5.31 cum 666 0 0 2900 0
ecluding reinfircement
5.32 Sand fiiling in well /under box etc. cum 128 1206.84 40 400 16000
Qty. Estimated
Item BOQ Balance
Description Unit executed as Balance Rate
No. Qty. Amount
on date Qty.
Providing reinforced earth
5.40
retaining walls
Precast facia panels of reinforced
(I) Sqm. 3950 0.00 0 2800 0
concrete grade M-35
Foundations/levelling pad in M-
(ii) cum 40 0 0 2500 0
20 grade
RCC crash barries M-35 grade
(iii) Lm. 740 0 0 2300 0
monolithic with friction slab
Providing and fixing metallic
5.41 crash barrier for traffic is Lm. 14000 0 0 1025 0
lands/high embankment