CONTACT PERSON/

COMPANY ADDRESS POSITION

JUNE 24, SIGMATECH


MONDAY

JUNE 25, SIGMATECH


TUESDAY

Minebea Mitsumi Phils.


Inc Sir Saychin Lait-PQA/QC Team Leader
(stepping motors)

JUNE 26, FPIP


WEDNESDAY

iSteel INC.
(insulated steel roofing, Sir Garry Gonzales/QA/QC Supervisor
galvanized iron, walling
& cladding)

EHS Lens
Enomoto Gen. Trias, Cavite

JUNE 27, SIGMATECH


THURSDAY

JUNE 28, SIGMATECH


FRIDAY
ACTIVITY REQUIREMENTS

MATECH

MATECH

*service repair for VMM


Sprint 200
ychin Lait-PQA/QC Team Leader
*XRF with RoHS 2
(Phtalates)

*pH meter
arry Gonzales/QA/QC Supervisor *Viscometer

c/o Sir Kayvee


c/o Sir Kayvee and Sakai San

MATECH

MATECH
REMARKS

*made report for sales meeting


*update data base
*Sales Meeting

* Training with Sir Kayvee on how to interact properly when


meeting a client
*confirm appointment for Minebea and isteel visit
*Training with Sir Marlon (product specification: CSAM & XRAY)

* Inquiry of XRF Machine with regards to RoHS 2 (phthalates)


Current XRF machine is limited by getting the RoHS alone, so
they’re looking for an XRF that can analyze RoHS 2.
*Also asked for service repair to their current QVI Sprint RAM
Optical 200 as they encountered some problems causing
limitation to its utilization.
* Introduce other equipment that might help them and need in
the future for Minebea Mitsumi QA/QC dept. Possibly XRAY or
CSAM or SEM

*Conduct Sigmatech Product's Introduction


* Discussed about Sir Garry's future plan for isteel QA/QC
Dept.
*In need of pH meter and viscometer. However, brookfield
viscometer is the one needed.
*Introduce other equipment that might need in the future.
ir Kayvee
ee and Sakai San

* Called some companies in FPIP


(apppointment setting for next week's itinerary)
- Arktech Phils/ Sir Mario Alvarez of Eng'g Dept
- Yamaichi Seiko Phils. Inc/ Sir Arjay of QA/QC Dept
- Shimano Phils. Inc/ Ms. Christine Lab Analyst
*emailed Sir Saychin and team (minutes of meeting last
Wednesday)
*update database
- LIMA Industrial Park in Malvar Batangas

* Sent quotation for pH meter to Sir Garry of isteel


* Forward Minebea's email to Dhonna regarding on service
repair for VMM Sprint 200
DATE COMPANY ADDRESS

JULY 1,
MONDAY SIGMATECH

JULY 2, SIGMATECH
TUESDAY

JULY 3, FPIP
WEDNESDAY

JULY 4, SIGMATECH
THURSDAY

SIGMATECH
JULY 5,
FRIDAY
ROHM Carmona
CONTACT PERSON/ POSITION

SIGMATECH

SIGMATECH

SIGMATECH

SIGMATECH

Rudy Negrite Jr.


Ma'am Marchie
PURPOSE

*Echo Training with Service Team


*Sales Meeting

*Finalize client visit on Wednesday in FPIP


*Follow up to Sir Garry regarding to the quotation I sent him of pH
meter
*Follow up also in Minebea Mitsumi regarding to the service repair
of VMM Sprint 200
*possible visit: Shimano Phils Inc, Arktech Phils. Inc, Yamaichi Seiko
Phils. Inc, Taiwan Fructose,

*Call companies in Lima


- Philinak Industries Inc (manufacturing of Industrial Rubber &
medical parts)
- Daiho Phils. Inc (engaged in plastic injection molding process)
- Mectron Phils Inc. (operates in the transportation equipment
manufacturing industry)
- YTP Lima Manufacturing Inc. (automotives)
- Koyo Manufacturing Phils Corp (bearing manufacturing for cars)
- Taisei Electronics Phils Inc (metal treatment cables & wireless
steel)
- Dynapac & Malinta Phils Inc (manufacture, process, assemble,
fabricate & develop offset printed laminated cartons)
- Mitsuba Phils. Corp (major products are window motor,
automotives sensor)
*Continue calls in Lima and FPIP

Meeting regarding CSAM need and PONY service