Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

NO POWERPLANT OWNER NO.

OF UNITS
1 Bad Creek Duke Power Co 4
2 Balgam Headow Sisuthern Cal Ed 1
3 Bath Country Virginia Elac Power Co 6
4 Bear Swamp How England Power Co 2
5 Blenhelm Gilboa Far Auth of Senta of NY 1
6 Cabin Creek Public Service of ID 2
7 Carterg Dam Project U.S Corps of Engineers 2
8 Castale City of Los Angeles 6
9 Clearance Cannon U.S Corps of Engineers 1
10 De Gray U.S Corps of Engineers 1
11 Edward Hyat State of Calif 3
12 Fairfield South Carolina Elac & Gas Co 8
13 Flatron USBR 1
14 Grand Coulpe USBR 1
4
15 Helay Pacific Gas & Elec 3

16 Hlwasee TVA 1
17 Horsa Mesa Salt River Project 1
18 Jocaasee Duke Power Co 4
19 Lewiston Pwr Auth of State NY 12
20 Ludington Consumer Power/Detroit Edison 6
21 Mormon Flat Salt River Project 1
22 Mount Cibert USBR 2
23 Huddy Run Phila Electric 8
24 Northfield Mountain Northeast Utilities 4
25 Racoon Mtn TVA 4
26 Rocky Mountain Georgia Power Co 3
27 Rocky River Conn Light & Power 2
28 Russel Dam U.S Corps of Engineers 4
29 Salina Grand River Dam Auth 3
30 San Luis USBR 8

31 Seneca Clev Elec/Penn Elec 2


32 Smith Mountain Appalachian Power Co.
Unit 1 & 2 2
Unit 3 1
33 Taum Sauk Union Electric 2
34 Thenmelllto State of Cal 3
35 Wallace Dam Georgia Power Co 4
36 Yards Creek J.C Power & Light and P.S Electric and Gas 3
TURBINE OPERATION
SPEED RPM INSTALLED CAPACITY HEAD DISCHARGE OUTPUT HEAD
300 1028 108.8 257 127
400 215 402 235 416.1
257.1 2280 129 300 358
225 600 220.3 298 225
257 1000 306 290 308
160 300 363 143 375
150 260 105 179 106
257 1275 274 205 324
75 11 22.9 32 18.3
128.5 12.2 52.1 33.2 45.8
189.5 268 152 89.7 181
150 495 45.7 61.9 52.7
257/300 9 88.4 9 73.2
200 100 81 47.4 89
200 190 110.3 47.2 103.6
360 1053 495 358 457
531.6 max 541 max
105.9 59.5 58 62 62.5
160 86.8 79 86.8 79
120 680 89.6 174 89.6
112.5 251 22.9 20.9 25.9
112.5 1657.8 97.5 308 98
138.5 42.3 39.3 41.8 44
180 200 145/119 103 140/120
180 800 108 103 130
257 1028 227 257 226
300 1390 287 147 287
225 846 210.3 282 210.5
164 60 70 30 70
120 371 47.9 92.76 49
171.4 100 68.5 44.7 74.7
120 272 67 29.8 80.1
150 424 95.4 51 100.3
225 396 250 198 250

105.9 130 55 65 62.5


90 182 51.8 102.5 57.5
200 440 241 220 233
112.5 82.5 25.9 25.7 30.2
85.8 216 27.2 54 29.9
240 337.5 200 113 223
DISCHARGE INPUT POWER TURBIN MANUF YEAR IN OPERATION
122 330 A-C U.C.
208.2 Mitsubishi 1987
116 380 A-C 1986
125.7 293.5 Hitachi 1974
80.6 272 Hitachi 1973
21.8 122.4 A-C 1967
125.5 138 A-C 1975
90.8 217.1 Hitachi 1975
156 28.7 A-C 1974
63 32.6 NN 1969
53 129 A-C 1968
135.6 67.2 A-C 1976
10.2 9.7 A-C 1954
48.1 50 Nohab 1974
57.6 Toshiba 1988
68 308.7 Hitachi 1984

111 72.7 A-C 1986


117 75.9 BLH 1972
175.5 173 A-C
96.4 28 A-C
114.3 234.6 Hitachi
102 43.2 A-C
73.6 110 Fuji Toshiba
74 90 BLH
93 206 BLH
121 402 A-C
146.4 Hitachi

88.3 Vevey Dominion


65.7 52.6 A-C
38.9 25 Hitachi
66 44.65
77.5 175.7 N-N

111.4 75.7 A-C


200
75 201 A-C
85 32.8 A-C
184 61.9 A-C
41 101.7 BLH
Country Station Name Commisioning Date Total Turbine Rating
Argentina Los Reyunos
Australia Shoalhaven
Wivenhoe
Tumut 3
Austria Rodund II
Kuhtai
Lunersee
Wielinger
Kels/Metrei
Belgium Coo-Trois Ponts 1
Coo-Trois Ponts 2
Brazil Pedreira
Edgar Souza
Trai
Total Pump Rating Gross Head No. of units Type of units Storage Cycle
Mas Ucup 20000
Kang endin 50000
Mas Mukhl 100000
Mas Abi 50000
Afif 50000

1h 2h 3h 4h 5h 6h 7h
0,78 0,78 0,77 0,78 0,80 0,78 0,78
13h 14h 15h 16h 17h 18h 19h
0,90 0,93 0,92 0,91 0,93 1,00 0,99

1
2
3
4
5
35000 6
Daya (MW)

7
33000 8
9
31000 10
11
12
29000
7666 MW 13
14
27000 15
16
25000 17
18
19
23000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 20
21
Jam (Hour) 22
23
24
8h 9h 10h 11h 12h
0,83 0,88 0,90 0,92 0,87
20h 21h 22h 23h 24h
0,98 0,94 0,87 0,83 0,79
33330 46755
0.78 25997.4 1 0.78 36468.9
0.78 25997.4 2 0.78 36468.9
0.77 25664.1 3 0.77 36001.35
0.78 25997.4 4 0.78 36468.9 49000
0.8 26664 5 0.8 37404

Daya (MW)
47000
0.78 25997.4 6 0.78 36468.9
0.78 25997.4 7 0.78 36468.9 45000
0.83 27663.9 8 0.83 38806.65
0.88 29330.4 9 0.88 41144.4 43000
0.9 29997 10 0.9 42079.5
0.92 30663.6 11 0.92 43014.6 41000
0.87 28997.1 12 0.87 40676.85
39000
0.9 29997 13 0.9 42079.5
0.93 30996.9 14 0.93 43482.15 37000
0.92 30663.6 15 0.92 43014.6
0.91 30330.3 16 0.91 42547.05 35000
0.93 30996.9 17 0.93 43482.15
33000
1 33330 7665.9 18 1 46755 1 2 3 4 5 6 7 8 9 10 11 12 1
0.99 32996.7 19 0.99 46287.45
0.98 32663.4 20 0.98 45819.9 Jam (H
0.94 31330.2 21 0.94 43949.7
0.87 28997.1 22 0.87 40676.85
0.83 27663.9 23 0.83 38806.65
0.79 26330.7 24 0.79 36936.45

10753.65
10754 MW

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Jam (Hour)

You might also like