NATIONAL HIGH WAY AUTHORITY OF INDIA

WESTERN TRSNSPORT CORRIDOR- TUMKUR- HAVERI NH-4 PROJECT


Rehabilitation and Upgrading of Chitradurga Section (Km 189 to Km 207)
Consultants: M/s Louis Berger Group INC. Contractor: Supreme-MBL (J/V)

GRADATION FOR SDBC Gr- II

Sample :Filler Date Of Sampling : 16/4/2008


Location : 205+500 RHS Date Of Testing : 16/4/2008
Sample No : SDBC Flr/Apr08/3/236 Sampled by : FIROZ ALAM
Wt. Of Sample : 398 Gms

Seive Size Cumulative % Cumulative


Mass Retained % Passing Remarks
(mm) Mass Retained Retatined

13.2 0 0 100.00 100

9.5 0 0 0.00 100

4.75 0 0 0.00 100

2.36 0 0 0.00 100

1.18 0 0 0.00 100

0.3 0 0 0.00 100

0.075 50 50 12.56 87.44

Remarks:

Contrator's Representative Consultant's Representative


NATIONAL HIGH WAY AUTHORITY OF INDIA
WESTERN TRSNSPORT CORRIDOR- TUMKUR- HAVERI NH-4 PROJECT
Rehabilitation and Upgrading of Chitradurga Section (Km 189 to Km 207)
Consultants: M/s Louis Berger Group INC. Contractor: Supreme-MBL (J/V)

GRADATION FOR SDBC Gr- II

Sample :Filler Date Of Sampling : 16/4/2008


Location : 205+500 RHS Date Of Testing : 16/4/2008
Sample No : SDBC Flr/Apr08/3/236 Sampled by : FIROZ ALAM
Wt. Of Sample : 335 Gms

Seive Size Cumulative % Cumulative


Mass Retained % Passing Remarks
(mm) Mass Retained Retatined

13.2 0 0 100.00 100

9.5 0 0 0.00 100

4.75 0 0 0.00 100

2.36 0 0 0.00 100

1.18 0 0 0.00 100

0.3 0 0 0.00 100

0.075 41 41 12.24 87.76

Remarks:

Contrator's Representative Consultant's Representative


NATIONAL HIGH WAY AUTHORITY OF INDIA
WESTERN TRSNSPORT CORRIDOR- TUMKUR- HAVERI NH-4 PROJECT
Rehabilitation and Upgrading of Chitradurga Section (Km 189 to Km 207)
Consultants: M/s Louis Berger Group INC. Contractor: Supreme-MBL (J/V)

GRADATION FOR SDBC Gr- II

Sample :Filler Date Of Sampling : 16/4/2008


Location : 205+500 RHS Date Of Testing : 16/4/2008
Sample No : SDBC Flr/Apr08/3/236 Sampled by : FIROZ ALAM
Wt. Of Sample : 405 Gms

Seive Size Cumulative % Cumulative


Mass Retained % Passing Remarks
(mm) Mass Retained Retatined

13.2 0 0 100.00 100

9.5 0 0 0.00 100

4.75 0 0 0.00 100

2.36 0 0 0.00 100

1.18 0 0 0.00 100

0.3 0 0 0.00 100

0.075 42 42 10.37 89.63

Remarks:

Contrator's Representative Consultant's Representative


NATIONAL HIGH WAY AUTHORITY OF INDIA
WESTERN TRSNSPORT CORRIDOR- TUMKUR- HAVERI NH-4 PROJECT
Rehabilitation and Upgrading of Chitradurga Section (Km 189 to Km 207)
Consultants: M/s Louis Berger Group INC. Contractor: Supreme-MBL (J/V)

GRADATION FOR SDBC Gr- II

Sample : 0-3 mm Date Of Sampling : 16/4/2008


Location : 205+500 RHS Date Of Testing : 16/4/2008
Sample No : SDBC CA 0-3/Apr08/3/236 Sampled by : FIROZ ALAM
Wt. Of Sample : 9888

Seive Size Cumulative % Cumulative


Mass Retained % Passing Remarks
(mm) Mass Retained Retatined

13.2 0 0 100.00 100

9.5 0 0 0.00 100

4.75 0 0 0.00 100

2.36 750 750 7.58 92.42

1.18 2084 2834 28.66 71.34

0.3 3490 6324 63.96 36.04

0.075 2832 9156 92.60 7.40

Remarks:

Contrator's Representative Consultant's Representative


Gms

Contrator's Representative Consultant's Representative


NATIONAL HIGH WAY AUTHORITY OF INDIA
WESTERN TRSNSPORT CORRIDOR- TUMKUR- HAVERI NH-4 PROJECT
Rehabilitation and Upgrading of Chitradurga Section (Km 189 to Km 207)
Consultants: M/s Louis Berger Group INC. Contractor: Supreme-MBL (J/V)

GRADATION FOR SDBC Gr- II

Sample : 0-3 mm Date Of Sampling : 16/4/2008


Location : 205+500 RHS Date Of Testing : 16/4/2008
Sample No : SDBC CA 0-3/Apr08/3/236 Sampled by : FIROZ ALAM
Wt. Of Sample : 12400

Seive Size Cumulative % Cumulative


Mass Retained % Passing Remarks
(mm) Mass Retained Retatined

13.2 0 0 100.00 100

9.5 0 0 0.00 100

4.75 0 0 0.00 100

2.36 712 712 5.74 94.26

1.18 2337 3049 24.59 75.41

0.3 4634 7683 61.96 38.04

0.075 3932 11615 93.67 6.33

Remarks:

Contrator's Representative Consultant's Representative


Gms

Contrator's Representative Consultant's Representative


NATIONAL HIGH WAY AUTHORITY OF INDIA
WESTERN TRSNSPORT CORRIDOR- TUMKUR- HAVERI NH-4 PROJECT
Rehabilitation and Upgrading of Chitradurga Section (Km 189 to Km 207)
Consultants: M/s Louis Berger Group INC. Contractor: Supreme-MBL (J/V)

GRADATION FOR SDBC Gr- II

Sample : 0-3 mm Date Of Sampling : 16/4/2008


Location : 205+500 RHS Date Of Testing : 16/4/2008
Sample No : SDBC CA 0-3/Apr08/3/236 Sampled by : FIROZ ALAM
Wt. Of Sample : 10985 Gms

Seive Size Cumulative % Cumulative


Mass Retained % Passing Remarks
(mm) Mass Retained Retatined

13.2 0 0 100.00 100

9.5 0 0 0.00 100

4.75 0 0 0.00 100

2.36 893 893 8.13 91.87

1.18 2056 2949 26.85 73.15

0.3 4161 7111 64.73 35.27

0.075 3241 10351 94.23 5.77

Remarks:

Contrator's Representative Consultant's Representative


NATIONAL HIGH WAY AUTHORITY OF INDIA
WESTERN TRSNSPORT CORRIDOR- TUMKUR- HAVERI NH-4 PROJECT
Rehabilitation and Upgrading of Chitradurga Section (Km 189 to Km 207)
Consultants: M/s Louis Berger Group INC. Contractor: Supreme-MBL (J/V)

GRADATION FOR SDBC Gr- II

Sample : 3-7mm Date Of Sampling : 16/4/2008


Location : 205+500 RHS Date Of Testing : 16/4/2008
Sample No : SDBC CA 3-7/Apr08/2/235 Sampled by : FIROZ ALAM
Wt. Of Sample : 10132 Gms

Seive Size Cumulative % Cumulative


Mass Retained % Passing Remarks
(mm) Mass Retained Retatined

13.2 0 0 100.00 100

9.5 0 0 0.00 100

4.75 3035 3035 29.95 70.05

2.36 2992 6027 59.48 40.52

1.18 1357 7383 72.87 27.13

0.3 1114 8497 83.86 16.14

0.075 1477 9974 98.44 1.56

Remarks:

Contrator's Representative Consultant's Representative


NATIONAL HIGH WAY AUTHORITY OF INDIA
WESTERN TRSNSPORT CORRIDOR- TUMKUR- HAVERI NH-4 PROJECT
Rehabilitation and Upgrading of Chitradurga Section (Km 189 to Km 207)
Consultants: M/s Louis Berger Group INC. Contractor: Supreme-MBL (J/V)

GRADATION FOR SDBC Gr- II

Sample : 3-7mm Date Of Sampling : 16/4/2008


Location : 205+500 RHS Date Of Testing : 16/4/2008
Sample No : SDBC CA 3-7/Apr08/2/235 Sampled by : FIROZ ALAM
Wt. Of Sample : 9802 Gms

Seive Size Cumulative % Cumulative


Mass Retained % Passing Remarks
(mm) Mass Retained Retatined

13.2 0 0 100.00 100

9.5 0 0 0.00 100

4.75 2917 2917 29.76 70.24

2.36 2846 5763 58.79 41.21

1.18 1293 7055 71.98 28.02

0.3 1131 8187 83.52 16.48

0.075 1198 9384 95.74 4.26

Remarks:

Contrator's Representative Consultant's Representative


NATIONAL HIGH WAY AUTHORITY OF INDIA
WESTERN TRSNSPORT CORRIDOR- TUMKUR- HAVERI NH-4 PROJECT
Rehabilitation and Upgrading of Chitradurga Section (Km 189 to Km 207)
Consultants: M/s Louis Berger Group INC. Contractor: Supreme-MBL (J/V)

GRADATION FOR SDBC Gr- II

Sample : 3-7mm Date Of Sampling : 16/4/2008


Location : 205+500 RHS Date Of Testing : 16/4/2008
Sample No : SDBC CA 3-7/Apr08/2/235 Sampled by : FIROZ ALAM
Wt. Of Sample : 9832 Gms

Seive Size Cumulative % Cumulative


Mass Retained % Passing Remarks
(mm) Mass Retained Retatined

13.2 0 0 100.00 100

9.5 0 0 0.00 100

4.75 3126 3126 31.79 68.21

2.36 2789 5915 60.16 39.84

1.18 1275 7190 73.13 26.87

0.3 1080 8270 84.11 15.89

0.075 1179 9449 96.10 3.9

Remarks:

Contrator's Representative Consultant's Representative


NATIONAL HIGH WAY AUTHORITY OF INDIA
WESTERN TRSNSPORT CORRIDOR- TUMKUR- HAVERI NH-4 PROJECT
Rehabilitation and Upgrading of Chitradurga Section (Km 189 to Km 207)
Consultants: M/s Louis Berger Group INC. Contractor: Supreme-MBL (J/V)

GRADATION FOR SDBC Gr- II

Sample : 7-15mm Date Of Sampling : 16/4/2008


Location : 205+500 RHS Date Of Testing : 16/4/2008
Sample No : SDBC CA 7-15/Apr08/1/234 Sampled by : FIROZ ALAM
Wt. Of Sample : 17222 Gms

Seive Size Cumulative % Cumulative


Mass Retained % Passing Remarks
(mm) Mass Retained Retatined

13.2 0 0 100.00 100

9.5 2234 2234 12.97 87.03

4.75 14046 16280 94.53 5.47

2.36 193 16473 95.65 4.35

1.18 749 17222 100.00 0.00

0.3 0 0 0.00 0.00

0.075 0 0 0.00 0.00

Remarks:

Contrator's Representative Consultant's Representative


NATIONAL HIGH WAY AUTHORITY OF INDIA
WESTERN TRSNSPORT CORRIDOR- TUMKUR- HAVERI NH-4 PROJECT
Rehabilitation and Upgrading of Chitradurga Section (Km 189 to Km 207)
Consultants: M/s Louis Berger Group INC. Contractor: Supreme-MBL (J/V)

GRADATION FOR SDBC Gr- II

Sample : 7-15mm Date Of Sampling : 16/4/2008


Location : 205+500 RHS Date Of Testing : 16/4/2008
Sample No : SDBC CA 7-15/Apr08/1/234 Sampled by : FIROZ ALAM
Wt. Of Sample : 15880 Gms

Seive Size Cumulative % Cumulative


Mass Retained % Passing Remarks
(mm) Mass Retained Retatined

13.2 0 0 100.00 100

9.5 2136 2136 13.45 86.55

4.75 12953 15089 95.02 4.98

2.36 149 15238 95.96 4.04

1.18 642 15880 100.00 0.00

0.3 0 0 0.00 0.00

0.075 0 0 0.00 0.00

Remarks:

Contrator's Representative Consultant's Representative


NATIONAL HIGH WAY AUTHORITY OF INDIA
WESTERN TRSNSPORT CORRIDOR- TUMKUR- HAVERI NH-4 PROJECT
Rehabilitation and Upgrading of Chitradurga Section (Km 189 to Km 207)
Consultants: M/s Louis Berger Group INC. Contractor: Supreme-MBL (J/V)

GRADATION FOR SDBC Gr- II

Sample : 7-15mm Date Of Sampling : 16/4/2008


Location : 205+500 RHS Date Of Testing : 16/4/2008
Sample No : SDBC CA 7-15/Apr08/1/234 Sampled by : FIROZ ALAM
Wt. Of Sample : 16830 Gms

Seive Size Cumulative % Cumulative


Mass Retained % Passing Remarks
(mm) Mass Retained Retatined

13.2 0 0 100.00 100

9.5 1890 1890 11.23 88.77

4.75 13922 15812 93.95 6.05

2.36 441 16253 96.57 3.43

1.18 577 16830 100.00 0.00

0.3 0 0 0.00 0.00

0.075 0 0 0.00 0.00

Remarks:

Contrator's Representative Consultant's Representative