Customer : WOW Manual : AMM

Type : A318/A319/A320/A321 Selected applicability : ALL


Rev. Date : May 01, 2019
73-25-34-710-042-A - Operational Test of the EIU with the CFDS
VT-TTK

** ON A/C 201-250

TASK 73-25-34-710-042-A
Operational Test of the EIU with the CFDS

FIN : 1000EM1 , 1000EM2


1. Reason for the Job
Use this test to do a check of the EIU operation.
2 Job Set-up Information
A. Referenced Information

REFERENCE DESIGNATION
(Ref. 24-41-00-861-002-A). Energize the Aircraft Electrical Circuits from the External Power
(Ref. 24-41-00-861-002-A-01). Energize the Aircraft Electrical Circuits from the APU
(Ref. 24-41-00-861-002-A-02). Energize the Aircraft Electrical Circuits from Engine 1(2)
(Ref. 24-41-00-862-002-A). De-energize the Aircraft Electrical Circuits Supplied from the External
Power
(Ref. 24-41-00-862-002-A-01). De-energize the Aircraft Electrical Circuits Supplied from the APU
(Ref. 24-41-00-862-002-A-02). De-energize the Aircraft Electrical Circuits Supplied from the Engine
1(2)
(Ref. 31-32-00-860-012-A). Procedure to Get Access to the SYSTEM REPORT/TEST/ENG Page
DISCRETE OUTPUTS Menu SHEET 1

Print Date: June 24, 2019 Page 1 of 4


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : WOW Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : ALL
Rev. Date : May 01, 2019
73-25-34-710-042-A - Operational Test of the EIU with the CFDS
VT-TTK

< >

< >

< >

< * >

< >

N_MM_732534_5_XCN0_01_00

Figure 73(IAE)-25-34-991-90200-13-B / SHEET 1/1 - DISCRETE OUTPUTS Menu


** ON A/C 201-250

Print Date: June 24, 2019 Page 2 of 4


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : WOW Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : ALL
Rev. Date : May 01, 2019
73-25-34-710-042-A - Operational Test of the EIU with the CFDS
VT-TTK

3. Job Set-up
Subtask 73-25-34-861-054-A
A. Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002) .
Subtask 73-25-34-865-060-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:

PANEL DESIGNATION FIN LOCATION


49VU ENGINE/1 AND 2/IGN/SYS A 1JH A03
FOR FIN 1000EM1 (ENGINE-1)
49VU ENGINE/1/FADEC A/AND EIU 1 2KS1 A04
121VU ENGINE/IGN/ENG1/SYS B 3JH1 P41
121VU ENGINE/IGN/ENG1/SYS A BAT 2JH1 P39
121VU ENGINE/ENG1/FADEC B/AND EIU 1 4KS1 R41
FOR FIN 1000EM2 (ENGINE-2)
49VU ENGINE/2/FADEC A/AND EIU 2 2KS2 A05
121VU ENGINE/IGN/ENG2/SYS B 3JH2 P42
121VU ENGINE/IGN/ENG2/SYS A BAT 2JH2 P40
121VU ENGINE/ENG2/FADEC B/AND EIU 2 4KS2 Q40
Subtask 73-25-34-860-063-A
C. On the MAINTENANCE PNL 50VU:
Release the FADEC GND PWR 1(2) pushbutton switch (on the pushbutton switch, the ON legend comes
on).
4. Procedure
Subtask 73-25-34-710-060-B
A. Operational Test of the EIU:
(1) Do this test

NOTE: This test is for the system 1. For the system 2, use the indication between parentheses.

(2) On the left or right MCDU get the SYSTEM REPORT/TEST ENG page. (Ref. AMM TASK 31-32-00-
860-012) .

ACTION RESULT
1.Push the line key adjacent to the EIU1 (EIU2) · The EIU1 (EIU2) menu comes into view.
indication.
2.Push the line key adjacent to the GND SCAN- · On the MENU, the NO FAILURE message
NING indication. comes into view.
3.Push the line key adjacent to the RETURN in- · The EIU 1(2) menu comes into view.
dication.
4.Push the line key adjacent to the DISCRETE · The DISCRETE OUTPUTS SIMUL menu comes
OUTPUTS indication. into view.
DISCRETE OUTPUTS Menu SHEET 1
5.Push the line key adjacent to the FAULT indica- · The FAULT STATUS = 1 comes into view.
tion. · On the ENG panel 115VU: the FAULT 1(2) le-
gend comes on.
6.Push the line key adjacent to the FAULT indica- · The FAULT STATUS = 0 comes into view.
tion. · On the ENG panel 115VU: the FAULT 1(2) le-
gend goes off.

Print Date: June 24, 2019 Page 3 of 4


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : WOW Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : ALL
Rev. Date : May 01, 2019
73-25-34-710-042-A - Operational Test of the EIU with the CFDS
VT-TTK

ACTION RESULT
7.Push the line key adjacent to the RETURN in- · The CFDS menu comes into view.
dication until the CFDS menu comes into view.
8.Push the MCDU MENU key · The MCDU menu comes into view.

5. Close-up
Subtask 73-25-34-860-064-A
A. On the maintenance panel 50VU:
Push the FADEC GND PWR 1(2) pushbutton switch.
The ON legend goes off.
Subtask 73-25-34-862-054-A
B. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002) .

End of document

Print Date: June 24, 2019 Page 4 of 4


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.