Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 14

Phase – I: Major Stations Cut-of

Likely Date of Implementation: 11 Sept - 10 Nov 2019


S.No. Connectivity Services No. of Services
AFTN/DSC 1
1 Mumbai-Delhi
OFPL* 1
AFTN/DSC 1
2 Kolkata-Delhi
OFPL* 1
AFTN/DSC 1
3 Mumbai-Kolkata
IP Pipe* 1
4 Mumbai-Chennai AFTN/DSC 1
DSC 1
5 HIAL-Mumbai
RADAR DATA 1
6 BIAL-Mumbai DSC 1
7 Kolkata-Chennai AFTN/DSC 1
AFTN/DSC 1
8 Chennai-BIAL
RADAR DATA 1
AFTN/DSC 1
9 Chennai-HIAL Speech/VCCS 1
RADAR DATA 1
TOTAL SERVICES 16

*These are new services and were not part of RFP, However, same
were identified later and were confirmed by the station in the Site
Order Verification Sheets (SOVS). Implementation schedule of these
services will be discussed with M/s Harris and will be intimated in
due course of time. The station is advised to make provisions of the
required interface for these services too along with the original RFP
requirement for interfacing with FTI equipment.
Phase - II: MUMBAI CUTOVER PLAN
Likely Date of Implementation: 11 Nov - 10 Jan 2020
S.No. Connectivity Service No. of Services
AFTN/DSC 1
1. Mumbai-Goa
RCAG 1
RCAG 1
2. Mumbai-Porbandar
RADAR DATA 1
AFTN/DSC 1
3. Mumbai-Aurangabad
RCAG 1
AFTN/DSC 1
4. Mumbai-Ahmedabad
RADAR DATA 1
AFTN/DSC 1
5. Mumbai-Nagpur
RADAR DATA 1
AFTN/DSC 1
6. Mumbai-Trivandrum
RADAR DATA* 1
7. Mumbai-Bhavnagar AFTN/DATIS 1
8. Mumbai-Rajkot DATIS 1
9. Mumbai-Surat DATIS 1
AFTN/DSC 1
RADAR DATA 1
10. Mumbai-Juhu
DATA* 1
DSC 1
DSC 1
11. Mumbai-Mangalore
RADAR DATA* 1
12. Mumbai-Udaipur RADAR DATA 1
13. Mumbai-Bhopal RADAR DATA 1
SPEECH 16
14 Mumbai - Tx STN Andheri
SELCAL 1
SPEECH 10
15 Mumbai - Rx Stn Dahisar
IP Pipe* 1
16 Mumbai-Bellary RADAR DATA* 1
17 Mumbai-Vasant Kunj ATFM* 1
Mumbai-Hyderabad
18 RADAR DATA* 1
(Begumpet)
TOTAL SERVICES 54
*These are new services and were not part of RFP, However, same were
identified later and were confirmed by the station in the Site Order
Verification Sheets (SOVS). Implementation schedule of these services will
be discussed with M/s Harris and will be intimated in due course of time.
The station is advised to make provisions of the required interface for these
services too along with the original RFP requirement for interfacing with FTI
equipment.
Phase - III: CHENNAI CUTOVER PLAN
Likely Date of Implementation: 11 Jan - 10 Mar 2020
S.No. Connectivity Service No. of Services
Chennai-Hyderabad AFTN/DSC 1
1
(Begumpet) RADAR DATA* 1
AFTN/DSC 1
2 Chennai-Tiruchirappalli RADAR DATA* 1
ADS-B* 1
AFTN/DSC 1
3 Chennai-Trivandrum RADAR DATA 1
RCAG 1
RCAG 1
4 Chennai-Madurai
AFTN/DSC 1
Speech/VCCS 1
5 Chennai-Mangalore RADAR DATA 1
ADS-B* 1
RCAG 1
6 Chennai-Vizag RCAG* 1
RADAR DATA 1
RCAG 1
7 Chennai-Portblair ADS-B 1
RCAG* 1
8 Chennai-Porur Chennai RADAR DATA 1
Speech/VCCS 1
9 Chennai-Bellary RCAG 1
RADAR DATA 1
ADS-B 1
10 Chennai-Cochin Int.
RADAR DATA 1
12 Chennai-Ooty RCAG 1
Chennai-Tx Stn.
13 VOICE/DATA 1
Mugalivakkam
RADAR DATA* 1
14 Chennai-Nagpur
ADS-B* 1
15 Chennai-Bangalore HAL RADAR DATA* 1
16 Chennai-Calicut ADS-B* 1
17 Chennai-Vijaywada ADS-B* 1
18 Chennai-Agatti RCAG* 1
19 Chennai-Coimbatore ADS-B* 1
TOTAL SERVICES 34
*These are new services and were not part of RFP, However, same were
identified later and were confirmed by the station in the Site Order
Verification Sheets (SOVS). Implementation schedule of these services will
be discussed with M/s Harris and will be intimated in due course of time.
The station is advised to make provisions of the required interface for these
services too along with the original RFP requirement for interfacing with FTI
equipment.
Phase - IV: KOLKATA CUTOVER PLAN
Likely Date of Implementation: 11 Mar - 10 May 2020
S.No. Connectivity Service No. of Services
AFTN/DSC 1
1. Kolkata-Nagpur RADAR DATA 1
ADS-B 1
AFTN/DSC 1
RADAR DATA 1
2. Kolkata-Varanasi
IP Pipe* 1
ADS-B 1
AFTN/DSC 1
3. Kolkata-Bhubaneswar RCAG 1
ADS-B 1
AFTN/DSC 1
RADAR DATA 1
4. Kolkata-Guwahati
IP Pipe* 1
ADS-B 1
AFTN/DSC 1
5. Kolkata-Patna IP Pipe* 1
ADS-B 1
6. Kolkata-Ranchi AFTN/DSC 1
DATIS 1
7. Kolkata-Raipur
IP Pipe* 1
DATIS 1
8. Kolkata-Imphal
RADAR DATA* 1
DATIS 1
9. Kolkata-Dimapur
IP Pipe* 1
DATIS 1
10. Kolkata-Dibrugarh
ADS-B* 1
AFTN/DATIS 1
11. Kolkata-Agartala IP Pipe* 1
ADS-B 1
AFTN/DATIS 1
12. Kolkata-Gaya
RCAG* 1
RCAG 1
13. Kolkata-Vizag
RADAR DATA 1
RCAG 1
14. Kolkata-Kathihar
RADAR DATA 1
RCAG 1
15. Kolkata-Jharsuguda
RADAR DATA 1
RCAG 1
16. Kolkata-Portblair
ADS-B* 1
17. Kolkata-Behrampore RADAR DATA 1
18. Kolkata-Badu RADAR DATA 1
19. Kolkata-Rajahmundry AFTN/DATIS 1
20 Kolkata-Khajuraho IP Pipe* 1
21 Kolkata-Bhopal RADAR DATA* 1
22 Kolkata-Bagdogra IP Pipe* 1
23 Kolkata-Jamshedpur IP Pipe* 1
Kolkata-Hyderabad
24 RADAR DATA* 1
(Begumpet)
TOTAL SERVICES 47

*These are new services and were not part of RFP, However, same were
identified later and were confirmed by the station in the Site Order
Verification Sheets (SOVS). Implementation schedule of these services will
be discussed with M/s Harris and will be intimated in due course of time.
The station is advised to make provisions of the required interface for
these services too along with the original RFP requirement for interfacing
with FTI equipment.
Phase - V: DELHI CUTOVER PLAN
Likely Date of Implementation: 11 May - 10 July 2020
S.No. Connectivity Services No. of Services
AFTN/DSC 1
IP Pipe* 1
1 Delhi-Jaipur
RADAR DATA* 1
ADS-B 1
AFTN/DSC 1
ADS-B 1
2 Delhi-Lucknow
IP Pipe* 1
RADAR DATA 1
AFTN/DSC 1
3 Delhi-Nagpur ADS-B* 1
RADAR DATA* 1
AFTN/DSC 1
4 Delhi-Varanasi ADS-B 1
RADAR DATA 1
AFTN/DSC 1
OFPL* 1
5 Delhi-Ahmedabad
ADS-B* 1
RADAR DATA* 1
6 Delhi-Bhunter AFTN / DATIS 1
7 Delhi-Dehradun DATIS 1
8 Delhi-CHQ AFTN 1
9 Delhi-Safdarjung AFTN 1
11 Delhi-Gwalior RCAG 1
12 Delhi-Jodhpur RCAG 1
14 Delhi-Khajuraho RCAG 1
AFTN/DSC 1
RADAR DATA 1
15 Delhi-Amritsar
ADS-B 1
RCAG 1
16 Delhi-Bhopal RADAR DATA 1
17 Delhi-Udaipur RADAR DATA 1
18 Delhi-Bijwasan RADAR DATA 1
19 Delhi- Bikaner IP Pipe* 1
20 Delhi Pantnagar IP Pipe* 1
21 Delhi-Kota IP Pipe* 1
22 Delhi-Chandigarh IP Pipe* 1
23 Delhi-Jalalabad IP Pipe* 1
24 Delhi-Sirsa IP Pipe* 1
25 Delhi-Jaisalmer ADS-B ADS-B* 1
26 Delhi-Vasant Kunj IP Pipe* 1
27 Delhi-Rangpuri AFTN/DSC* 1
Delhi-Hyderabad
28 RADAR DATA* 1
(Begumpet)
TOTAL SERVICES 42

*These are new services and were not part of RFP, However, same were
identified later and were confirmed by the station in the Site Order
Verification Sheets (SOVS). Implementation schedule of these services will
be discussed with M/s Harris and will be intimated in due course of time.
The station is advised to make provisions of the required interface for these
services too along with the original RFP requirement for interfacing with FTI
equipment.
Phase - VI: HIAL-BIAL CUTOVER PLAN
Likely Date of Implementation: 11 July - 10 Aug 2020
S.No. Connectivity Service No. of Services
Speech/VCCS 1
1 HAL-BIAL AFTN 1
RADAR DATA 1
2 Bangalore-BIAL RADAR DATA 1
DSC 1
3 Mangalore-BIAL
RADAR DATA* 1
AFTN/DSC 1
4 Cochin Int-BIAL
RADAR DATA 1
AFTN/DSC 1
5 Nagpur-HIAL
RADAR DATA 1
Speech/VCCS 1
6 Hyderabad-HIAL
RADAR DATA 1
7 Trivandrum-BIAL RADAR DATA 1
8 Bellary- BIAL RADAR DATA 1
Hyderabad (Begumpet)-
9 RADAR DATA* 1
BIAL
10 Bellary- HIAL RADAR DATA* 1
11 Coimbatore-BIAL RADAR DATA* 1
TOTAL SERVICES 17

*These are new services and were not part of RFP, However, same were
identified later and were confirmed by the station in the Site Order Verification
Sheets (SOVS). Implementation schedule of these services will be discussed
with M/s Harris and will be intimated in due course of time. The station is
advised to make provisions of the required interface for these services too
along with the original RFP requirement for interfacing with FTI equipment.
Phase - VII: FINAL CUTOVER PLAN
Likely Date of Implementation: 11 Aug - 10 Sept 2020
S.No. Connectivity Service No. of Services
1 Varanasi-Nagpur AFTN/DSC 1
AFTN/DSC 1
2 Varanasi-Patna
RADAR DATA* 1
AFTN/DSC 1
3 Varanasi-Lucknow RADAR DATA* 1
RADAR DATA* 1
4 Varanasi-Jharsuguda RADAR DATA 1
5 Varanasi-Katihar RADAR DATA 1
6 Varanasi-Khajuraho DATIS 1
AFTN/DSC 1
7 Udaipur-Ahmedabad RADAR DATA 1
RCAG 1
8 Ahmedabad –Vadodhara AFTN/DSC 1
AFTN/DSC 1
9 Ahmedabad-Indore
RCAG* 1
10 Ahmedabad- Bhuj RCAG 1
11 Ahmedabad-Porbandar RADAR DATA 1
12 Ahmedabad-Bhopal RADAR DATA 1
AFTN/DSC 1
13 Nagpur-Bhopal RCAG 1
RADAR DATA 1
14 Nagpur-Hyderabad AFTN/DSC 1
15 Nagpur-Jabalpur DATIS 1
16 Nagpur-Gondia DATIS 1
17 Nagpur-Jharsuguda RADAR DATA 1
18 Hyderabad-Tirupati DATIS 1
19 Hyderabad-Vijaywada DATIS 1
20 Mangalore- Cochin Int. RADAR DATA 1
RADAR DATA 1
21 Trivandrum-Cochin Int.
AFTN/DSC 1
AFTN/DSC 1
22 Trivandrum-Mangalore
RADAR DATA 1
23 Trivandrum-Calicut AFTN/DSC 1
24 Trivandrum-Coimbatore AFTN/DSC 1
25 Trivandrum-Ooty RCAG 1
26 Trivandrum-Agatti RCAG 1
27 Katihar-Guwahati RADAR DATA 1
28 Goa-Hubli AFTN/DATIS 1
29 Jaipur-Udaipur RADAR DATA* 1
30 Jaipur-Bhopal RADAR DATA* 1
31 Varanasi-Bhopal RADAR DATA* 1
32 Nagpur-Udaipur RADAR DATA* 1
33 Nagpur-Bhubneswar RADAR DATA* 1
34 Bhubneswar-JharsugudaRADAR DATA* 1
35 Bhubeswar-Badu RADAR DATA* 1
36 Bhubneswar-Vizag RADAR DATA* 1
37 Bhubeswar-Berhampur RADAR DATA* 1
38 Katihar-Patna RADAR DATA* 1
39 Patna-Badu RADAR DATA* 1
40 Agartala-Badu RADAR DATA* 1
41 Cochin Int.-Trichy RADAR DATA* 1
42 Mangalore-Bellary RADAR DATA* 1
43 Mangalore-Calicut RADAR DATA* 1
44 Mangalore-Hubli IP Pipe* 1
45 Cochin Int.-CalicutRADAR DATA* 1
46 Trivandrum-Trichy ADS-B* 1
47 Cochin Int.-Coimbatore
RADAR DATA* 1
48 Cochin Int.-Kannur AFTN/DSC* 1
RADAR DATA* 1
49 Guwahati-Agartala
ADS-B* 1
50 Imphal-Agartala RADAR DATA* 1
51 Guwahati-Imphal RADAR DATA* 1
52 Guwahati-Dibrugarh ADS-B* 1
TOTAL SERVICES 63

*These are new services and were not part of RFP, However, same were
identified later and were confirmed by the station in the Site Order
Verification Sheets (SOVS). Implementation schedule of these services will be
discussed with M/s Harris and will be intimated in due course of time. The
station is advised to make provisions of the required interface for these
services too along with the original RFP requirement for interfacing with FTI
equipment.
Phase - VIII: GAGAN CUTOVER PLAN
Likely Date of Implementation: 11 Sept - 10 Oct 2020
S.No. Connectivity Services No. of Services
1 Kolkata GAGAN-Bangalore (Kundanhali) GAGAN 1
2 Nangloi-Banglore (Kundanhali) GAGAN 1
3 Jammu-Bangalore (Kundanhali) GAGAN 1
4 Jaisalmer-Bangalore (Kundanhali) GAGAN 1
5 Ahmedabad GAGAN-Bangalore (Kundanhali) GAGAN 1
6 Nagpur INRES Site-Bangalore (Kundanhali) GAGAN 1
7 Goa GAGAN-Bangalore (Kundanhali) GAGAN 1
8 Porbandar GAGAN-Bangalore (Kundanhali) GAGAN 1
9 Gaya GAGAN-Bangalore (Kundanhali) GAGAN 1
10 Bhubaneswar INRES Site- Bangalore (Kundanhali) GAGAN 1
11 Bangalore HAL GAGAN-Bangalore(Kundanhali) GAGAN 1
12 Trivandrum INRES SITE-Bangalore(Kundanhali) GAGAN 1
13 Portblair GAGAN-Bangalore(Kundanhali) GAGAN 1
14 Guwahati GAGAN- Bangalore(Kundanhali) GAGAN 1
15 Dibrugarh GAGAN- Bangalore(Kundanhali) GAGAN 1
TOTAL SERVICES 15

The interface requirement for the GAGAN Services will be taken care by GM(CNS-GNSS),GAGAN
BENGALURU
Phase - IX: ATFM CUTOVER PLAN
Likely Date of Implementation: 11 Oct - 10 Nov 2020
S.No. Connectivity Services No. of Services
1 Mumbai-Vasant Kunj ATFM 1
2 Kolkata-Vasant Kunj ATFM 1
3 Hyderabad (Begumpet)-Vasant Kunj ATFM 1
4 Ahmedabad-Vasant Kunj ATFM 1
5 Nagpur-Vasant Kunj ATFM 1
6 Chennai-Vasant Kunj ATFM 1
7 Delhi-Vasant Kunj ATFM 1
TOTAL SERVICES 7

*These are new services and were not part of RFP, However, same were identified
later and were confirmed by the station in the Site Order Verification Sheets (SOVS).
The station is advised to make provisions of the required interface for these services