MAHARASHTRA POLLUTION CONTROL BOARD

Minutes of 8thConsent Appraisal Committee Meeting of 2018-2019 (2nd sitting) held on 11.12.2018 at 11.00 a.m. in the chamber of Hon’ble Chairman, 3rd Floor,
Maharashtra Pollution Control Board, Kalpataru Point, Sion, Mumbai, Maharashtra.
……….
Following members of the Consent Appraisal Committee were present:
1. Shri Sudhir Shrivastava, Chairman
Chairperson, MPCB, Mumbai.
2. Shri. P.P. Nandusekhar Member
Technical Advisor, MIDC.

3. Shri P. K. Mirashe Member Convener


Assistant Secretary (Technical), M.P.C. Board, Mumbai.

Following Officer of MPCB were present for the meeting:

1. Shri. Y. B. Sontakke, JD(WPC), MPCB, Mumbai. Special Invitee


2. Shri. N. N.Gurav RO(HQ), MPCB, Mumbai. Special Invitee
Additional Chief Secretary, Home (Transport) Dept., Mumbai could not attend the meeting. Leave of absence was granted to them.
Following Officer of MPCB were present for the meeting:
Chairperson of the committee welcomed the members of the committee and allowed proceeding of the meeting to start.
The Minutes of 8th Consent Appraisal Committee Meeting of 2018-2019 (1st sitting) held on 10.12.2018 (Booklet No. 14 (Part-I)) circulated vide letter
no. BO/CAC-CAELL/TB/B-190109-FTS-0083 Dated 09.01.2018 were confirmed.
The meeting thereafter deliberated on the fresh agenda items [Booklet No. 14 (Part-II)] placed before the committee and following decisions were taken:

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 1 of 55
Application Decision on grant
Sr. Industry name and Consent
Unique of consent Remarks / Discussion
No Address granted up to
Number

Booklet No. 14 (Part-II)


Consent to Establish/Operate/Renewal
1 MPCB- Trion Properties Pvt. NOT APPROVED --- Committee noted that PP has applied for Re-validation of consent to
CONSENT- Ltd., IT building & Establish for remaining BUA for the IT activity.
000000231982 Commercial Mall, Re-validation of
71 Survey No. 35, Hissa Consent to
Committee also noted that,PP has obtained Consent to Establish on
No. 9+10+11+12/C (IT Establish for
building) & Hissa No. remaining BUA 16.11.2006 for plot area 41,300 sq. Mtrs, obtained Environmental
9+10+11+12/B (Mall Clearance on 08.05.2007 for the total plot area 41,300 Sq. Mtrs and total
building) Village BUA 47,866.60 Sq. Mtrs for development of shopping Mall and IT building
Vadgaon Sheri, Tal. and further amended EC on 15.06.2018 for IT and Mall building project for
Haveli, Dist. Pune. the plot area 40958.29 sq.mtrs. and Total BUA 100041.67 sq.mtrs.

After reviewing the case it was observed that PP is operating IT activity


without consent to operate from the Board.

In view of above it was decided to defer this case and call to PP for the
presentation along with all relevant documents and pollution control
system provided.

2 MPCB- Forbes & Company APPROVED Up to Committee noted that PP has obtain Environmental Clearance dated
CONSENT- Ltd., CTS No. 15A, 15C, commissioning 18.07.2016, Commencement Certificate dated 29.02.2016 and IOD dated
0000002271 15D, 15E & 15F, Consent to or 5 year 02.02.2015.
Village Chandivali, Establish whichever is
Kurla, Mumbai. earlier. It was decided to grant Consent to Establish for construction of residential
project “VICINIA” on plot area 27,263.5 sq.mtrs. for total construction
BUA - 95,368.49 sq.mtrs. subject to following conditions;

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 2 of 55
1. PP shall provide STP so as to achieve the treated domestic effluent
standard for the parameter BOD-10 mg/lit.
2. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air conditioning, cooling tower make up,
firefighting etc. and remaining shall be utilized on land for gardening.
3. PP shall install online monitoring system for BOD, TSS and flow at the
outlet of STP with connectivity to MPCB Server.
4. PP shall install organic waste digester along with composting facility/
bio-digester (biogas) with composting facility for the treatment of
wet garbage.
5. PP shall obtain NOC from MCGM for disposal of construction debris
at specific site inspected and approved by Municipal Corporation.
6. PP shall extend/submit BG of Rs. 25 Lakhs towards compliance of EC
and consent to establish condition.
7. Consent shall be issued subject to any further order that may be
passed by the Hon’ble Supreme Court of India in special leave
petition Civil No. D23708/2017.
8. Industry shall not take effective steps towards construction prior to
obtaining NOC from MCGM for disposal of construction debris.

3 MPCB- Housing Development NOT APPROVED ---- Committee noted that PP has not submitted information about
CONSENT- & Infrastructure construction details and validity of EC/Consent to Establish.
Limited (HDIL), CTS Consent to 1st
0000033333
No. 5370(PT), Operate (Part) In view of above it was decided to defer the case due to lack of clarity and
7643(PT) & 4207(PT), and Revalidation resubmit in next CAC along with all above details including design details
Sale Building no. 3, of Consent to of STP/OWC.
Village Kolekalyan, Establish for
Andheri, Mumbai. remaining area.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 3 of 55
4 MPCB- Raheja Universal (Pvt.) NOT APPROVED --- Committee noted that reply of SCN submitted by the PP is not satisfactory
CONSENT- Ltd. (Raheja Exotica In view of above it was decided to defer the case due to lack of clarity and
Project), CTS No. 1965, Renewal of resubmit in next CAC along with all above details including design details
0000032879
Consent to
2053/B, 2053/C, of STP/OWC.
2053/C-1, 2053/D, Operate (Part-I)
2053/E, 2055/B &
2055/C, Village
Erangal, Patilwadi
Road, Malad (W),
Mumbai – 400 064.

5 MPCB- Saifee Hospital, Approved Up to Committee noted the reply to SCN submitted by PP regarding increase in
CONSENT- 31.03.2019 CI, undertaking submitted about BUA, qty of effluent generation, details
0000029956 15/17, C. S. No. 37, Renewal of ETP and STP provided, Details of BMW generation and BG and noted
Girgaon Division, Combine Consent
that;
Maharshi Karve Road, and BMW
Charni Road (E), Authorization 1. Total BUA of the hospital is 1434 .22 Sq. mtrs.
Mumbai 2. Copy of letter of Member Secretary (MCZMA) dated 04.12.2018.
3. Provision of ETP and STP to treat effluent /sewage generation.
4. BNH NOC valid up to 31.03.2019

In view of above, it was decided to grant renewal of Combine Consent and


BMW Authorization for 240 nos of beds by imposing following conditions;

1. PP shall submit BG’s as per the regime of HCS.

Consent shall be issued after submission of additional requisite consent


fee, if any.

6 MPCB- Tata Consultancy Approved Up to Committee noted that industry is engaged in IT and ITES activities on lease
st
CONSENT- Services Ltd., Plot C, 1 Consent to 31.10.2020 basis at M/s ROMA Builder Pvt. Ltd (Hiranadani Estate).
0000032083 Patlipada Village, Operate for IT
Thane. activity Also, noted that M/s ROMA Builder Pvt. Ltd (Hiranadani Estate) has
obtained EC & Consent to Operate from the Board for residential and

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 4 of 55
commercial complex on total plot area 7,86,279 sq.mtrs. for total
construction BUA 10,31,879 sq.mtrs. on 09.02.2016 valid up to
30.10.2021.

Further, noted that STP of 780 KLD capacity has been provided. JVS
results are within consented limit. Biodegradable waste 1.4 Tones/Day is
sent for treatment at bio-digester plant provided by M/s Hiranadani
Developers.

In view of above, it was decided to grant Consent to 1st Operate for IT &
ITES activity by imposing the following conditions;
1. PP shall operate STP so as to achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit.
2. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air conditioning, cooling tower make up, fire-
fighting etc. and remaining shall be connected to the sewerage system
provided by local body.
3. PP shall operate organic waste digester along with composting facility
and compost obtained shall be used as manure in their own garden/
plantation.
4. PP shall furnish BG of Rs. 5 Lakh towards O&M of pollution control
systems and towards compliance of the Consent conditions.
5. Both the Occupier i.e. M/s TATA Consultancy Services Ltd. and
developer i.e. M/s Roma Builders Pvt. Ltd., (Hiranandani Estate) are
jointly and severally responsible for Operation & Maintenance of
Pollution control system, so as to achieve standard prescribed by the
Board or under EP Act, 1986. In case of failure of Pollution control
system, both parties will be held responsible and liable for necessary
legal action.
Consent shall be issued after obtaining additional Consent fees, if any.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 5 of 55
7 MPCB- Technocraft Approved Up to Committee noted that PP has applied for consent to Establish for
CONSENT- Industries (India) Ltd. commissioning expansion for the additional production qty.
(Garment Division) Consent to of the unit or 5
0000036050
Establish for Also noted that SRO’s compliance report with respect to the conditional
S. no. 374- years period
expansion. whichever is direction dated 08.08.2017 issued to the industry including installation of
376,389,415,407-408
Dhanivli, Murbad earlier. new ETP of capacity 1000 m3/ Day consisting of RO and MEE and STP of
Murbad capacity of 100 m3/ Day.

Committee however noted that SRO has reported that sewage is still
being stored in soak pits.

In view of above, it was decided to grant Consent to establish for


expansion by imposing following conditions;

1. Industry shall submit bank Guarantee of Rs. 5.0 Lakhs in the Board
towards compliances of the consent conditions.

2. Industry shall comply the conditional direction issued by the Board


vide dated 08.08.2017.

Consent shall be issued after receipt of direction compliance from SRO


and submission of additional requisite consent fee, if any.

8 MPCB- Netmagic IT Services NOT APPROVED ---- It was decided to issue final refusal due to following non compliances.
CONSENT- Pvt. Ltd., Lighthall ‘C’
Wing, Hiranandani Renewal of 1. Not obtain consent for the building having BUA 26,124 Sq. Mtrs in
0000037457
Business Park, Consent which IT and ITES activity is in operation.
Sakivihar Road, 2. Not furnished BG of Rs.2.0 Lakhs as per consent condition.
3. Not paid consent fees from year 2015 considering capital investment
Chandivali, Mumbai-
400 072. Rs.669.48 Crs.

PP shall refer the matter to SEIAA regarding applicability of Environmental


Clearance for DG set which is having capacity more than 5 KVA. i.e.(24
KVA)

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 6 of 55
9 MPCB- GKN Sinter Metals APPROVED Up to Committee noted the compliance verification report submitted by RO,
CONSENT- Private Ltd. Ployt No. 28.02.2023 Nashik regarding compliance of consent conditions. Since Industry has not
0000038815 C-18, MIDC Renewal of started expansion activity.
Ahmednagar, consent to
Ahmednagar operate No new or additional copper scrap melting induction furnaces were
observed and not carried out expansion in the production activity

it was decided to grant renewal of consent to operate with increase in CI


by imposing following conditions;

1. Industry shall extend the BG of Rs. 5 lakh obtained towards O&M of


pollution control system.
2. Industry shall apply separately for Consent to Establish for propose
expansion, if any.

Consent shall be issued after submission of additional requisite consent


fee, if any.
10 MPCB- M/s. Technocraft Approved Up to Committee noted that industry has applied for renewal of consent to
CONSENT- Industries (India) Ltd. 31.01.2023. operate. Also noted that compliance report submitted by SRO with
Renewal of
0000038639 (Garment Division) respect to conditional direction issued to the industry 08.08.2017.
Consent to
operate. Committee also noted the steps taken by the industry towards stoppage
discharge and connectivity of sewage sewerage system to STP, installed
new ETP of capacity of 1000 CMD including RO and MEE. Committee
however noted that SRO has reported that sewage is still being stored in
soak pits.

In view of above, it was decided to grant renewal of Consent to operate


by imposing following conditions;
1. Industry shall ensure full compliance with the directions dated
08.08.2017.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 7 of 55
2. Industry shall submit bank Guarantee of Rs. 5.0 Lakhs in the Board
towards operation and maintenance of pollution control system to
achieve consented standards.
3. Industry shall shift location of online monitoring system at appropriate
place within a week time.

Consent shall be issued after submission of additional requisite consent


fee, if any.

11 MPCB- Bharati Vidyapeeth Approved Up to Committee noted that PP has submitted information regarding increase
CONSENT- Medical Foundations 31.03.2021. in BUA from 13940 to 16250 sq.mtrs due to construction of new
0000039825 Bharati Hospital And Renewal laboratory, increase in CI of Rs. 13.39 due to purchase of new medical
Combine Consent equipment’s, undertaking submitted about BUA, qty of effluent
Research Centre
and BMW
generation, details of STP, Details of BMW generation etc.
Authorization
In view of above, it was decided to grant renewal of Combine Consent and
BMW Authorization for 831 beded hospital by imposing following
conditions;

1. PP shall submit BG’s as per the regime of HCS.

Consent shall be issued after receipt of copy of OC and submission of


additional requisite consent fee, if any.

12 MPCB- P. S. Steel Tubes Ltd APPROVED Up to Committee noted that industry has obtained the temporary permission
CONSENT- S.NO. 644(A), 644(B), 30.06.2019 from Irrigation department for use of raw water 20,000 Lit/day from river
0000040117 660, 661, 685, 686, Renewal of Patalganga for the period up to 30.06.2019.
687, 688, 689, 690, consent
691, 694/3, Village In view of above, it was decided to grant renewal of consent to operate
Khanav, Tal- Khalapur, for short period upto 30.06.2019, since industry has temporary
Raigad. permission from Irrigation department for the period upto 30.06.2019 by
imposing following conditions;

1. Industry shall submit the BG of Rs. 5 lakh towards O&M of pollution


control system.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 8 of 55
2. Forfeited the BG of Rs. 5 lakh obtained toward not to use ground water
for industrial purpose till they obtain NOC from CGWA. However,
industry fail to obtain the NOC from CGWA and obtain the temporary
permission from Irrigation department on 11.10.2018.

It was also decided to extend the validity of consent up to five years, if


industry obtain NOC from CGWA/ Irrigation department for further period
before expiry of the consent.

13 MPCB- R R Mega City Builders APPROVED Up to Committee noted the reply submitted by PP, provision of STP of 200 CMD
CONSENT- Ltd., S.No. 221/2, 30/06/2020. capacity, composting facility of 500 Kg/Day and provision of CMS etc.
222/1, 222/4, Consent to 1st
0000044175
222/5/1(P), Operate (part) In view above, It was decided to grant Consent to 1st Operate for Phase-I
construction on plot area 1,20,596 sq.mtrs. and BUA of 57,650.01 sq.mtrs.
222/5/2(P), 223/1,
223/2, 223/3, 223/4, subject to the following conditions;
223/5, 224/1 & others, 1. PP shall submit undertaking in Board’s prescribed format within 15
Hinjewadi village, Tal. days towards compliance of conditions of Environmental Clearance
Mulshi, Dist. Pune. (EC) and Consent to Operate conditions.
2. PP shall submit the undertaking within 15 days in the prescribed
format towards the part of the built up area/ building for which
application for 1st Consent to Operate (Part) is made and that the
same is included in the Environmental Clearance accorded.
3. PP shall operate STP so as to achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit.
4. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air conditioning, cooling tower make up, fire-
fighting etc. and remaining shall be utilized on land for gardening.
5. PP shall operate organic waste digester along with composting facility
and compost obtained shall be used as manure in their own garden/
plantation.
6. PP shall submit BG of Rs. 25 Lakhs towards O&M of pollution control
system and compliance of consent to operate condition.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 9 of 55
7. PP will be responsible for proper operation & maintenance of
pollution control systems for initial period of five years after Society
formation and afterwards handover the facility to the Society for its
further operation in good and working conditions.

Consent shall be issued after verification of arrangements for disposal of


treated sewage and after obtaining additional Consent fees, if any.

14 MPCB- National Peroxide Ltd., APPROVED Up to Committee noted the reply of PP as report of SRO about effluent
CONSENT- NRC Road, P.O. commissioning management and proposal towards obtaining ZLD from proposed
Mohone, Village Consent to or 5 year
0000044605 expansion activity.
Establish for
Vadavali, Kalyan, Dist. whichever is
Thane – 421 102. proposed earlier In view of above, It was decided to grant of Consent to Establish for
expansion proposed expansion for increase in the production quantity of Hydrogen
Peroxide (100% WW) by 3,400 MT/M & Compressed Hydrogen Gas by
86,250 Nm3/D by imposing the following conditions;

1. Industry shall upgrade existing ETP by providing RO, Volute De-


watering Unit & Spin Flash Dryer so as achieve ZLD for proposed
expansion.
2. PP shall extend existing B.G. of Rs. 5 Lakh (obtained for installation of
STP) towards compliance of the Consent to Establish conditions.

15 MPCB- INDAPUR DAIRY & Approved Up to Committee noted that Industry has submitted application for consent to
CONSENT- MILK PRODUCTS LTD. commissioning Establish for expansion for additional production qty with increase in CI.
0000046159 (At/ Post- Gokhali Consent to of the unit or 5 The analysis results of JVS of existing unit are within consented standards.
(Indapur- Baramati Establish for years period
Road) TalIndapur, expansion. whichever is Also noted that industry has proposed to provide new ETP for the
additional industrial effluent, combine STP for additional domestic
Dist- Pune 413106) earlier.
effluent and also provided APCS to the boiler which will be used for
additional production qty.

In view of above, it was decided to grant Consent to establish for


expansion by imposing following conditions;

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 10 of 55
1. Industry shall reuse treated effluent for utility purpose and remaining
on 92 Acers of own land for irrigation purpose scientifically so that no
discharge shall be there in nearby nalla /river.

2. To submit undertaking that they will not consume/ use ground water
and submit the NOC from irrigation department for use of raw water
at the time of operation.

3. Industry shall submit bank Guarantee of Rs. 5.0 Lakhs in the Board
towards compliances of the consent conditions.

Consent shall be issued after submission of additional requisite consent


fee, if any.

16 MPCB- Angre Port Private Not Approved --- Committee noted that PP has applied for renewal of consent to operate
CONSENT- Limited (Sande Lavgan for jetty for handling of all classes of dry bulk cargo, all classes of liquid
Renewal of
0000046134 Village) At post: bulk cargo, all classes of break bulk cargo & containerized cargo etc.
Sande, Lavgan,Tal & consent to (without ship breaking activities) .
Dist: Ratnagiri. operate
Committee also noted the following points:

1. PP has obtained EC for developing a cargo handling facility at Jaigad,


Dist: Ratanagiri in the name of M/s Jaigad Forts Infrastructure Ltd for
development of cargo handling facility.
2. PP has obtained certificate of incorporation for change in name of
Angre Port Private Limited on 12.03.2012.
3. PP has submitted request letter dated 19.11.2018 informing that PP
has approached to the MOEF for change in name and inclusion of
material and qty to be handled at this jetty. The application was
discussed in the 35th meeting of MOEF of EAC dated 29,31/10/2018. In
this meeting change in name was approved and MOEF committee was
of view that at this point defining the material to be handled will not

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 11 of 55
possible because MOEF have already allowed in Environmental
Clearance and has directed to SPCB to mention it in consent to operate.
4. PP has requested to incorporate material and qty to be handled at this
jetty.

In view of above, it was decided to call PP for presentation on dust


suppression system, product and qty to be handled, initiative to be taken
for developing green port, parking facility, rain water harvesting,
plantation along approach road etc.

17 MPCB- Godrej & Boyce Mfg. APPROVED Up to Committee noted the reply submitted by the industry stating that ETP and
CONSENT- Co. Ltd. Godrej & 31.12.2019 STP work has been completed and industry is in position to start
0000045995 Boyce Mfg. Co. Ltd. at 1st Consent to production activities with necessary machinery setup at site. Committee
South side of Khalapur Operate (part)
also noted the compliance report by the Board Official about readiness of
Pen Road, Village
Vadval & Tambati, ETP-2000 m3/Day and STP -600 m3/Day capacity.
Raigad
In view of above, it was decided to grant 1st consent to operate (part) by
imposing following conditions

1. Industry shall submit the BG of Rs. 5 lakh towards O&M of pollution


control system

Consent shall be issued after submission of additional requisite consent


fee.

18 MPCB- R.M. Bhutter, C.S.No. APPROVED Up to It was decided to grant re-validation of Consent to Establish for
CONSENT- 163, 1/183, 181(part), commissioning redevelopment of residential complex on total plot area 67,091 sq.mtrs.
Re-validation of
0000043155 182, 161 & 1/161 at of the unit or for total construction BUA 3,72,930 sq.mtrs. having 2 buildings A & B
Parel Sewri Division, Consent to up to including MCGM car parking with built up area 2,28,105 sq.mtrs. by
Mumbai. Establish 01/02/2020 imposing the following conditions;
whichever is
earlier. 1. PP shall provide STP so as to achieve the treated domestic effluent
standard for the parameter BOD-10 mg/lit.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 12 of 55
2. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air conditioning, cooling tower make up,
firefighting etc. and remaining shall be utilized on land for gardening.

3. PP shall install online monitoring system for BOD, TSS and flow at the
outlet of STP with connectivity to MPCB Server.

4. PP shall install organic waste digester along with composting facility/


bio-digester (biogas) with

composting facility for the treatment of wet garbage.


5. PP shall obtain NOC from MCGM for disposal of construction debris
at specific site inspected and approved by Municipal Corporation.
6. PP shall extend/submit BG of Rs. 25 Lakhs towards compliance of EC
and consent to establish condition.
7. Consent shall be issued subject to any further order may be passed
by the Hon’ble Supreme Court of India in special leave petition Civil
No. D23708/2017.

19 MPCB- M/s Maharashtra Approved Up to Committee noted that industry has submitted application for consent to
CONSENT- Cement Plant (A unit commissioning Establish for clinker grinding unit.
of Shree Cement Ltd.) Establish for of the unit or 5
0000049566
near Patas railway expansion .i.e years period Also noted that PP has obtained consent to Establish for the
station),Gut additional whichever is manufacturing of the Cement- 5.5 MT/A by grinding and mixing process
No.(village Kangaon- production qty on 30.06.2017. Industry proposes to provide adequate capacity of STP,
earlier.
672,677,-681 & 683 ETP, air pollution control system in the form of bag house to cement mill
and Patas-733) Near with stack height of 42 mtrs.
patas railway station In view of above it was decided to grant consent to Establish for cement
,village Patas & manufacturing (Clinker grinding Unit) with Environmental Clearance
Kangaon, Taluka condition and by imposing following conditions:
Daund,District

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 13 of 55
Pune,Maharashtra 1. Industry shall not carry out any activities before obtaining
Daund Environmental Clearance.

2. Submission of BG of Rs.25.0 Lakhs towards compliances of consent


conditions.

Consent shall be issued after obtaining additional consent fees from the
PP, if any.

20 MPCB- Ghatge Patil Industries APPROVED Up to It was decided to grant Consent to Establish for expansion for
CONSENT- Ltd. Plant-2, Plot No. commissioning ENGINEERING INDUSTRIAL ACTIVITY OF MACHINING & PATTERN SHOP by
0000050325 D-2, Kagal- Consent to or 5 year imposing following conditions;
Hatkanagale Industrial Establish for whichever is
1. Industry shall not increase the total production capacity as mentioned
Area, Kolhapur expansion earlier.
in Environmental Clearance and existing consent i.e. 6000 MT/M at
any given time and submit the undertaking for the same.
2. Industry shall upgrade the existing ETP so as to cater the effluent load
generated from expansion activity to meet the consented norms.

21 MPCB- JSW Jaigarh Port Approved Up to Committee noted that PP has submitted application for Revalidation of
CONSENT- Limited., Village: commissioning the consent to Establish for the construction of reaming berths for
0000050903 Jaigarh, Survey Re- Validation of of the unit or handling of cargos i.e. part of 4A, 4B, 5A and 5B. And PP has obtained
No.22,24,25,26,27,28, consent to up to Consent to Establish for the port activity on 31.08.2013.
29,30,31-40,42-46. Establish 19.12.2020.
Committee also noted that PP has obtained EC on 19.12.2013 for the port
Jaigarh Ratnagiri
activity and handling of cargos.

In view of above it was decided to grant Re-validation of consent to


Establish for development / construction of remaining berths up to
19.12.2020. by imposing following condition:

1. PP shall commission STP within 3 months and BG of Rs.5.0 Lakhs


towards compliance of the same.
2. PP shall submit BG of Rs.5.0 lakhs towards compliances of consent
conditions.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 14 of 55
3. PP shall submit initiative to be taken towards development of green
port.

22 MPCB- Reliance Industries Approved 30.11.2020. Committee noted that industry has applied for 1st consent to operate for
CONSENT- Limited , B4 , MIDC the vaporization unit and amalgamation of existing consent.
Industrial Area , 1st Consent to
0000047912
operate with Also noted that PP has obtained consent to Establish for the vaporization
Patalganga ( Coal Fired
Dow Vapourisers ) amalgamation of unit which is valid and also having existing consent validity up to
consent 30.11.2020.

1. There will not be increase in water consumption and effluent


generation.
2. Industry has installed ESP's as a APCS to the vaporization unit.

In view of above, it was decided to grant 1st consent to operate with


amalgamation of existing consent by imposing following condition.

1. Industry shall dispose 100% Fly ash and Bottom ash to the Brick
manufacturer and submit quarterly status report in the Board.
2. Consent shall be issued only after verification report of SRO/RO
towards completion work of vaporization unit.

23 MPCB- INDAPUR DAIRY & Approved 30.04.2023. Committee noted that industry has submitted application for renewal of
CONSENT- MILK PRODUCTS LTD. consent to operate for the same products and qty with increase in CI.
0000048919 (At/ Post- Gokhali Renewal of Industry has provided ETP and STP for the treatment of industrial and
(Indapur- Baramati consent to domestic effluent. Analysis results of ETP outlets are within limits. Also
Road) TalIndapur, operate
industry has provided dust collector to boiler.
Dist- Pune 413106)
In view of above it was decided to grant renewal of consent to operate by
imposing following condition:

1. Industry shall submit justification about increase in CI within one


month and submit BG of Rs.2.0 Lakhs towards compliance of the same.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 15 of 55
2. Industry shall extend all the existing BGs for the period up to
31.08.2023.
3. Industry shall submit NOC of CGWA within 3 months and submit BG of
Rs.5.0 Lakhs towards compliance of the same.

Consent shall be issued after receipt of verification report from SRO about
status of constructed wall between ETP and Talav, and after receipt of
additional consent fees from industry, if any.

24 MPCB- M/s. Reliance Life Approved Up to Committee noted that industry has applied for C to E for increase in
CONSENT- Sciences Pvt. Ltd. (R- commissioning production quantity of Monoclonal Antibodies products from 50 Kg/M to
Consent to
0000050973 282, TTC Industrial of the unit or 5 150 Kg/M. The industrial effluent and domestic effluent generated from
Area, MIDC) Plot No. Establish for years period this new activity will be treated in the existing ETP and STP. The analysis
R-282 TTC Industrial additional which is a results of JVS of existing unit are within consented limit. Industry has
area, MIDC Rabale production Qty
earlier. installed online monitoring system to ETP.
Navi Mumbai
In view of above, it was decided to grant consent to Establish for
additional production qty by imposing following condition:

1. Industry shall not take any effective steps prior to Environmental


Clearance and submit BG of Rs.25 Lakhs towards compliance of the
same.

Consent shall be issued after receipt additional consent fees from industry,
if any.

25 MPCB- Dighi Oil Storage Pvt. Approved 31.08.2023 Committee noted that PP has applied for renewal of consent for the same
CONSENT- Ltd. (Dighi Oil Storage storage activities in side Dighi port area. i.e for Storage & Handling of A,
Pvt. Ltd, Dighi Port, Renewal of B, C Chemicals, POL Products and Non Hazardous liquid like Edible Oil. PP
0000051453
consent to
Taluka : Shrivardhan, has provided ETP for treatment of industrial effluent.
Dist: Raigad, operate
Maharashtra,) In view of above it was decided to grant renewal of consent to operate by
imposing following conditions:

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 16 of 55
1. PP shall provide absorption system to the storage tanks vent and
monitoring system for volatile substances and submit BG of Rs.10.0
Lakhs towards compliance of the same till that period PP shall not store
volatile substances /Chemicals.

Consent shall be issued after receipt additional consent fees from


industry, if any.

26 MPCB- Raymond Limited Approved 31.01.2023. Committee noted that industry has applied for renewal of consent with
CONSENT- (PLOT NO.-E-1/11, increase in CI. Industry has provided ETP. The treated 60% effluent recycle
MIDC AREA, AJANTA Renewal of in the process and remaining used on land for irrigation purpose. The
0000051354
consent to
ROAD, JALGAON) multi cyclone dust collector followed by common bag filter is provided to
operate. both the boilers
Plot No.-E-1/11 MIDC
Area, Jalgaon Jalgaon In view of above it was decided to grant renewal of consent to operate by
imposing following conditions:

1. Forfeiture of BG of Rs.2.5 Lakhs towards exceeding the JVS and top up


of 5.0 Lakhs hence to make total BG of Rs.12.5 lakhs towards O & M of
pollution control systems.
2. Submission of justification about increase in CI within one month in
the Board

Consent shall be issued after receipt of additional consent fees if any.

27 MPCB- Minda Corporation APPROVED 31.03.2019 The existing consent to operate is granted under orange category by
CONSENT- Limited, Plot No- D- Regional Officer, Pune to manufacture Cars & Motorcycle Parts &
0000048119 227/1, D-226 & D-227, Consent to Accessories with casting activity- 5500 MT/A.
Village- Bhamboli Establish for
Chakan Industrial powder Coating It was decided to grant Consent to Establish for powder Coating activity
Area, Khed, Pune. activity . under Red category by imposing following conditions;

1. Industry shall submit the BG of Rs. 5 lakh towards O&M of pollution


control system.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 17 of 55
2. Industry shall not operate powder coating activity prior to consent to
operate from the Board.

3. Industry shall submit Board Resolution within one month in prescribed


format from company Board towards installation of plant and
machineries for powder coating activity without obtaining consent
from the Board thus violated the provisions of Environmental Laws
and in future, they will not do such violations submit the BG of Rs. 2
lakh.

Consent shall be issued after submission of additional requisite consent


fee, if any.

28 MPCB- Acme Housing India APPROVED Up to It was decided to grant Consent to 1st Operate (Part-I) for residential cum
CONSENT- Pvt. Ltd. “ACME 30.11.2020. commercial project on total plot area 54,500 sq.mtrs. for construction
0000052260 OZONE”, Gut No. Consent to 1st BUA 20,284.23 sq.mtrs. out of total construction BUA of 2,89,855.22
Operate (Part-I) sq.mtrs. by imposing the following condition;
61/1, 61/2, Off Glady
Alwares Road, 1. PP shall submit undertaking in Board’s prescribed format within 15
Pokharan Road No. 2, days towards compliance of conditions of Environmental Clearance
Manpada, Thane (W). (EC) and Consent to Establish conditions.
2. PP shall submit the undertaking within 15 days in the prescribed
format towards the part of the built up area/ building for which
application for 1st Consent to Operate (Part) is made and that the
same is included in the Environmental Clearance accorded.
3. PP shall operate STP so as to achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit.
4. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air conditioning, cooling tower make up, fire-
fighting etc. and remaining shall be utilized on land for gardening.
5. PP shall operate organic waste digester along with composting facility
and compost obtained shall be used as manure in their own garden/
plantation.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 18 of 55
6. PP shall submit BG of Rs. 25 Lakhs towards O&M of pollution control
system and compliance of consent to operate condition.
7. PP will be responsible for proper operation & maintenance of
pollution control systems for initial period of five years after Society
formation and afterwards handover the facility to the Society for its
further operation in good and working conditions.

Consent shall be issued after-

1. Obtaining Certificate from Architect regarding completion of


construction of BUA for which they have applied for 1st Consent to
Operate.
2. Obtaining verification report of SRO towards installation of online
monitoring system for the parameters flow, BOD, TSS at the outlet of
STP and its connectivity to the MPCB Server.
3. Obtaining additional Consent fee, if any.

29 MPCB- Indian oil Corporation APPROVED Up to It was decided to grant Consent to 1st Operate for 3 nos. of additional
CONSENT- Limited, Gut No. 30/06/2023. tanks (2 for Ethanol and 1 for Bio-Diesel) and amalgamation with existing
Consent to 1st
0000052530 338/1, A/p- Akolner, C to O by imposing the following conditions;
Tal. & Dist. Operate for
Ahmednagar. expansion & 1. Industry shall store all 'A' Class Petroleum Products in floating roof
amalgamation with double seal.
with existing 2. Industry shall obtain re-validation of permission obtained from
Consent Petroleum & Explosive Safety Organization (PESO).
3. Industry shall use vapour balancing trucks for transportation of
Petroleum Products.
4. Truck filling bays shall be equipped with vapour collection and
treatment system.
5. Industry shall maintain existing BG of Rs. 5 Lakh towards O&M of
pollution control systems and towards compliance of the Consent &
EC conditions.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 19 of 55
30 MPCB- Kalpataru Gardens Pvt. APPROVED Up to It was decided to grant re-validation of Consent to Establish for
CONSENT- Ltd., CTS No. 283A, commissioning construction of residential tower “Kalpataru Crest” on total plot area
283B to 283C, at LBS Re-validation of or up to 17,408.8 sq.mtrs. for remaining construction BUA - 1,360.176 sq.mtrs. out
0000005197
Consent to
Marg, Village Bhandup 18/07/2023 of total construction BUA - 85,199.77 sq.mtrs. by imposing the following
(W), Tal. Kurla, Establish for whichever is conditions;
Mumbai increase in BUA earlier.
from 82,921.36 1. PP shall provide STP so as to achieve the treated domestic effluent
sq.mtrs. to standard for the parameter BOD-10 mg/lit.
85,199.77 sq. 2. The treated effluent shall be 60% recycled for secondary purposes
mtrs. such as toilet flushing, air conditioning, cooling tower make up,
firefighting etc. and remaining shall be utilized on land for gardening.
3. PP shall install online monitoring system for BOD, TSS and flow at the
outlet of STP with connectivity to MPCB Server.
4. PP shall install organic waste digester along with composting facility/
bio-digester (biogas) with composting facility for the treatment of
wet garbage.
5. PP shall obtain NOC from MCGM for disposal of construction debris
at specific site inspected and approved by Municipal Corporation.
6. PP shall not take effective steps towards construction BUA beyond
84,754.594 sq.mtrs. without obtaining amendment in EC.
7. PP shall not take effective steps towards construction after expiry of
EC on 08/04/2020 unless obtaining re-validation of EC.
8. PP shall extend/submit BG of Rs. 25 Lakhs towards compliance of EC
and consent to establish condition.
9. Consent shall be issued without prejudice to the order passed as may
be passed by the Hon’ble Supreme Court of India in special leave
petition Civil No. D23708/2017.

31 MPCB- Kanakia Spaces Realty APPROVED Up to It was decided to grant Consent to Establish for construction of
CONSENT- Pvt Ltd., C.T.S No. commissioning Residential Complex with Shops on total plot area 11,500.6 sq.mtrs. for
1015, 1015/1 to 3 of Consent to or up to
0000052741
Village Kanjur, Establish 24/04/2022

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 20 of 55
Kanjurmarg (East) whichever is total construction BUA 46,730.03 sq.mtrs. by imposing the following
Mumbai - 400 042. earlier. conditions;

1. PP shall provide STP so as to achieve the treated domestic effluent


standard for the parameter BOD-10 mg/lit.
2. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air conditioning, cooling tower make up,
firefighting etc. and remaining shall be utilized on land for gardening.
3. PP shall install online monitoring system for BOD, TSS and flow at the
outlet of STP with connectivity to MPCB Server.
4. PP shall install organic waste digester along with composting facility/
bio-digester (biogas) with composting facility for the treatment of
wet garbage.
5. PP shall obtain NOC from MCGM for disposal of construction debris
at specific site inspected and approved by Municipal Corporation.
6. PP shall extend/submit BG of Rs. 25 Lakhs towards compliance of EC
and consent to establish condition.
7. Consent shall be issued without prejudice to the order passed as may
be passed by the Hon’ble Supreme Court of India in special leave
petition Civil No. D23708/2017.

32 MPCB- Nirmal Lifestyle City, NOT APPROVED -- Committee noted that PP has not re-validated Consent to Establish and
CONSENT- Victory A, Victory B also not re-validated Environmental Clearance.
0000052515 and Spirit A, S. Nos. Consent to
Also, noted that installation work of STP is not completed and OWC is not
94/10 , 94/9/1,9/2, Operate (Part)
installed.
94/8, 94/7, 9/2, 93/8,
68/5, 68/6, 96/15, Further noted that PP has not submitted details of BG, details of sewage
96/2 pt, 96/13, 95/pt, generation.
92/10, 92/9, 92/15,
Vadawali Village, In view of above, it was decided to defer the case and call the PP for
Kalyan, Dist. Thane. presentation before CAC along with explanation for above non-
compliances.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 21 of 55
33 MPCB- M/s. Housing APPROVED Up to It was decided to grant Consent to 1st Operate (Part-II) for construction
CONSENT- Development & 30.11.2019. BUA of 80,387.42 sq.mtrs. and amalgamation with existing Consent to
Infrastructure Ltd., Consent to 1st Operate (Part-I) for Rental Housing Scheme Project on total plot area
0000052051
Operate (Part-II), 6,17,264.07 sq.mtrs. for construction BUA 7,10,080.59 sq.mtrs. (Renewal
S.No.146(148) &
renewal of of Part-I: 6,29,693.17 sq.mtrs. + 1st C to O of Part-II: 80,387.42 sq.mtrs.)
Others, Village Bolinj, out of total construction BUA 11,13,791.31 sq.mtrs. by imposing the
Dongri & Chikal Consent to
following condition;
Dongri, Tal. Vasai, Dist. Operate (Part-I)
and 1. PP shall not take further effective steps towards construction till
Palghar.
amalgamation obtaining re-validation of Environment Clearance from the Competent
Authority.
AND 2. PP shall submit undertaking in Board’s prescribed format within 15
days towards compliance of Environmental Clearance (EC) and
Re-validation of Consent to Operate conditions.
Consent to 3. PP shall submit the undertaking within 15 days in the prescribed
Establish for format regarding the part of built up area/ building for which
remaining BUA application for 1st Consent to Operate (part-II) is made and that the
same is included in the Environmental Clearance accorded.
4. PP shall operate STP so as to achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit.
5. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air conditioning, cooling tower make up,
firefighting etc. and remaining shall be utilized on land for gardening.
6. PP shall operate organic waste digester along with composting facility
and compost obtained shall be used as manure in their own garden/
plantation.
7. PP will be responsible for proper operation & maintenance of
pollution control systems for initial period of five years after Society
formation and afterward handover the facility to the Society for its
further operation in good and working conditions.

Consent shall be issued after-

1. Obtaining Architect Certificate towards completion of construction of


BUA for which they have applied for 1st Consent to Operate (part- II)

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 22 of 55
2. Obtaining verification report of SRO towards installation of online
monitoring system for the parameters flow, BOD, TSS at the outlet of
STP and its connectivity to the MPCB Server
3. Obtaining additional Consent fees, if any

Regarding Re-validation of Consent to Establish

It was decided to grant of re-validation of Consent to Establish for Rental


Housing Scheme Project on total plot area 6,17,264.07 sq.mtrs. for
remaining construction BUA of 4,03,710.72 sq.mtrs. out of total
construction BUA of 11,13,791.31 sq.mtrs. by imposing the following
condition;

1. PP shall not take further effective steps towards construction till


obtaining re-validation of Environment Clearance from the
Competent Authority.
2. PP shall provide adequate capacity of sewage treatment plant so as
to achieve treated domestic effluent standard for the parameter
BOD- 10 mg/lit.
3. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air-conditioning, cooling tower make up,
firefighting etc. and remaining shall be utilized on land for gardening.
4. PP shall install online monitoring system for BOD, TSS and flow at the
outlet of STP.
5. PP shall install organic waste digester along with composting facility/
bio-digester (biogas) with composting facility for the treatment of
wet garbage.
6. PP shall submit BG of Rs. 25 Lakhs towards compliance of EC and
consent to establish condition.

Consent shall be issued after submission of Consent to Establish re-


validation fees as per C.I. for remaining BUA area.

34 MPCB- Hubtown Ltd., Survey APPROVED Up to It was decided to grant of re-validation of Consent to Establish with
CONSENT- Nos. 215/1,2,3,5,6, Commissioning expansion for construction of MMRDA rental housing scheme on total
0000016379 215/2/1,3,4,5,6, Re-validation of of the project
216/1,2,3, 218, of Consent to or up to

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 23 of 55
village Majiwade, Establish with 26.9.2020 plot area 35,050 sq.mtrs. for total construction BUA 1,26,552.19 sq.mtrs.
Thane (w). Thane. expansion whichever is in the name of M/s. Hubtown Ltd. by imposing the following conditions;
earlier
1. PP shall comply conditions stipulated in EC accorded by Env. Dept.,
GoM dated 31.5.2014.
2. PP shall provide adequate capacity of sewage treatment plant so as
to achieve treated domestic effluent standard for the parameter
BOD- 10 mg/lit.
3. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air conditioning, cooling tower make up,
firefighting etc. and remaining shall be utilized on land for gardening.
4. PP shall install online monitoring system for BOD, TSS and flow at the
outlet of STP with connectivity to MPCB Server.
5. PP shall install organic waste digester along with composting facility/
bio-digester (biogas) with composting facility to treat the
biodegradable MSW.
6. PP shall submit BG of Rs. 25 Lakhs towards compliance of EC and
Consent to Establish condition

35 MPCB- Man Vastucon LLP, Not APPROVED ---- It was decided to defer the case for Consent to Establish for construction
CONSENT- Old S.No. 92/1, New of residential cum commercial project on total plot area 71,651.0 sq.mtrs.
0000004811 13/1 & S.No. 260pt, Consent to for total construction BUA 4,28,872.02 sq.mtrs. as PP has failed to obtain
Establish for NOC of NBWL as the site is located adjacent to Sanjay Gandhi National
New 12pt, S.No. 85,
expansion Park, Ecologically sensitive zone.

PP shall not take effective steps without obtaining EC from the Competent
Authority and NOC of NBWL.

36 MPCB- M/s. JSW Not Approved ----- Committee noted that PP has applied for Re validation of the consent to
CONSENT- Infrastructure Limited, Revalidation of Establish. PP has obtained Consent to Establish from the Board on
0000050466 consent to 10.07.2013 and PP has obtained EC for “all weather Greenfield Jetty" at
Nandgaon village
Establish
Village Nandgaon,

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 24 of 55
Tal:Palghar, Nandgaon of Taluka Palghar, Dist: Thane by M/s JSW Infrastructure Ltd on
Dist:Thane. 09.02.2016.PP has not started civil work yet.

Committee also noted that there are four cases were filed against this
project in National Green Tribunal, (Western Zone) Pune, vide Appeal No.
11/2016 Smt. vidhi Vidyut More & Anr Vs. MoEFCC & Ors., 13/2016 M/s.
Hind Kesaree Shramik Sena & Others Vs. MoEFCC & Others, 15/2016
Akash Suresh More & Anr. Vs. MoEFCC & Ors, 16/2016 Thane Zilha
Machhimar Madhyavarti Sahakari Sangh Maryadit & Ors. Vs. Union of
India & Ors. for challenging EC issued to project. The matter is subjudice.

In view of above it was decided to call PP for the presentation along with
present status of above refer cases related to this project.

37 MPCB- Pudumjee Paper NOT APPROVED ---- Committee noted that industry has submitted application for consent to
CONSENT- Products Ltd. Consent to establish for the new production of coated paper product. Industry has
0000053121 (Thergaon, Establish for obtained consent to the existing production which is valid up to
Chinchwad, Pune - expansion 30.06.2021.
33.) 25, 26, 29, 30 and
33 Thergaon, Pune - Committee also noted the following points:
33 Mulshi 1. There will be no use of additional water consumption and effluent
generation from the proposed production.
2. Industry has proposed to install thermic fluid heater to the paper
coating machine and propose to install stack of 30 Meters.
3. Committee however noted persistent exceedance of BOD in treated
effluent.

In view of above it was decided to defer the case due to towards


exceedance of BOD parameter. Also it was decided to obtain action plan
along with compliances of the conditions stipulated in consent to operate
from the PP and resubmit in next CAC along with all above details

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 25 of 55
38 MPCB- Indian Oil Corporation APPROVED Up to It was decided to grant Consent to 1st Operate for 3 nos. of additional
CONSENT- Limited (Marketing 31/12/2022. tanks (2 for Ethanol and 1 for Bio-Diesel), renewal of Consent to Operate
Division), Solapur Consent to 1st (Application UAN No. 0000035559) and amalgamation with Consent by
0000052537
Operate for
Depot, Pakani, Near imposing the following conditions;
Pakani Railway expansion &
Station, North Solapur. amalgamation 1. Industry shall store all 'A' Class Petroleum Products in floating roof with
with existing double seal.
Consent 5. Industry shall obtain re-validation of permission obtained from
Petroleum & Explosive Safety Organization (PESO).
6. Industry shall use vapour balancing trucks for transportation of
Petroleum Products.
7. Truck filling bays shall be equipped with vapour collection and
treatment system.
8. Industry shall maintain existing BG of Rs. 5 Lakh towards O&M of
pollution control systems and towards compliance of the Consent &
EC conditions.

39 MPCB- Indian Oil Corporation APPROVED Up to It was decided to grant Consent to 1st Operate for 3 nos. of additional
CONSENT- Limited (Storage), 30/06/2021. tanks (2 for Ethanol and 1 for Bio-Diesel), amendment in existing Consent
0000053723 Manmad- Nandgaon Consent to 1st to Operate for reduction in tank storage capacity by 520 KL i.e. from
Road, Panewadi Operate for 22,940 KL to 22,420 KL and amalgamation with existing Consent by
Terminal, Vill- expansion & imposing the following conditions;
Nagapur Nandgaon, amalgamation
with existing 1. Industry shall store all 'A' Class Petroleum Products in floating roof
Nashik.
Consent with double seal.
2. Industry shall obtain re-validation of permission obtained from
Petroleum & Explosive Safety Organization (PESO).
3. Industry shall use vapour balancing trucks for transportation of
Petroleum Products.
4. Truck filling bays shall be equipped with vapour collection and
treatment system.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 26 of 55
5. Industry shall maintain existing BG of Rs. 5 Lakh towards O&M of
pollution control systems and towards compliance of the Consent &
EC conditions.

40 MPCB- M/s. DAIRY POWER Approved Up to Committee noted that PP has applied for consent to Establish for Milk
CONSENT- LTD. (Gat No. 555, At commissioning processing and dairy products at additional Vinchur industrial Area Taluka
Consent to
0000051571 Songaon, Post of the unit or 5 Niphad, Nashik. PP has proposed to provide ETP comprising of Primary
Saikheda, Tal. Niphad, Establish years period secondary and tertiary treatment system and and 100 CMD Treated
Dist. Nashik) whichever is effluent will be used for gardening and remaining 200 CMD disposed on
earlier adjacent farming land. PP has proposed to provide APCS to coal fired
boiler and stack to the DG set proposed.

In view of above it was decided to grant consent to Establish by imposing


following conditions:

1. 1st consent to operate will be issued after commissioning of ETP and


STP of the adequate capacity for the treatment of industrial /domestic
effluent.
2. Treated effluent shall be recycle up to maximum extent and remaining
shall used for land for gardening and plantation purpose on own and
on 32 Acres adjacent farming land. Also PP shall make bilateral
agreement with the farmers
3. To submit BG of Rs.5.0 Lakhs towards compliances of consent
conditions.

Consent shall be issued after receipt of additional consent fees if any.

41 MPCB- UPL Limited, Plot No. E APPROVED Up to Committee noted that PP has applied for Consent to Establish for
CONSENT- 51/1 &2, E-52, MIDC Commissiong of proposed expansion.
0000054563 Tarapur, Tal. & Dist. Consent to the unit or 5
Establish for Committee also noted that Board has issued Conditional directions to the
Palghar years period
expansion industry on 05.10.2018. Industry has complied these direction.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 27 of 55
whichever is In view above, it was decided to grant Consent to Establish for proposed
earlier. expansion by imposing the following conditions;

1. Industry shall not take effective steps towards expansion prior to


obtaining EC;
2. Industry shall comply with the conditional directions dtd. 05/10/2018.
3. Industry shall submit BG of Rs. 5 Lakh towards compliance of the
Consent to Establish.
4. Industry shall provide ZLD system to existing as well as proposed
expansion.

42 MPCB- Lupin Limited (Biotech APPROVED Up to It was decided to grant Consent to establish for proposed expansion in
CONSENT- Division), Gat No. Commissiong of existing unit at adjacent plots bearing Gat Nos. 1157, 1158 & 1159, Village
0000054108 1156 & 1156/1, Village Consent to the unit or 5 Ghotawade, Tal. Mulshi, Dist. Pune for manufacturing of biotech based
Ghotawade, Establish for years period product, formulation and R&D by imposing the following conditions;
Tal.Mulshi, Dist. Pune. expansion whichever is
1. Industry shall install full-fledged combined ETP for the treatment of
earlier.
trade/ domestic effluent from proposed expansion and 100% recycle/
reuse treated effluent into cooling tower & boiler feed so as to achieve
ZLD.
2. Industry obtain NOC/ Permission from the Concerned Authority for
water consumption for proposed expansion prior to commissioning.
3. Industry shall submit Bank Guarantee of Rs. 5 Lakh towards
compliance of the Consent to Establish conditions.

43 MPCB- JSW DHARAMTAR Approved Up to Committee noted that PP has applied for re validation of the consent to
CONSENT- PORT PVT LTD commissioning establish for commissioning of remaining expansion of the jetty for the
0000023048 (Dharamtar, Post: Re- validation of of the unit or length of 1023.5 Meters i.e. from 726.5 to 1750 Meters for the material
Consent to up to handling for captive purpose. PP has obtained consent to establish for the
Dolvi, Tal: Pen)
Establish 31.10.2022. expansion of the jetty for the material handling for captive purpose for
the length from 331.5 meters to 1750 meters which was valid up to
15.12.2016.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 28 of 55
Committee also noted the following points:

1. PP has obtained Environmental Clearance on 26.11.2015 for the


expansion of the jetty for the material handling for captive purpose -
35,00,00,000 MT/Year for the length from 331.5 meters to 1750
meters which was valid up to 15.12.2016.
2. PP has obtained 1st consent to operate for the expansion of the jetty
for the expansion of the jetty for the material handling for captive
purpose -21,90,000 MT/M for the length 726.5 Meters [ existing jetty
331.5 + expansion 395 meters which is valid up to 31.08.2019.
3. PP has provided STP for the domestic effluent.
4. PP has provided dust suppression system at the material handling area
of existing jetty. Analysis results of AAQM carried out near existing jetty
are within consented limits.

In view of above it was decided to grant re- validation of the consent to


establish for commissioning of remaining expansion of the jetty for the
length of 1023.5 Meters i.e. from 726.5 to 1750 Meters for the material
handling for captive purpose by imposing following conditions:

1. PP shall submit BG of Rs.5 Lakhs towards compliances of the consent


conditions.
2. PP Should be use this jetty for captive purpose of their steel plant.

Consent shall be issued after receipt of additional consent fees from PP.

44 MPCB- M/s. Godrej Industries APPROVED -- It was decided to grant amendment in Consent to Operate for the
CONSENT- Ltd., Plot No. N-73, following :
0000054931 Addnl. Ambernath, Amendment in
MIDC, Anand Nagar, Consent to 1. Use of alternate fuel Briquette-65 MT/D in Boiler,
Operate for use 2. Incorporation of 100% ZLD,
Dist. Thane – 421 506.
of alternate fuel 3. Incorporation of H.W. generated due to installation of ZLD
Briquette in a) MEE Salts-600 MT/A,

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 29 of 55
Boiler, inclusion b) Used R.O membrane-1.2 MT/A,
of 100% ZLD & c) Spent Carbon-1 MT/A,
HW & Non-HW 4. Incorporation of Hazardous/ Non-Hazardous waste - a) Glass wool- 5
generation MT/A, b) Filter Bags- 2 MT/A, c) Oil Filters/Oil Separators- 1 MT/A, d)
Briquette Ash- 10 MT/D, e) E-waste- 1 MT/A,
5. Increase in generation of by-product Glycerin from 7500 MT/A to
10800 MT/A,
6. Increase in generation of spent nickel catalyst from 50 MT/A to 85
MT/A.

45 MPCB- Newfound Properties NOT APPROVED ----- It was decided to defer the case for 1st Consent to Operate (Part-II) for
CONSENT- & Leasing Pvt. Ltd., building No. 1 & 3 on total plot area 2,37,860.23 sq. mtrs. for construction
Plot No. Gen 2/1/D, Consent to BUA 92,656 sq.mtrs. out of total construction BUA of 5,05,420.99 sq.mtrs.
0000053973
Operate (Part-II) till completion of STP.
Gen 2/1/E, Gen 2/1/F
in Trans Thane Creek for building No. 1
Industrial Area, MIDC, &3
Jui Nagar, Navi
Mumbai, Dist. Thane.

46 MPCB- Indian Oil Corporation APPROVED Up to It was decided to grant renewal of Consent to Operate for mfg. of
CONSENT- Limited, Specialty 31/08/2019. different grade (106 nos.) lube oils and coolant by blending and mixing
Lubes and Additive Renewal of only and filling in small containers, bulk containers etc. with total
0000055353
Consent production quantity of 1,500 KL/M by imposing the following conditions;
Complex, Plot No. T-
20, MIDC Taloja, Tal. 1. Industry shall furnish Bank Guarantee of Rs. 2 Lakh towards O & M of
Panvel, Dist. Raigad. pollution control systems.

Consent shall be issued after receipt of additional Consent to Establish


fees of Rs. 75,000/- towards difference in C.I. of Rs. 53.24 Crs.

47 MPCB- Hindustan Coca-Cola APPROVED Up to It was decided to grant Consent to Establish for proposed expansion by
CONSENT- Beverages Pvt. Ltd., Commissiong of imposing the following conditions;
0000049935 Gut No. 1107/8/33, the unit or 5
years period

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 30 of 55
Pirangut, Tal. Mulshi, Consent to whichever is 1. Industry shall provide full-fledged ETP & STP for proposed expansion
Dist. Pune. Establish for earlier. and maximum effluent recycle in the process and remaining shall be
expansion used on land for gardening.
2. Consent shall be issued after verification of arrangement for disposal
of treated effluent on land.

Industry shall furnish BG of Rs. 5.0 Lakh towards compliance of the


consent conditions.

48 MPCB- ETERNIS Fine APPROVED Up to It was decided to grant Consent to Establish for proposed expansion by
CONSENT- Chemicals Limited, Commissiong of imposing the following conditions;
Consent to
0000054544 Plot No. D9/1, D9/2, the unit or 5
D9/3 & D15, MIDC, Establish for years period 1. Industry shall provide full-fledged ETP & STP for proposed expansion
Kurkumbh, Tal. Daund, expansion whichever is so as to achieve 100% ZLD.
2. Industry shall install Web camera with night vision to ETP outlet as per
Dist. Pune. earlier.
CPCB guidelines with connectivity to CPCB & MPCB Servers.
3. Industry shall furnish BG of Rs. 10 Lakh towards compliance of the EC
& C to E conditions.

49 MPCB- KPIT R & D Centre, SEZ APPROVED Up to Committee noted that PP has obtained consent to operate for KPIT
CONSENT- Plot No. 17 KPIT Commissiong of software development park and existing unit is engaged in IT and IT
Technologies Software Consent to the unit or 5
0000055549 activities.
Establish (Part-II)
Development Park, years period
Rajiv Gandhi Infotech for expansion whichever is Now, PP has applied for grant of consent to Establish for R & D activity to
Park, MIDC Phase- III, earlier. manufacture prismatic pouch cell - 1,000 Nos/A.
Hinjawadi-Man, Tal. Also noted that effluent generation from proposed activity is Nil and
Mulshi, Dist. Pune. sewage generation will be @0.5 CMD which will be treated in existing STP
of capacity 200 CMD.

In view of above, it was decided to grant Consent to Establish for proposed


mfg. of prismatic pouch cell - 1,000 Nos/M in Red category by imposing
the following conditions;

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 31 of 55
1. PP shall extend existing BG of Rs. 10 Lakh towards compliance of the
EC & C to E conditions.

50 MPCB- M/s Gliders Buildcon APPROVED Up to It was decided to grant re-validation of Consent to Establish for proposed
CONSENT- LLP, CS No. 593, commissioning expansion of the Composite project with public parking on total plot area
Re-validation of
0000054894 Mazagaon Division, at or up to 58,197.97 sq.meter & construction BUA 3,22,543.97 sq. meter by
Rambhau Bhogle Consent to 10/12/2023 imposing the following conditions;
Marg, Byculla, Establish with whichever is
expansion 1. PP shall provide STP so as to achieve the treated domestic effluent
Mumbai. earlier.
standard for the parameter BOD-10 mg/lit.
2. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air conditioning, cooling tower make up,
firefighting etc. and remaining shall be utilized on land for gardening.
3. PP shall install online monitoring system for BOD, TSS and flow at the
outlet of STP with the connectivity to MPCB Server.
4. PP shall install organic waste digester along with composting
facility/biodigester (biogas) with composting facility for the
treatment of wet garbage.
6. PP shall obtain NOC from MCGM for disposal of construction debris
at specific site inspected and approved by Municipal Corporation.
7. Consent shall be issued without prejudice to the order passed as may
be passed by the Hon’ble Supreme Court of India in special leave
petition Civil No. D23708/2017.
8. PP shall submit BG of Rs. 25 Lakhs (including existing BG) towards
compliance of EC and consent to establish condition.

51 MPCB- Regency Nirman Ltd., APPROVED Commissioning It was decided to grant of Consent to Establish for construction of
CONSENT- 44/2, 47/1, 47/2Part, of the project residential cum commercial project on total plot area 1,31,190 sq.mtrs.
48, 49/1, 49/2, 50/1, Consent to or up to 5 year for total construction BUA 4,95,000 sq.mtrs. by imposing the following
0000049265
Establish conditions;
50/2, 50/3, 50/4, 50/5, whichever is
51/2A, 52/2, 54/1, 97, earlier.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 32 of 55
Near Suyog Hotel, 1. PP shall comply conditions stipulated in EC accorded by Env. Dept.,
Village Davadi, Kalyan GoM dated 07.08.2018.
Shil Road, Dombivali 2. PP shall provide adequate capacity of sewage treatment plant so as
to achieve treated domestic effluent standard for the parameter
(East), Kalyan, Dist.
BOD- 10 mg/lit.
Thane. 3. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air conditioning, cooling tower make up,
firefighting etc. and remaining shall be utilized on land for gardening.
4. PP shall install online monitoring system for BOD, TSS and flow at the
outlet of STP with connectivity to MPCB Server.
5. PP shall install organic waste digester along with composting facility/
bio-digester (biogas) with composting facility to treat the
biodegradable waste.
6. PP shall submit BG of Rs. 25 Lakhs towards compliance of EC and
Consent to Establish condition

52 MPCB- IRB SINDHUDURG Approved Up to Committee noted that PP has applied for 1st consent to operate for green
CONSENT- AIRPORT PRIVATE 30.09.2023 field Airport.[ Part-I] for the total plot area 271 Hectors and BUA 16506
LIMITED (IRB 1st Consent to sq. meters. And PP has obtained Consent to Establish for the same activity
0000056005
SINDHUDURG operate (Part-I) on for the total plot area 260 Hectors and BUA 15,253 sq. meters.
AIRPORT PVT LTD, AT
VILLAGE- CHIPPI - Committee also noted the following points:
PARULE, TALUKA- 1. PP has obtained EC for the development of a green field airport on
VENGURLA) Dist: 21.12.2011 for the total plot area 271. 4. Hectors.
Sindhudurg 2. Source of water is from MIDC.
3. PP has installed STP of capacity 24 CMD. Treated water will be used for
irrigation gardening and air conditioning purpose.
4. PP has proposed to install OWC for the solid waste.

In view of above it was decided to grant 1st consent to operate by


imposing following conditions:

1. PP shall submit BG of Rs.5.0 Lakhs towards O & M of PCS to achieve


consented standards.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 33 of 55
2. PP shall submit proposal of STP with time bound program for the
treatment of remaining domestic effluent i.e.325 CMD within two
month in the Board and submit BG of Rs.10 Lakhs towards compliance
of this condition.

Consent shall be issued after receipt of additional consent fees from PP.

53 MPCB- Johnson & Johnson APPROVED Up to Committee noted that PP has applied for consent to Establish for
CONSENT- Private Limited, 476- commissioning expansion for the manufacturing of ORSL base Kit.
0000054522 480, LBS Marg, Consent to of the unit or 5
Mulund West, Establish for year whichever Committee also noted that PP has provided combine ETP of 300 CMD
expansion capacity for the treatment of trade effluent and sewage. The treated
Mumbai-400 080. is earlier.
effluent @70% is used on land for gardening and @30 % discharge to
MCGM swear line.

In view of above, it was decided to grant Consent to Establish for proposed


expansion for mfg. of 2.5 MT/M of ORSL base Kit by forfeiting BG of Rs. 2
Lakh obtained towards submission of BR and top-up with double the
amount for submission of BR within 3 months.

54 MPCB- Gini Citicorp Realty APPROVED Up to It was decided to grant Consent to Establish for proposed construction of
CONSENT- LLP. "Gini Belvista", commissioning residential cum construction project on total plot are 23,100 sq.mtrs. for
0000056239 Survey No 11/1 (Part) Consent to of the unit or 5 total construction BUA 60,398.92 sq.mtrs. by imposing the following
Survey No 11/1 (Part), Establish year whichever conditions;
Village Dhanori, Taluka is earlier.
Haveli, Dist.Pune 1. PP shall not take effective steps towards construction of the project
411015 Haveli prior to obtaining EC from the Competent Authority.
2. PP shall install STP for the treatment of sewage so as to achieve BOD-
10 mg/l.
3. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air conditioning, cooling tower make up, fire-
fighting etc. and remaining shall be utilized on land for gardening.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 34 of 55
4. PP shall install online monitoring system for BOD, TSS and flow at the
outlet of STP with the connectivity to MPCB Server.
5. PP shall install organic waste digester/ bio-digester (biogas) with
composting facility for the treatment of wet garbage.
6. PP shall submit total BG of Rs. 25 Lakhs towards compliance of EC and
consent to establish conditions.

55 MPCB- Gigaplex IT Park APPROVED Up to It was decided to grant Consent to 1st Operate for building No.4 on total
CONSENT- Building No 4 of M/s. 30.9.2020. plot area 2,02,300 sq.mtrs. for total construction BUA 1,28,525.72
Gigaplex Estates Pvt. Consent to 1st sq.mtrs. out of total construction BUA 12,73,966.57 sq.mtrs. by imposing
0000055539
Operate for the following condition;
Ltd., Plot No. 5, Airoli
Knowledge Park, Building No. 4
1. PP shall submit undertaking in Board’s prescribed format within 15
Airoli, MIDC, Navi days towards compliance of Environmental Clearance (EC) and
Mumbai, Dist. Thane. Consent to Operate conditions.
2. PP shall submit the undertaking within 15 days in the prescribed
format regarding the part of built up area/ building for which
application for 1st Consent to Operate (part-II) is made and that the
same is included in the Environmental Clearance accorded.
3. PP shall operate STP so as to achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit.
4. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air-conditioning, cooling tower make up, fire-
fighting etc. and remaining shall be utilized on land for gardening.
5. PP shall operate organic waste digester along with composting facility
and compost obtained shall be used as manure in their own garden/
plantation.
6. PP will be responsible for proper operation & maintenance of
pollution control systems for initial period of five years after Society
formation and afterward handover the facility to the Society for its
further operation in good and working conditions.
7. PP shall submit BG of Rs. 25 Lakhs towards compliance of EC and
Consent conditions.

Consent shall be issued after-

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 35 of 55
1. Obtaining verification report of SRO regarding installation of online
monitoring system for the parameters flow, BOD, TSS at the outlet of
STP and connectivity to MPCB Server.
2. Obtaining Architect Certificate towards completion of construction of
BUA for which they have applied for 1st Consent to Operate

56 MPCB- Balaji Speciality NOT APPROVED ---- Committee noted that PP has applied for grant of Consent to 1st Operate
CONSENT- Chemicals Pvt. for of products 1) Ethylenediamine (EDA)-37350 MT/A and by products
Limited, Plot No. E- Consent to 1st namely 1) Piperizine (PIP)-4050 MT/A, 2) Diethylenetriamine (DETA)-3150
0000049239
8/1, MIDC Chincholi, Operate MT/A, 3) Aminoethyl Piperizine/Hydroxyethy Piperizine/ Aminoethyl
Tal. Mohol, Dist. Ethanolamine - 450 MT/A and 4) Mixture of Higher Amines-330 MT/A.
Solapur. Also obtained EC and C to E which are valid. Provided ESP as APCS for the
coal fired boiler including on line monitoring system. However the
installation of zero liquid discharge system is in progress and not ready for
operation. Also not submitted NOC of NBWL/SBWL.

In view of above it was decided to keep the case in abeyance till


completion of installation work of ZLD system and submission of NOC of
NBWL/SBWL.

57 MPCB- Sahyog Homes APPROVED Up to It was decided to grant re-validation of Consent to Establish for
CONSENT- Limited, CTS No. commissioning construction of Residential & Commercial Project "Raghvendra Sahakar
0000056378 1/C(3) (pt), 397, 397 1 Re-validation of of the project Co. Op. Hsg. Soc." under SRA Scheme on total plot area 27,335.51 sq.mtrs.
Consent to
to 12, 398, 398(1), 399 or up to for remaining construction BUA of 1,00,397.92 sq.mtrs. out of total
(pt), 400 (pt), 405 (pt), Establish with 21/01/2021 construction BUA of 1,43,124.92 sq.mtrs. by imposing the following
406, 407(pt), 408(pt), expansion whichever is conditions;
410 (pt), 218 S.No. earlier.
24/4, 6 & 9, 385 (pt), 1. Industry shall obtain Consent to Operate for completed Rehab Bldg 1,
400 (pt), 408 (pt), 216, 2, 4, 5 & 6 and Sale building 1, 3 & 4 within one month.
376, 376/1, 377, 379, 2. PP shall provide STP so as to achieve the treated domestic effluent
380 & 381 1/2/3 (pt) & standard for the parameter BOD-10 mg/lit.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 36 of 55
410/C (pt), Village- 2. The treated effluent shall be 60% recycled for secondary purposes
Oshiwara, Tal. such as toilet flushing, air conditioning, cooling tower make up, fire-
Andheri, Mumbai. fighting etc. and remaining shall be utilized on land for gardening.
3. PP shall install online monitoring system for BOD, TSS and flow at the
outlet of 310 CMD STP with the connectivity to MPCB Server within
one month.
5. PP shall operate organic waste digester along with composting facility
and compost obtained shall be used as manure in their own garden/
plantation.
6. PP shall obtain NOC from MCGM for disposal of construction debris at
specific site inspected and approved by Municipal Corporation.
7. PP will be responsible for proper operation & maintenance of
pollution control systems for initial period of five years after Society
formation and afterwards handover the facility to the Society for its
further operation in good and working conditions.
8. PP shall submit BG of Rs. 25 Lakhs (including existing) towards
compliance of EC and consent to establish condition.
9. Consent shall be issued without prejudice to the order passed as may
be passed by the Hon’ble Supreme Court of India in special leave
petition Civil No. D23708/2017.

58 MPCB- Godrej High-Rise APPROVED Up to It was decided to grant Consent to Establish (Part-II) for construction of
CONSENT- Properties Pvt. Ltd., commissioning Phase-V (five star hotel with 100 nos. of Rooms) of construction project
0000054141 “The Trees” Project Consent to or 5 year "Godrej Tree" on plot area on total plot area 1,38,402 sq. mtrs. for
Plot `A’ bearing (New Establish whichever is construction of 36,147.53 sq. mtrs. out of 4,25,275 sq. mtrs. by imposing
C.T.S.No. 51/B) earlier. the following conditions;
C.T.S.No. 51 (part), 52,
52/1 to 17 of village 1. PP shall provide STP so as to achieve the treated domestic effluent
Vikhroli, Vikhroli (E), standard for the parameter BOD- 10 mg/lit.
Mumbai – 400 079. 2. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air conditioning, cooling tower make up,
firefighting etc. and remaining shall be utilized on land for gardening.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 37 of 55
3. PP shall install online monitoring system for BOD, TSS and flow at the
outlet of STP and connectivity of online data to MPCB Server.
4. PP shall install organic waste digester along with composting
facility/bio-digester (bio-gas) with composting facility for the
treatment of wet garbage.
5. PP shall obtain NOC from MCGM for disposal of construction debris
at specific site inspected and approved by Municipal Corporation.
6. PP shall submit BG making total Rs. 25 Lakh including existing towards
compliance of EC and consent to establish condition.
7. Consent is issued without prejudice to the order passed as may be
passed by the Hon’ble Supreme Court of India in special leave
petition Civil No. D23708/2017.

59 MPCB- Deepak Fertilizers and NOT APPROVED -- Committee understood that CPCB has issued closure directions to the unit
CONSENT- Petrochemicals for non-provision of online CMS. However, now industry has provided the
Corporation Limited, Consent to 1st
0000054301 same but CPCB has not revoked the closure directions.
Plot K-1 to K-8, MIDC Operate for 70
Industrial Area, Taloja TPH Coal fired In view of above, it was decided to keep the case in abeyance till CPCB
Tal. Panvel, Dist. Boiler & 9 MW revoke the closure directions.
Power
Raigad.
Generation

60 MPCB- INDIABULLS APPROVED Up to It was decided to grant Consent to 1st Operate for Residential Tower 'C'
CONSENT- INFRAESTATE LTD., 31/12/2019. on total plot area 43,603 sq. mtrs. for construction BUA 53,017 sq. mtrs.
C.S. No. 131, 132 & Consent to 1st out of total construction BUA 2,02,712 sq. mtrs. by imposing the following
0000056480
1/132, Lower Parel, Operate (Part-II) conditions;
Near Worli Naka,
Lower Parel, Mumbai. 1. PP shall operate STP so as to achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit.
2. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air conditioning, cooling tower make up, fire-
fighting etc. and remaining shall be utilized on land for gardening.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 38 of 55
3. PP shall extend existing BG of Rs. 25 Lakhs towards O&M of pollution
control system and compliance of Consent to Operate condition.
4. PP shall operate organic waste digester along with composting
facility and compost obtained shall be used as manure in their own
garden/ plantation.
4. PP will be responsible for proper operation & maintenance of
pollution control systems for initial period of five years after Society
formation and afterward handover the facility to the Society for its
further operation in good and working conditions.

61 MPCB- Vodafone Business NOT APPROVED -- It was decided to not to consider industry’s request regarding cancellation
CONSENT- Services Ltd., Plot No. of Consent to Operate which was earlier discussed & approved in CAC
0000033483 B-2/1 MIDC, TTC regarding meeting dated 09.07.2018
cancellation
Industrial Area, Navi-
of Consent to
Mumbai, Dist. Thane. Operate
which was earlier
discussed &
approved
in CAC meeting
dated 09.07.2018
62 MPCB- Lohitka Properties LLP, NOT APPROVED -- Committee noted that PP has applied for grant of Consent to Establish for
CONSENT- C.T.S No. 514, 531(pt) construction of residential cum commercial project on total plot area
Consent to
0000056167 & 531/1 to 14, 532-A, 47,033.46 sq.mtrs. for total construction BUA 51,863.02 sq.mtrs.
532-C & 534 Village Establish
Nahur, Mulund (W), Also, noted that PP has obtained EC from MCGM not from Competent
Authority and carried out construction without obtaining Consent to
Mumbai.
Establish from the Board.

In view of above, it was decided to issue SCN for refusal directing the
industry to stop further construction till EC is obtained from the
Competent Authority.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 39 of 55
63 MPCB- Meringue Hotels APPROVED Up to It was decided to grant Consent to 1st Operate for carrying out Hotel
CONSENT- Private Limited (Lemon 31/12/2019. activity with 307 Rooms including restaurant, swimming pool and retail
Tree Hotel), CTS Consent to 1st shopping (without Laundry activity) on total plot area 5,552.9 sq.mtrs. for
0000056168
No.784 of village Operate total construction BUA 31,319.11 sq.mtrs. by imposing the following
Andheri, Sahar Road, conditions;
CSI Airport, Mumbai-
1. PP shall operate STP so as to achieve BOD standards 10 mg/l.
400 099.
2. 60% of treated sewage shall be recycled/ reused for secondary
purposes like toilet flushing, cooling tower, fire-fighting, gardening
etc. and remaining shall be discharged into MCGM sewer line.
3. PP shall install online continuous monitoring systems for the
parameters Flow, TSS & BOD at the outlet of STP, connect online data
to MPCB Server within 3 months.
4. PP shall operate OWC followed by composting for the treatment of
Biodegradable waste and use it as manure for gardening.
5. PP shall operate organic waste digester along with composting facility
and compost obtained shall be used as manure in their own garden/
plantation.
6. PP shall extend existing B.G. of Rs. 10 Lakh towaerds O&M of pollution
control systems and towards compliance of the C2E & EC conditions.

64 MPCB- KSH Infra Pvt. Ltd., P- NOT APPROVED -- Committee noted that PP has applied for grant of Consent to Operate for
CONSENT- 5, Chakan Industrial whole project of above Multi-modal Logistic & Industrial Park on total plot
Area, Phase-II, Village Renewal of
0000056025 area 1,52,000 sq.mtrs for total construction BUA 1,05,395.94 sq.mtrs.
Khalumbare, Tal. Consent to
Khed, Dist. Pune. Operate Also, noted that PP has obtained EC & Consent to Establish which are
valid.
(Part-I & II)
Further, noted that the details information about the project was called
from SRO, however complete information is not submitted.

In view of above, it was decided to call the PP for presentation before CAC.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 40 of 55
65 MPCB- Reliance Jio Infocomp APPROVED Up to It was decided to club application UAN No. 0000044580 with this
CONSENT- Ltd., P-1/3, Rajiv 30/09/2023. application and grant Consent to 1st Operate for Data Center i.e. IT & ITES
Gandhi Infotech Park, Consent to 1st activity having overall total D.G. Set capacity of 6,250 KVA by imposing
0000055180
Hinjewadi, Tal. Mulshi, Operate B.G. of Rs. 5 Lakh towards compliance of the Consent conditions.
Dist. Pune.

66 MPCB- Hindustan Petroleum NOT APPROVED -- Committee noted that PP has applied for amendment in Consent to
CONSENT- Corporation Limited, Establish for installation of 38 Nos. tanks (with gross capacity of around-
0000056338 CTS No. 382, 382/1 to 3,60,000 KL) in place of 28 Nos. of (with gross capacity of around-4,68,000
382/66 North of HPCL KL).
Mumbai Refinery and
East of B. D. Patil Also, noted that PP has obtained EC for installation of 28 Nos. of (with
Marg, Chembur, gross capacity of around-4,68,000 KL) from MoEF &CC.
Mumbai-400 074. In view of present on Environmental situation at Mahul and ongoing
litigation, It was decided to defer the case and call the PP for presentation
before CAC along with detailed information of Storage tanks & pollution
load before and after change in detailed Engineering of the proposed unit.

67 MPCB- Balaji Amines Ltd-Unit- NOT APPROVED ---- Committee noted that PP has applied for grant of Consent to Establish
CONSENT- IV, Plot No. F-104, for proposed expansion to manufacture of Mono Iso Propyl Amine
Chincholi MIDC, Consent to (MIPA), MIBK, Di Phynel Amine (DPA), N Butyl Thiophosphoric Triamide
0000057234
Establish for
Mohol, Dist. Solapur. (NBPT), Iso Propyl Alcohol (IPA) etc.
proposed
expansion In view of above, it was decided to call PP for presentation on
manufacturing process and pollution control system proposed.

68 MPCB- Kanakia Hotels & APPROVED Up to It was decided to grant renewal of Consent to Operate for Hotel &
CONSENT- Resorts Pvt. Ltd. ( 30/06/2020. Restaurant activity with 299 rooms along with swimming pool and laundry
Formerly known as Renewal of
0000056510 activity by imposing the following conditions;
Kanakia Hospitality Consent
Pvt. Ltd.), CTS No. 25 B 1. PP shall operate STP so as to achieve the treated domestic effluent
& 215A, Village standard for the parameter BOD- 10 mg/lit.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 41 of 55
Chakala Mulgaon, 2. The treated effluent shall be 60% recycled for secondary purposes
Andheri Kurla Road, such as toilet flushing, air conditioning, cooling tower make up,
Andheri (E), Mumbai. firefighting etc. and remaining shall be utilised on land for gardening.
2. PP shall operate organic waste digester along with composting
facility and compost obtained shall be used as manure in their own
garden/ plantation.
3. PP shall extend existing BG of Rs. 25 Lakh towards O&M of pollution
control systems and extend BG of Rs. 10 Lakh towards achieving BOD-
10 mg/l within 6 months.

Consent shall be issued after obtaining requisite Consent fees, if any.

69 MPCB- KOHINOOR CTNL- APPROVED Up to It was decided to grant re-validation of Consent to Establish for proposed
CONSENT- Infrastructure commissioning construction of Residential & Commercial Project "Kohinoor Square" on
Company Private Re-validation of or up to total plot area 19,859.04 sq.mtrs. for total construction BUA of
0000054862
Limited, “KOHINOOR Consent to 31/01/2021 2,45,473.60 sq.mtrs. by imposing the following conditions;
SQUARE”, Kohinoor Establish whichever is
Mill Co. Ltd. No.3, F.P. 1. PP shall provide STP so as to achieve the treated domestic effluent
earlier.
No. 46 Mahim standard for the parameter BOD-10 mg/lit.
Division, Junction of 2. The treated effluent shall be 60% recycled for secondary purposes
N.C. Kelkar Marg, such as toilet flushing, air conditioning, cooling tower make up,
Mumbai. firefighting etc. and remaining shall be utilised on land for gardening.
3. PP shall install online monitoring system for parameters BOD, TSS
and Flow at the outlet of STP with the connectivity to MPCB Server.
4. PP shall install organic waste digester along with composting facility/
bio-digester (biogas) with composting facility for the treatment of
wet garbage.
5. PP shall obtain NOC from MCGM for disposal of construction debris
at specific site inspected and approved by Municipal Corporation.
6. Consent shall be issued without prejudice to the order passed as may
be passed by the Hon’ble Supreme Court of India in special leave
petition Civil No. D23708/2017.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 42 of 55
7. PP shall submit BG of Rs. 25 Lakhs towards compliance of EC and
consent to establish condition.

70 MPCB- M/s. Safal developers APPROVED Up to It was decided to grant Consent to Establish for redevelopment of
CONSENT- Pvt. Ltd., C.S. no. 6(pt) commissioning residential buildings on total plot area 26,329.97 sq.mtrs. for total
C.S. no. 6(pt) of Consent to or 5 year construction BUA 1,67,807.5 sq.mtrs. by imposing the following
0000042676
F/North ward, Sion Establish whichever is conditions;
division, situated at earlier.
Vishramwadi, Bhaudaji 1. PP shall provide STP so as to achieve the treated domestic effluent
road, Sion, Mumbai – standard for the parameter BOD-10 mg/lit.
400 022. 2. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air conditioning, cooling tower make up,
firefighting etc. and remaining shall be utilized on land for gardening.
3. PP shall install online monitoring system for parameters BOD, TSS
and Flow at the outlet of STP with the connectivity to MPCB Server.
4. PP shall install organic waste digester along with composting facility/
bio-digester (biogas) with composting facility for the treatment of
wet garbage.
5. PP shall obtain NOC from MCGM for disposal of construction debris
at specific site inspected and approved by Municipal Corporation.
6. Consent shall be issued without prejudice to the order passed as may
be passed by the Hon’ble Supreme Court of India in special leave
petition Civil No. D23708/2017.
7. PP shall submit BG of Rs. 25 Lakhs towards compliance of EC and
consent to establish condition.

Consent shall be issued after submission of copy of NOC from MCGM for
disposal of construction debris at specific site inspected and approved by
Municipal Corporation.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 43 of 55
71 MPCB- Hindustan Petroleum NOT APPROVED -- Committee noted that PP has applied for amendment in Consent to
CONSENT- Corporation Limited, Establish for increase in Light distillate qty from 465.5 to 547.8 TMT/A,
0000057302 Survey No. 234/482 decrease in Middle distillate qty from 853.0 to 829.0 TMT/A, decrease in
Mumbai Refinery, East Other heavy products including refinery fuel loss qty from 129.0 TMT to
of B.D. Patil Marg, 67.0 TMT, decrease in Elemental Sulphur qty from 41.0 TMT/A to 35.0
Chembur, Mumbai- TMT/A, increase CPP capacity from 81 MW to 90 MW.
400 074.
Also, noted that PP has obtained EC for proposed expansion.

In view of present on Environmental situation at Mahul and ongoing


litigation, It was decided to defer the case and call the PP for presentation
before CAC along with detailed information of Storage tanks & pollution
load before and after change in detailed Engineering of the proposed unit.

72 MPCB- M/s. Lucina Land APPROVED Up to It was decided to grant of Consent to 1st Operate (part-IV) for 3 nos. of
CONSENT- Development Limited, 31.7.2020. buildings of MMRDA Sale scheme i.e. 14G1, 15B & 16 A on total plot area
Consent to 1st 90,219 sq.mtrs. for construction BUA of 1,00,002 sq.mtrs. out of total
0000056837
S.Nos. 80A,83/2A, Operate (Part-VI) construction BUA of 5,99,875 sq.mtrs. by imposing the following
83/3, 83/7+ 4B +5B, for 3 nos. of conditions;
85/0, 86/1, 90/1A, buildings 14G1,
90/1B, 90/3B, 90/4, 15B & 16 A 1. PP shall submit undertaking in Board’s prescribed format within 15
90/7 to days towards compliance of Environmental Clearance (EC) and
90/11,91/2&91/5 Consent to Operate conditions.
2. PP shall submit the undertaking within 15 days in the prescribed
Survey No. 80A to
format regarding the part of built up area/ building for which
92/5, Village Kon and application for 1st Consent to Operate (part-II) is made and that the
Arivali, Tal. Panvel, same is included in the Environmental Clearance accorded.
Dist. Raigad. 3. PP shall operate STP so as to achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit.
4. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air-conditioning, cooling tower make up, fire-
fighting etc. and remaining shall be utilized on land for gardening.
5. PP shall operate organic waste digester along with composting facility
and compost obtained shall be used as manure in their own garden/
plantation.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 44 of 55
6. PP will be responsible for proper operation & maintenance of
pollution control systems for initial period of five years after Society
formation and afterward handover the facility to the Society for its
further operation in good and working conditions.
7. PP shall submit BG of Rs. 25 Lakhs towards compliance of EC and
Consent conditions.

Consent shall be issued after-

1. Obtaining verification report of SRO regarding installation of online


monitoring system for the parameters flow, BOD, TSS at the outlet of
STP and connectivity to MPCB Server.
2. Obtaining Architect Certificate towards completion of construction
of BUA for which they have applied for 1st Consent to Operate (part-
IV) with submission of consent fee, if any.

73 MPCB- Indoco Remedies APPROVED Up to It was decided to grant Consent to 1st Operate for proposed expansion
CONSENT- Limited, Plot No. A-26, 31/01/2021. with amalgamation with existing Consent as per Board's Policy by
0000057988 A-27, A-28/1 & A- Consent to 1st imposing the following conditions:
Operate for
28/2, MIDC Industrial
Area, Patalganga, Tal. expansion and 1. Industry shall operate ETP so as to achieve Consented standards.
amalgamation 2. Industry shall recycle/reuse 93.625 CMD treated effluent from
Khalapur, Dist. Raigad.
proposed expansion and restrict discharge of 25.2 CMD treated
effluent into CETP as per EC & existing C to O.
3. Industry shall provide online CMS for effluent & stack parameters as
per CPCB directions/ guidelines and connect online monitoring data to
CPCB & MPCB Servers.
4. Industry shall extend C to E BGs for Compliance of Consent conditions.

74 MPCB- Gennova APPROVED Up to It was decided to grant Consent to 1st Operate (clubbing with application
CONSENT- Biopharmaceuticals 30/04/2023. UAN No. 0000028085) for expansion, grant renewal of Consent to
0000058175 Ltd., 1st & 2nd Floor, Renewal of Operate for existing unit and amalgamation by imposing the following
Plot No. 2A 1st & 2nd Consent to conditions;
Floor, Plot No. 2A, Operate, Consent
IBPL, Chrysalis to 1st Operate

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 45 of 55
Enclave, Building No. for expansion 1. Industry and service provider M/s International Biotech Park Ltd. both
2, MIDC Hinjewadi and will be equally responsible for the operation and maintenance of
Phase - II, Tal - Mulshi, amalgamation common ETP & STP and will be held severally responsible in case, if
Dist - Pune. JVS result exceeds the Consented standards.
2. Industry shall extend all existing BGs towards O&M of STP, ETP and
towards compliance of the Consent conditions.

Consent shall be issued after obtaining additional Consent fees, if any.

75 MPCB- M/s. BramhaCorp APPROVED Up to It was decided to grant Consent to Establish for proposed expansion of
CONSENT- Limited, S. No. 11, commissioning Commercial & residential project "Pune One" on total plot area 15,490.08
Consent to
0000058472 11/1 to 11/18, 12/3 & or 5 year sq. mtrs. for total construction BUA 1,40,113.86 sq. mtrs. by imposing the
12/4 Cannaught Road, Establish for whichever is following conditions;
Sadhuwaswani Chowk, expansion earlier.
1. PP shall install STP for the treatment of sewage so as to achieve BOD-
Tal. Haveli, Dist. Pune.
10 mg/l.
2. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air conditioning, cooling tower make up, fire-
fighting etc. and remaining shall be utilized on land for gardening.
3. PP shall install online monitoring system for parameters BOD, TSS and
Flow at the outlet of STP with the connectivity to MPCB Server.
4. PP shall install organic waste digester/ bio-digester (biogas) with
composting facility for the treatment of wet garbage.
5. PP shall submit total BG of Rs. 25 Lakhs (including existing BG of Rs. 10
Lakh) towards compliance of EC and consent to establish conditions.

76 MPCB- M/s. Bharat Petroleum APPROVED Up to It was decided to grant Consent to Establish for proposed expansion for
CONSENT- Corporation Limited commissioning erection of Storage tanks for 2 x 3,415 KL Biodiesel and 1 X 858 KL Ethanol
(BPCL), Manmad Consent to or 5 year
0000057843 by imposing the following conditions;
Nandgaon Road, Establish for whichever is
expansion 1. Industry shall not take effective steps towards establishment prior to
Panewadi, Manmad. earlier.
obtaining EC.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 46 of 55
2. Industry shall furnish BG of Rs. 10 Lakh towards compliance of the C
to E conditions.
3. Industry shall obtain permission from Petroleum & Explosives Safety
Organization (PESO) for handling Petroleum Products of proposed
expansion.
4. Industry shall provide above ground floating roof tanks for Ethanol
storage.
5. Industry shall use vapour balancing truck for transportation of
Petroleum Products.
6. Truck filling bays shall be equipped with vapour collection & treatment
system.

77 MPCB- Kumar Properties & NOT APPROVED -- Committee noted that PP has applied for grant of renewal of Consent to
CONSENT- Real Estate Pvt. Ltd. Operate (Part-I) for increased construction BUA 1,53,714.25 sq.mtrs.
(Park Infinia), Survey Re-validation of (increased by 96,074.50 sq. mtrs.) out of total built up area 2,74,527.6 sq.
0000056738
No. 214(P), 220(P) & Consent to mtrs. on total plot area 1,55,950 sq. mtrs. for development of Residential
221(P), Phursungi, Tal. Operate (Part-I)
Project "Park Infinia".
Haveli, Dist. Pune. with expansion
Also, noted that PP has obtained EC for expansion on 01/09/2018 for
increase in total construction BUA from 1,41,318 sq. mtrs. to 2,74,527.6
Sq.mtr. and applied for Consent to Establish for proposed expansion as
per EC on 17/09/2018.

Further applied for renewal of Consent to Operate for increased


construction BUA 1,53,714.25 sq. mtrs. on 18/09/2018 which prima facie
indicates that PP has undertaken excess construction without obtaining
prior EC & C2E for expansion.

In view of above, it was decided to defer the call the PP for presentation
before CAC along with explanation for above lapses.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 47 of 55
78 MPCB- Indiabulls Properties APPROVED Up to It was decided to grant renewal of Consent to Operate for Residential
CONSENT- Private Ltd., CS No. 30/06/2020. Building on total plot area 9,719.97 sq.mtrs. and total construction BUA
0000050542 882, Lower Parel 66,875 sq.mtrs. by imposing the following conditions;
Division, Jupitor
Textile Mill, Senapati 1. PP shall operate STP so as to achieve standards for parameter BOD-10
Bapat Marg, Lower mg/l.
2. PP shall make provision of online CMS for parameters Flow, BOD & TSS
Parel, Mumbai.
at the outlet of STP and connect online monitoring data to MPCB
Server within 3 months.
3. PP shall operate organic waste digester along with composting facility
and compost obtained shall be used as manure in their own garden/
plantation.
4. PP shall extend existing BG towards O&M of STP, OWC and towards
compliance of the C to O conditions.

Consent shall be issued after obtaining additional Consent fees, if any.

79 MPCB- M/s Karanja Terminals Approved Up to Committee noted that PP has applied for revalidation of the Part C to E
CONSENT- & Logistics Pvt Ltd. commissioning for remaining 50 Hectors of Port Operational area and remaining 6 Nos of
Re validation of
0000058500 of the unit or Berths i.e 600 mtrs. [ CI RS. 386 Crs]. PP has obtained C to E on 03.08.2012
Karanja Creek, consent to up to for the development of multipurpose terminal Facility of 1000 mtrs water
Tal:Uran Dist: Raigad. Establish. 21.08.2020. front.

Committee also noted following points:

1. PP has obtained Environment and CRZ clearance was obtained on


21.08.2013 for the development of Multipurpose terminal and ship
repair yard in the intertidal zone about 800 meters off the existing
saline bund Khar Bund at Village Chanje, Tal.- Uran, Dist. Raigad.
2. PP has applied for Part consent to 1st Operate for 4 Nos of Berth i.e 400
mtrs out of 1000 mtrs for C.I of Rs.290.00 Crs. 5. The construction work
of the 4 Nos of Berths i.e 400 mtrs is completed. Another 100 mtrs
piling work is completed and the remaining work is in progress and 30

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 48 of 55
Hectors work of the port operational area out of 80 Hectors is
completed.
3. Application No. 30 of 2017 is filed by Karanja Machimar Vividha
kalyankari Society Ltd., before the Hon’ble NGT (WZ). Board has
submitted affidavit in reply on 15/05/2017. The matter is subjudice.
4. Application No. RCC/71/2017 Filed by the Board regarding safety bund
violation before JFMC Uran filed by MPC Board , before the JFMC Uran.
The matter is subjudice.

In view of above it was decided to grant re-validation of consent to


Establish without prejudice to order may be passed by Hon'ble NGT/High
Court order related to legal issues of this port by imposing conditions:

1. PP shall submit BG of Rs.5.0 Lakhs towards compliances of consent


conditions.

Consent shall be issued after receipt of additional consent fees from PP.

80 MPCB- Gharda Chemicals APPROVED Up to It was decided to grant renewal of Consent to Operate for captive co-
CONSENT- Limited (Unit No-3), 31/12/2023. generation power plant of 6.4 MW & Steam generation of 86 MT/Hr by
Plot No. F-1/1, MIDC, Renewal of
0000059293 imposing the following conditions;
Lote Parshuram, Tal. Consent
1. Industry shall extend existing BG of Rs. 5 Lakh towards O&M of
Khed, Dist. Ratnagiri.
pollution control systems and towards compliance of the Consent
conditions.

81 MPCB- Mumbai Aviation Fuel APPROVED Up to It was decided to grant of Consent to 1st Operate (part) for Common fuel
CONSENT- Farm Facility Pvt. Ltd., 31/12/2020. farm for ATF storage (3 nos. of storage tank for 36,650 KL) & dispensing
0000059375 Terminal 1 near gate Consent to 1st at Santacruz Airport Terminal by imposing the following conditions;
9, CSMIA, Opp. ITC Operate (part)
Maratha, Sahar Police 1. PP shall comply with the EC & Consent conditions.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 49 of 55
Station Road, Andheri for ATF storage & 2. PP & MIAL both shall be equally & jointly held responsible for the O&M
(East), Mumbai. dispensing of STP and in case, if analysis result exceeds the Consented limits then
both parties will be liable for initiation of action against them.
3. PP shall submit BG of Rs. 10 Lakh towards O&M of pollution control
systems & towards compliance of the EC & Consent conditions.
4. PP shall use vapour balancing system for truck carrying fuel from
storage tanks to Aircraft.
5. ATF shall be stored in floating roof tank with double seal system.

82 MPCB- M/s Firstwave APPROVED Up to It was decided to grant Consent to Establish for Mix development project
CONSENT- Developers LLP, CS No. commissioning on total plot area 5,560.24 sq.mtrs. for total construction BUA of 54,986.2
0000059220 534 of Matunga Consent to or 5 year sq.mtrs. by imposing the following conditions;
Division, Mahavir Establish whichever is
Compound, earlier. 1. PP shall provide STP so as to achieve the treated domestic effluent
Bhandarkar Road, standard for the parameter BOD-10 mg/lit.
2. The treated effluent shall be 60% recycled for secondary purposes
Matunga (E), Mumbai.
such as toilet flushing, air conditioning, cooling tower make up,
firefighting etc. and remaining shall be utilized on land for gardening.
2. PP shall install online monitoring system for BOD, TSS and flow at the
outlet of STP with connectivity to MPCB Server.
3. PP shall submit Board Resolution within 15 days that they have
violated Environmental Laws by starting construction activity prior to
obtaining Consent to Establish from the Board and will not do so in
future. PP shall submit BG of Rs. 2 Lakh towards compliance of this
condition.
4. PP shall install organic waste digester along with composting
facility/bio-digester (biogas) with composting facility for the
treatment of wet garbage.
5. PP shall obtain NOC from MCGM for disposal of construction debris at
specific site inspected and approved by Municipal Corporation.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 50 of 55
6. Consent shall be issued without prejudice to the order passed as may
be passed by the Hon’ble Supreme Court of India in special leave
petition Civil No. D23708/2017.
7. PP shall obtain amendment in EC within 3 months for change in name.
8. PP shall submit BG of Rs. 25 Lakhs towards compliance of EC and
consent to establish condition.

83 MPCB- SAHRUDAYA Combined Up to Committee noted that PP has applied for combine consent and
CONSENT- HEALTHCARE PVT. LTD Consent and 31.03.2021. authorization for 225 beds. PP has submitted copies of BNH, Details of
0000060156 ASHOKA MEDICOVER BMW ETP/STP provided and submitted information of BMW generation as per
HOSPITALS, PLOT NO 2 Authorization schedule -III.
NEAR IT PARK, SURVEY
NO 113/2 PLOT NO 2 In view of above it was decided to grant Combine consent and BMW
NEAR INDIRA NAGAR authorization by imposing following conditions:
JOGGIN TRACK 1. PP shall submit BGs as per the regime of HCS.
WADALA ROAD,
Nashik. Consent shall be issued after receipt of information of BUA and obtaining
additional consent fees from PP.

84 MPCB- Indian Oil Corporation APPROVED Up to It was decided to grant Consent to Establish for proposed expansion for
CONSENT- -Ahmednagar Depot, commissioning erection of isolated storage tanks for 60,615 KL of Motor Spirit by
0000060113 337, 338/2, 339/, 340, Consent to or 5 year imposing the following conditions;
357, 358, 359, 360, Establish for whichever is
Village Akolner, Tal. & expansion 1. Industry shall store all 'A' Class Petroleum Products in floating roof
earlier.
Dist. Ahmednagar. with double seal.
2. Industry shall obtain re-validation of permission obtained from
Petroleum & Explosive Safety Organization (PESO).
3. Industry shall use vapour balancing trucks for transportation of
Petroleum Products.

4. Truck filling bays shall be equipped with vapour collection and


treatment system.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 51 of 55
5. Industry shall maintain existing BG of Rs. 5 Lakh towards O&M of
pollution control systems and towards compliance of the Consent &
EC conditions.

Consent shall be issued subject to order passed or being passed by


Hon'ble NGT in the matter of application bearing No. 42/2014 and/or
28/2017.

85 MPCB- Emitec Emission APPROVED Up to It was decided to grant consent to establish by imposing following
CONSENT- Control commissioning conditions;
0000059965 Technologies India Consent to or 5 year 1. Industry shall submit the BG of Rs. 5 lakh towards compliance of
Pvt. Ltd. Plot No.B-2 Establish whichever is consent to establish conditions.
earlier.
Talegaon Industrial
Area Phase-II Maval 2. Industry shall make the arrangement for reuse/recycle 50 CMD
treated domestic effluent in process, cooling tower, toilet
flushing etc. and shall use 58 CMD treated domestic effluent on
3 acres of land for gardening

86 MPCB- Sterlite APPROVED Up to It was decided to grant 1st Consent to Operate for expansion and
CONSENT- Technologies 31.01.2021 their amalgamation with existing consent.
0000059881 Limited, Plot No AL- 1st Consent to
23, MIDC Shendra, Operate for Consent shall be issued after verification report from SRO regarding
Aurangabad expansion and completion of installation of plant and machinery and STP plant, as
their industry informed that the installation of plant and machinery and
amalgamation STP plant is completed
with existing Consent shall be issued after submission of additional requisite
consent consent fee, if any.

87 MPCB- Sterlite APPROVED Up to It was decided to grant 1st consent to operate by imposing
CONSENT- Technologies 28.02.2020 following conditions;
0000058903 Limited, Plot No A- 1st Consent to 1. Industry shall submit the BG of Rs. 5 lakh towards O&M of
Operate pollution control system.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 52 of 55
1/7, MIDC Shendra, 2. Industry shall 100% treat the spent acid.
Aurangabad
Consent shall be issued after submission of additional requisite
consent fee, if any.
88 MPCB- M/s- Godavari APPROVED -- It was decided to grant amendment in Consent to Operate for inclusion of
CONSENT_AM Biorefineries Ltd., A/p- products Acetaldehyde- 1,500 MT/M, Acetic Acid- 598.85 MT/M, Dilute
MENDMENT- Sakarwadi, Tal- amendment in Acetic Acid110 MT/M & Ethyl Acetate- 5,400 MT/M and changes in fuel
Kopergaon, Dist- Consent to consumption, incorporation of e-waste, HW as per application & non-HW
0000000453
Ahmednagar. Operate by imposing the following conditions;

1. Industry shall maintain record of consumption and purchase of


Specially Denatured Spirit (SDS) through Maharashtra State Excise
Dept.
2. Industry shall comply with the CPCB closure directions issued for
Distillery on 17/07/2013.

89 MPCB- MANIKGARH CEMENT Approved --- Committee noted that Industry has submitted application for
CONSENT_AM MANIKGARH CEMENT Amendment in amendment in consent to operate and request letter for Change in name.
MENDMENT- UNIT II 60 MW CPP Consent to M/s Manikgarh Cement Ltd to M/s Manikgarh Cement / Manikgarh
0000001108 MANIKGARH CEMENT operate for Cement, Unit-II "(A unit of Century Textile s and Industries Ltd)”.
LIMESTONE MINES change in name
(MANIKGARH Committee also noted that Board has granted consent to operate on
CEMENT, 22.05.2018 in the name of M/s Manikgarh Cement Ltd which is valid up
GADCHANDUR), to 31.10.2020 and obtained EC in the name of Manikgarh Cement
Sr.No.146 to 163, Limited.
Taluka: Koprana, Dist: In view of it was decided to grant amendment in consent for change in
Chandrapur. the name of industry from M/s Manikgarh Cement Ltd to M/s Manikgarh
Cement / Manikgarh Cement, Unit-II "( A unit of Century Textiles and
Industries Ltd)" with condition that industry shall amend the EC
accordingly within 3 months.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 53 of 55
90 MPCB- Lavgan Dockyard Pvt Approved ---- Committee noted that PP has submitted application for amendment in
CONSENT_AM Ltd , Village- Sande Amendment in consent i.e. Change in name from M/s Lavgan Dockyard Pvt. Ltd to
MENDMENT- Lavgan, Post- Jaigad, Consent to Chowgule And Company Private Limited. Board has granted consent to
0000001158 Tal & Dist-Ratnagiri. operate for operate in the name of M/s Lavgan Dockyard Pvt. Ltd, for Ship repairing
change in name and Maintenance activity (without ship Breaking activities)(at 6 Berths
along with ship transfer system only for ship repairing activity) which is
valid up to 30.09.2021.

Committee also noted that PP has submitted copy of the letter dated
31.07.2018 stating that merger of Lavgan Dockyard Private Limited (LDPL)
with Chowgule And Company Private Limited (CCPL).

In view of it was decided to grant amendment in consent for Change in


name from M/s Lavgan Dockyard Pvt. Ltd to Chowgule And Company
Private Limited.

91 MPCB- Lavgan Dockyard Pvt Approved --- Committee noted that PP has submitted application for amendment in
CONSENT_AM Ltd , Village- Sande Amendment in consent to operate for change in activities in sr.no.3. i.e. provision of dry
MENDMENT- Lavgan, Post- Jaigad, Consent to docking, repairs, refit & conversion for ship rigs & floating structures &
0000001471 Tal & Dist-Ratnagiri. operate for fabrication and decommissioning of offshore/ onshore structures and
change activity load out within yard premises and change in sr.no.6.i.e. metal scrap
and non HW instead of metal scrap (nonferrous)

Committee also noted that PP has obtained consent from the Board for
ship repairing and maintenance activity (without ship breaking activities)(
at 6 berths along with ship transfer system only for ship repairing activity)-
200 Vessels/year. This consent is valid up to 30.09.2021.

In view of above it was decided to grant amendment in consent with the


change in activity and change in non-hazardous qty.

92 MPCB- M/s RADISSON BLU NOT APPROVED ----- It was decided to defer this case and revert in the next CAC along with
CONSENT_AM HOTEL, NAGPUR (UNIT present compliance report of SRO along with the latest JVS reports.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 54 of 55
MENDMENT- OF BESTECH Renewal of
0000008824 HOSPITALITIES PVT. Consent
LTD.)., Plot No. 07,
Wardha Road, Nagpur.

8th meeting of 2018-19 (Booklet No. 14 (Part-II) of Consent to Establish/Operate/ Renewal) dtd. 11.12.2018 Page 55 of 55

You might also like