WELL CONSTRUCTION 1.

0 DRILLING OVERVIEW

SECTION 1.0

DRILLING OVERVIEW

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION

Learning Objectives:
You should be able to:
• Understand the roles of a drilling engineer during a well
construction operations.
• Explain the importance and the benefits to be gained
from a properly constructed well.
• Explain the various stages of well construction in
PCSB’s drilling operations.

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION 1.0 DRILLING OVERVIEW

Drilling Overview

> Why we drill a well ?


> Drilling history
> Life of Field w/relation to Drilling
> Basic well types - exploration, development,
etc.
> Basic well configuration - casing scheme &
completions
> Specifications

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION 1.0 DRILLING OVERVIEW

WHY WE DRILL A WELL ?

to gather information to produce hydrocarbons


• for subsurface evaluation • to produce oil or gas

to inject gas or water


• for reservoir pressure maintenance
• for gas conservation

to “kill” a blow out well for geothermal power


• to regain control of a blow • to produce steam for electric
out well generation

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION 1.0 DRILLING OVERVIEW

WHEN WAS THE FIRST WELL DRILLED ?

• First commercial well was drilled in USA in 1859


• Drilled by Col Edwin L. Drake

• First well drilled in Malaysia was in 1910


• drilled by Shell in Miri (Canada Hill) also called Grand Old Lady

• PCSB was established on 11 May 1978

• First well drilled by PCSB was for the Duyong field


in Aug1980

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION 1.0 DRILLING OVERVIEW

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION 1.0 DRILLING OVERVIEW

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION 1.0 DRILLING OVERVIEW

The Grand
Old Lady

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION 1.0 DRILLING OVERVIEW

Duyong Platform Complex (Gas Field)

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION 1.0 DRILLING OVERVIEW

False alarm !
It’s untreated sewage…..

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION 1.0 DRILLING OVERVIEW

LIFE OF FIELD CYCLE - DRILLING INVOLVEMENT

In Production and Abandonment Phases - Drilling is involved in


Infill Drilling, Workover, and Well Abandonment

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION

The look inside the workflow


PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION 1.0 DRILLING OVERVIEW

BASIC WELL TYPES

Exploration wells
• “Wild Cat”
 the first exploration well drilled in a new field with no offset well
information available to obtain data and prove hydrocarbon
presence.

• Appraisal / Delineation
 the subsequent wells drilled after a wild cat well to further
assess the field and confirm its commerciality.

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION 1.0 DRILLING OVERVIEW

An exploration
well is the ONLY
way to prove that
hydrocarbons are
present

Followed by
appraisal and
development wells

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION 1.0 DRILLING OVERVIEW

BASIC WELL TYPES


.
Development wells
• Oil and/or Gas producer
 drilled to produce the hydrocarbon, oil and/or gas.

• Water injector
 drilled for reservoir pressure maintenance

• Gas injector
 drilled for reservoir pressure maintenance or gas
conservation (avoid flaring of gas, prohibited under
certain environmental conditions)

• Combination wells
 combination of the above e.g oil producer with gas
injector or appraisal development wells

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION 1.0 DRILLING OVERVIEW

BASIC WELL TYPES


.
Others
• Geothermal wells
 Drilled in volcanic areas to inject water & produce steam to
generate electricity

• Water wells
 To produce water

• Drilled cuttings disposal


 Use to re-inject cuttings into the formation for disposal

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION 1.0 DRILLING OVERVIEW

BASIC WELL CONFIGURATION


Typical casing configuration Types of well completion

P
R
OD
UC
E
R I
NJE
C
TO
R
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION 1.0 DRILLING OVERVIEW

Drilling Operations - Making Holes


Typical Sequence of Operations :
• Rig up

Depth reference
below derrick floor - bdf
rotary kelly bushing - rkb

Main deck

Cellar deck

depth reference Sea level Conductor

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION

To diverter line

Install diverter

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION

Surface Casing

Drilling Fluid

Drill 17 1/2”
hole

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION

Surface Casing

Stab-in float collar

Run 13 3/8”
casing

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION

Surface Casing

5” Drill Pipe Stinger


Installed after running casing

Drilling Fluid

13-3/8” Casing

Run cement
Carig
stinger
ali
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION

Surface Casing

5” Drill Pipe Stinger

Cement Slurry

13-3/8” Casing
being cemented

Cement the
surface
casing
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION

Surface Casing

5” Drill Pipe Stinger

Drilling Fluid

13-3/8” Casing
cemented in place
Displace the
cement from
the stinger
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION

13 3/8” Casing
(still suspended from the drill floor)

BOP Diverter
(to be removed)

13 3/8” Casing

13 3/8” Casing Prepare to


cemented to surface remove the
diverter and
PETROLEUM ENGINEERING SG-10
excess casing
WELL CONSTRUCTION

Remove Diverter

Drain and cut


the casing

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION

Fillet-Weld casing head


to 13 3/8” casing

Side outlet valve


13 3/8” Casing head

Install casing
head housing

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION
Mud Riser
(allows drilling fluid
returns to mud system)

BOP Stack

Ring joint flange


connects BOP to
casing head

Install BOP
stack and
mud riser
13-3/8” Casing
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION

BOP Test Plug


run on drill pipe

Pressure test
BOP stack
and well head
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION

12-1/4” Drilling Assembly

Well head wear


protection sleeve

Run 12 1/4”
drilling
assembly
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION

Drilling out cement inside


13 3/8” casing
shoe track

Drill out
casing shoe
track
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION

13-3/8” Casing Shoe


Drilling Fluid
returning up
annulus

Drill 12 1/4”
hole section

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION

Intermediate Casing
Drilling Fluid

9-5/8” Casing

Casing Float Collar

Casing Float Shoe


Run 9 5/8”
casing

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION

Intermediate Casing
Drilling Fluid

9-5/8” Casing

Cement slurry
behind casing
and in shoe track

Cement
9 5/8” casing

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION
9 5/8” casing suspended
from rotary table

9 5/8” Casing

13 5/8” Casing Head


Prepare to lift
the BOP
13 3/8” Casing stack
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION

BOP lifted to assist installation


of casing slips in casing Head
9 5/8” Casing

9 5/8”casing slip
& seal assembly

13 5/8” Casing Head


Install casing
slip & seal
assembly
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION

Holes cut to drain mud

9 5/8”
casing slips
13 5/8”
Casing head housing
Drain & cut
9 5/8” casing
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION

Casing spool Side Outlet Valve

9 5/8” Casing 9 5/8”


casing slips
13 5/8” Casing Head
Install casing
spool

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION

BOP stack

Casing Spool

Re-install
BOP stack

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION

BOP Test Plug

Pressure test
BOP stack

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION

8 1/2” Drilling assembly

Protection sleeve

9 5/8” Casing

Run 8 1/2”
drilling
assembly
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION

9 5/8” Casing float shoe

Drill out 9 5/8”


casing shoe
track
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION

9-5/8” Casing shoe

Drill through cap rock Shale


(impermeable formation) into
reservoir

Sandstone
Drill into or
Limestone Continue
reservoir
drilling into
the reservoir
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION

Production casing

Run and
cement the
production
PETROLEUM ENGINEERING SG-10
casing
WELL7” casing slip
CONSTRUCTION
and seal assembly
BOP lifted to assist
installation of slip and seal
assembly

Casing Spool
9-5/8” Casing

Set the 7”
casing slip
and seal
PETROLEUM ENGINEERING SG-10
assembly
WELL CONSTRUCTION

Holes cut to drain mud

Drain and cut


the production
casing
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION

Tubing Spool
Side Outlet Valve

Casing Spool

Casing Head
Install the
tubing head
spool
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Re-install BOP

Bit and scraper assembly


for 7” casing
Protective Sleeve
7” Casing

Run bit and


casing
scraper
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION

Casing scraper

Production
casing Bit

Run bit and


casing scraper
to clean out
casing
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION

Production casing

Perforations

Perforate casing
in selected
production
PETROLEUM ENGINEERING SG-10
interval
WELL CONSTRUCTION

Production tubing

Production casing
Production packer

Tail pipe

Install well
completion

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION

Tubing hanger

Production tubing

Suspend
production
tubing on
PETROLEUM ENGINEERING SG-10
tubing hanger
WELL CONSTRUCTION

Connection
to flow line

Christmas tree

Remove BOP
and Install
Christmas
PETROLEUM ENGINEERING SG-10
tree
WELL CONSTRUCTION 1.0 DRILLING OVERVIEW
FUNDAMENTALS OF DRILLING OPERATIONS

TYPICAL SEQUENCE OF DRILLING OPERATIONS


Exploration/Appraisal Well - Floating Drilling Unit
• Anchor & Position rig
• Spud well, drill pilot hole and open pilot hole
• Run conductor casing & Permanent Guide Base
• Drill pilot hole/surface hole
• Set surface casing
• Run BOP on marine riser
• Drill intermediate hole (pilot hole if necessary)
• Log intermediate hole
• Set intermediate casing
• Test BOP
• Drill/core production hole
• Run logs
• Set production casing
• Perform well testing
• Plug and abandon, move off location

PETROLEUM ENGINEERING SG-10


WELL CONSTRUCTION 1.0 DRILLING OVERVIEW

TYPICAL SEQUENCE OF DRILLING OPERATIONS


Development Well - Jack-up or Tender Assisted
• Position rig
• Skid rig over slot
• Clean out conductor
• Set cement plug
• Drill top hole (pilot hole if first well)
• Set surface casing
• Install & test BOP
• Drill intermediate hole
• Set intermediate casing
• Install & test BOP
• Drill production hole
• Run logs
• Set production casing
• Complete well
• Skid rig